Home / Browse projects / Mumbai Suburban, Maharashtra / THE NEXT LEVEL COMMERCIAL
THE NEXT LEVEL COMMERCIAL
By DHARTI SIMRAN INFRASTRUCTURE LLP
RG-MH-19243 · RERA P51800078324 · Last updated on MahaRERA portal: 30 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 1 complaint at MahaRERA
- Completion date moved by 12 months
- 1 extension taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
THE NEXT LEVEL COMMERCIAL is a Commercial project by DHARTI SIMRAN INFRASTRUCTURE LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800078324 on 4 Dec 2024. Possession is promised by 15 Dec 2030. The completion date has moved by 12 months from the original filing. 0 of the 217 units on this registration are recorded sold or booked, and 0 of 10 construction stages are filed complete. 1 complaint is on record with the regulator.
At a glance
Project
- NameTHE NEXT LEVEL COMMERCIAL
- TypeCommercial
- Location
- S V ROAD
- BORIVALI
- Kanheri
- Mumbai Suburban
- 400092
- Pincode400092
- RERA no.P51800078324
- ReraGenie IDRG-MH-19243
Builder
- NameDHARTI SIMRAN INFRASTRUCTURE LLP
- Entity typePartnership
- GSTIN27AAPFD3210Q1Z3
- PartnersMILAN NEMJI GALA, SAMIR PRAVIN SANGHVI
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on4 Dec 2024
- Promised completion15 Dec 2030
- Revised completionRevised to 15 Dec 2030 (originally 15 Dec 2029)
- Buildings1 building record
- Documents filed69 files
Current status
Figures as on 30 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SALE COMMERCIAL TOWER | NA | 26 | 24 | 0 | 217 | 217 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 30 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 10 construction stages are filed complete. The stage furthest along is Excavation, at 0%.
SALE COMMERCIAL TOWER: 0% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | Not applicable |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 30 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | No | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed491
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| VEE PEE CONSTRUCTIONS PRIVATE LIMITED | Borivali | Mumbai Suburban |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| SALE COMMERCIAL TOWER | NA | Rs 142.00 cr | Rs 3.16 cr |
Certifying professionals and partners8
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | JITENDRA B PATEL |
| Architect | Jitendra PATEL |
| Architect | MEHUL JITENDRA KANAKIA |
| Engineer | RUPESH RAMCHANDRA CHOWDHARY |
| Engineer | Rupesh Chowdhary |
| Engineer | UNISTEPS CONSULTING |
| Chartered Accountant | NEHALI & CO |
| Chartered Accountant | NEHALI DHAVAL DOSHI |
| Partner | Role in project |
|---|---|
| DHARTI SIMRAN INFRASTRUCTURE LLP | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterWe respectfully submit the following statement explaining the technical reason for delay in completion of the plinth work of the above-referenced project: There is ongoing litigation before the Hon'ble High Court of Judicature at Bombay, details of which are as follows: IN THE HIGH COURT OF JUDICATURE AT BOMBAY ORDINARY ORIGINAL CIVIL JURISDICTION WRIT PETITION (L) NO. 25510 OF 2024 WITH INTERIM APPLICATION (L) NO. 25524 OF 2025 WITH INTERIM APPLICATION (L) NO. 18104 OF 2025 Velkar Ramanlal Welfare Association... Petitioner Versus State of Maharashtra Through Housing Minister Respondents WITH
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12401286 | SHARYU Ganesh MOGARE | DHARTI SIMRAN INFRASTRUCTURE LLP | 30/12/2024 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 10 Aug 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 12 Aug 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 12 Aug 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 19 Nov 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 15 Dec 2030
Documents filed69
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: January Quater form 1 (architect certificate).pdf | 30 May 2026 |
