ReraGenieLog inGet a buyer report

Home / Browse projects / Raigarh, Maharashtra / The Landmark

Completed No litigation declared Others project

The Landmark

By Patel Builders And Developers

RG-MH-30696 · RERA P52000034760 · Last updated on MahaRERA portal: 20 Jan 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Oct 2025Possession promisedregistration recorded completed
22 of 22Construction stages doneacross 2 buildings; every applicable stage filed complete
0Complaints at MahaRERAon this registration
Jump to the 63 documents Report an error

The Landmark is a Others project by Patel Builders And Developers in Raigarh, Maharashtra, registered with MahaRERA as P52000034760 on 28 Apr 2022. The registration is recorded completed; possession was promised by 31 Oct 2025.

At a glance

Project

  • NameThe Landmark
  • TypeOthers
  • Location
    • Nizampur Road
    • Mangaon
    • Utekhol
    • Raigarh
    • 402104
  • Pincode402104
  • RERA no.P52000034760
  • ReraGenie IDRG-MH-30696

Builder

  • NamePatel Builders And Developers
  • Entity typePartnership
  • PartnersBilal Rauf Patel, Mannan Abdul Munam Hajimiya Patel, Sajid Abdul Majeed Patel
  • Other registrations1 more →
  • Completed1 of 2

Key dates

this monthRegisteredApr 2022PromisedOct 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on28 Apr 2022
  • Promised completion31 Oct 2025
  • Revised completionNone
  • Buildings2 building records
  • Documents filed63 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing BNA50000
A WingNA80000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 20 Jan 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

22 of 22 construction stages are filed complete across 2 buildings.

Wing B100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
A Wing100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 20 Jan 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Parking filed26

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots26
Closed/Covered26
BuildingClosed/CoveredTotal
Wing B1010
A Wing1616

Land and ownership4

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area5,690 sq m
Land owned byThe promoter, with other names on the file
Named landowners4
LandownerVillageDistrict
Shri Tejas Manohar GandhiMangaonRaigarh
Smt.Surekha Manohar GandhiMangaonRaigarh
Mrs.Reena Atish DhariaPune (M Corp.)Pune
Mrs.Shweta Mukesh ShethMangaonRaigarh

Approvals and building plan

Permissible FSI4387.44
Proposed, not sanctioned4,387 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPlot No 16 and 17/19, Sai Miracle, Kharghar, Sector 35E

Certifying professionals and partners

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

PartnerRole in project
Patel Builders And Developers-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Apr 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 24 Sep 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Sep 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Mar 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 18 Dec 2024

Documents filed63

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 The Landmark as on 31-12-2024.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - The Landmark as on 31-12-2024.pdf20 Jan 2025
Architect’s Certificate on Completion of Project (Form 4)File: VASTU CULTURE_11zon.pdf26 Dec 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Full OC The Landmark .pdf18 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - The Landmark as on Sept 2024.pdf13 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - The Landmark as on Sept 2024.pdf13 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - The Landmark as on Sept 2024.pdf13 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - The Landmark as on Sept 2024.pdf13 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 4 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - The Landmark as on June 2024.pdf19 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 The Landmark as on 30-06-2024.pdf19 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - The Landmark as on March 2024.pdf12 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 10 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf12 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - The Landmark as on March 2024.pdf12 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 10 CA Certificate on Project Cost Fund withdrawal (Form 3).pdf12 Apr 2024
Declaration about Commencement CertificateFile: Format D.pdf13 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf1 Mar 2024
Disclosure of sold/ booked inventoryFile: DocScanner 24-Feb-2024 5-52 pm.pdf26 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf17 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A (2022-23).pdf17 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_11zon (3).pdf17 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5_organized.pdf17 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - The Landmark as on Dec 2023.pdf17 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 The Landmark as on 31-12-2023 - Copy.pdf17 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - The Landmark as on Sep 2023.pdf17 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 The Landmark as on 30th September 2023.pdf14 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 - The Landmark as on 2022-23_compressed.pdf30 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- The Landmark as on June 2023.pdf14 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- The Landmark as on June 2023.pdf14 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- The Landmark.pdf11 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- The Landmark as on March 2023.pdf14 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 The Landmark as on March 2023.pdf14 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- The Landmark as on December 2022.pdf20 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 The Landmark as on December 2022.pdf20 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - The Landmark_compressed.pdf16 Nov 2022
Disclosure of sold/ booked inventoryFile: The Landmark- Circular 29.pdf16 Nov 2022
Disclosure of sold/ booked inventoryFile: The Landmark- Circular 29_compressed.pdf2 Nov 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: The Landmark Form 2 as on September 2022.pdf31 Oct 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 The Landmark as on Sept 2022.pdf31 Oct 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: The Landmark Form 2- March 2022.pdf8 Sep 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: The Landmark Form 2- June 2022.pdf8 Sep 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 The Landmark March 2022.pdf8 Sep 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 The Landmark June 2022.pdf8 Sep 2022
Copy of the legal title reportFile: Title Patel Builders.pdf27 Apr 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: patel Builders Form 3 -The LANDMARK.pdf5 Apr 2022
CERSAI detailsFile: CERSAI_Search_Report_200234048313_For_Asset_Based_Search_31_03_2022_12_00_22_185.pdf31 Mar 2022
Commencement Certificates / NA Order for plotted developmentFile: Page1.pdf30 Mar 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA Architect certificate The Landmark.pdf5 Oct 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Patel Builders -The Landmark .pdf5 Oct 2021
Layout approvalFile: page 1-converted (1).pdf24 Sep 2021
Building plan approvalFile: Page 2.pdf24 Sep 2021
Building plan approvalFile: Page 3.pdf24 Sep 2021
Building plan approvalFile: Page4.pdf24 Sep 2021
Copy of Layout Approval (in case of layout)File: page 1-converted (1).pdf