| Withdrawal Update Form 2File: P 603 Form 2 The Next Level Commercial March 2026 R0.pdf | 30 May 2026 |
| Withdrawal Update Form 3File: 26-5-26 Withdrawal Application Form3 (1).pdf | 30 May 2026 |
| Withdrawal Update Form 1File: June Quater form 1 (architect certificate) (1).pdf | 26 Feb 2026 |
| Withdrawal Update Form 1File: September Quater form 1 (architect certificate) - Copy.pdf | 26 Feb 2026 |
| Withdrawal Update Form 1File: December Quater form 1 (architect certificate) - Copy.pdf | 26 Feb 2026 |
| Withdrawal Update Form 2File: Form 2 The Next Level (Commercial)June-2025.pdf | 26 Feb 2026 |
| Withdrawal Update Form 2File: Form 2 The Next Level SEP-2025.pdf | 26 Feb 2026 |
| Withdrawal Update Form 2File: Form 2 The Next Level DEC-2025.pdf | 26 Feb 2026 |
| Withdrawal Update Form 3File: Resigned CA Certificate dharti simran commercial june25.pdf | 26 Feb 2026 |
| Withdrawal Update Form 3File: Resigned CA Certificate dharti simran commercial sept25.pdf | 26 Feb 2026 |
| Withdrawal Update Form 3File: Resigned CA Certificate dharti simran commercial dec25.pdf | 26 Feb 2026 |
| Form 1File: THE NEXT LEVEL COMMERCIAL FORM 1 - MARCH 2025.pdf | 5 Jun 2025 |
| Form 2File: THE NEXT LEVEL COMMERCIAL FORM 2 - MARCH 2025.pdf | 5 Jun 2025 |
| Form 3File: THE NEXT LEVEL COMMERCIAL FORM 3 - MARCH 2025.pdf | 5 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Inventory Disclosure.pdf | 5 Jun 2025 |
| Self-declaration of Quarterly ProgressFile: DHARTI SIMRAN DECLARATION OF QPR.pdf | 5 Jun 2025 |
| Proforma of Allotment letterFile: Next Level Final Allotment Letter.pdf | 17 Dec 2024 |
| Proforma of Agreement for saleFile: RERA AFS NEXT LEVEL.pdf | 17 Dec 2024 |
| Deviation Report with respect to model copy of AgreementFile: Deviation Report _14-end.pdf | 28 Nov 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: cc.pdf | 19 Nov 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF INTEREST SURJIT SINGH.pdf | 11 Nov 2024 |
| Details of encumbrances concerned to FinanceFile: NO ENCUMBRANCE (20).pdf | 4 Nov 2024 |
| Details of encumbrances concerned to LegalFile: NO ENCUMBRANCE (20).pdf | 4 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate - Form 1.pdf | 8 Oct 2024 |
| Building plan approvalFile: IOA.pdf | 12 Aug 2024 |
| Layout approvalFile: Ammended IOA Plan FINAL 11-end.pdf | 12 Aug 2024 |
| Layout approvalFile: Ammended IOA Plan FINAL 10-10.pdf | 12 Aug 2024 |
| Layout approvalFile: Ammended IOA Plan FINAL 9-9.pdf | 12 Aug 2024 |
| Layout approvalFile: Ammended IOA Plan FINAL 8-8.pdf | 12 Aug 2024 |
| Layout approvalFile: Ammended IOA Plan FINAL 7-7.pdf | 12 Aug 2024 |
| Layout approvalFile: Ammended IOA Plan FINAL 6-6.pdf | 12 Aug 2024 |
| Layout approvalFile: Ammended IOA Plan FINAL 5-5.pdf | 12 Aug 2024 |
| Layout approvalFile: Ammended IOA Plan FINAL 4-4.pdf | 12 Aug 2024 |
| Layout approvalFile: Ammended IOA Plan FINAL 3-3.pdf | 12 Aug 2024 |
| Layout approvalFile: Ammended IOA Plan FINAL 2-2.pdf | 12 Aug 2024 |
| Layout approvalFile: Final plan.pdf | 12 Aug 2024 |
| Copy of Layout Approval (in case of layout)File: Ammended IOA Plan FINAL 5-5.pdf | 12 Aug 2024 |
| Copy of Layout Approval (in case of layout)File: Ammended IOA Plan FINAL 11-end.pdf | 12 Aug 2024 |
| Copy of Layout Approval (in case of layout)File: Ammended IOA Plan FINAL 10-10.pdf | 12 Aug 2024 |
| Copy of Layout Approval (in case of layout)File: Ammended IOA Plan FINAL 9-9.pdf | 12 Aug 2024 |
| Copy of Layout Approval (in case of layout)File: Ammended IOA Plan FINAL 8-8.pdf | 12 Aug 2024 |
| Copy of Layout Approval (in case of layout)File: Ammended IOA Plan FINAL 7-7.pdf | 12 Aug 2024 |
| Copy of Layout Approval (in case of layout)File: Ammended IOA Plan FINAL 6-6.pdf | 12 Aug 2024 |
| Copy of Layout Approval (in case of layout)File: Ammended IOA Plan FINAL 4-4.pdf | 12 Aug 2024 |
| Copy of Layout Approval (in case of layout)File: Ammended IOA Plan FINAL 3-3.pdf | 12 Aug 2024 |
| Copy of Layout Approval (in case of layout)File: Ammended IOA Plan FINAL 2-2.pdf | 12 Aug 2024 |
| Copy of Layout Approval (in case of layout)File: Final plan.pdf | 12 Aug 2024 |
| Proforma of Allotment letterFile: Mhatre Wadi-Allotment Letter.pdf | 12 Aug 2024 |
| Declaration in FORM BFile: Form B (2) (1).pdf | 12 Aug 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed Revised new CA Certificate dharti simran commercial_07-11-2024 (1)-Acknowledged (1) | 12 Aug 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: 1 Commencement Certificates _ NA Order for plotted development (8).pdf | 12 Aug 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: IOA.pdf | 12 Aug 2024 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: FORMAT A (11).pdf | 12 Aug 2024 |
| Deviation Report with respect to Allotment letterFile: DEVIATION REPORT ON ALLOTMENT (5).pdf | 12 Aug 2024 |
| Other - TechnicalFile: ANNEXURE A - COMMERCIAL.pdf | 12 Aug 2024 |
| Deviation Report with respect to model copy of AgreementFile: Deviation Report _1-13.pdf | 12 Aug 2024 |
| Proforma of Agreement for saleFile: agreement the next level.pdf | 12 Aug 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 18C ANNEXURE A.pdf | 12 Aug 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 18D ANNEXURE A.pdf | 12 Aug 2024 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B with landowner bank details (1).pdf | 12 Aug 2024 |
| Disclosure for secured/unsecured finance availed for the projectFile: DISCLOSURE OF SECURED (1).pdf | 12 Aug 2024 |
| PAN CardFile: 1 PAN Card (3).pdf | 10 Aug 2024 |
| Copy of the legal title reportFile: 1 Copy of the legal title report (5).pdf | 10 Aug 2024 |
| Details of encumbrances concerned to FinanceFile: No encumbrance self declaration (Commercial).pdf | 10 Aug 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - STRUCTURAL ENGINEER CERTIFICATE.pdf | 10 Aug 2024 |
| Declaration about Commencement CertificateFile: CC Declaration (commercial).pdf | 10 Aug 2024 |
| CERSAI detailsFile: CERSAI (4).pdf | 10 Aug 2024 |
| Details of encumbrances concerned to LegalFile: No encumbrance self declaration (Commercial).pdf | 10 Aug 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- All 69 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep THE NEXT LEVEL COMMERCIAL on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near BORIVALI6,700+ in Mumbai Suburban
Hiranandani Bluecrest
SHODEN DEVELOPERS PRIVATE LIMITED
KANAKIA PRIVAASA TOWER 1 & 2
KANAKIA TRANSPARENT DEVELOPERS PRIVATE LIM
BHOOMI AIRAVAT
Bhoomi Shashwat Estate Private limited
Shraddha Paradise
Shraddha Prime Projects Limited
UNIQUE REGALIA
UNIQUE SHANTI DEVELOPERS LLP
NICCO VANASHRI AND NICCO HEIGHTS
NEW INDIA CONSTRUCTION COMPANY
See every Mumbai Suburban project, with the district possession charts
Builder: DHARTI SIMRAN INFRASTRUCTURE LLP
DHARTI SIMRAN INFRASTRUCTURE LLP has 1 registration on MahaRERA, including THE NEXT LEVEL COMMERCIAL. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if THE NEXT LEVEL COMMERCIAL is delayed beyond 15 Dec 2030?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of THE NEXT LEVEL COMMERCIAL?
The registered promoter entity is DHARTI SIMRAN INFRASTRUCTURE LLP, a partnership as per the filing. Its GSTIN 27AAPFD3210Q1Z3 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in THE NEXT LEVEL COMMERCIAL?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against THE NEXT LEVEL COMMERCIAL?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for THE NEXT LEVEL COMMERCIAL?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at THE NEXT LEVEL COMMERCIAL?
The professionals named in the filing: Architect: JITENDRA B PATEL; Architect: Jitendra PATEL; Architect: MEHUL JITENDRA KANAKIA; Engineer: RUPESH RAMCHANDRA CHOWDHARY; Engineer: Rupesh Chowdhary; Engineer: UNISTEPS CONSULTING. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in THE NEXT LEVEL COMMERCIAL?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback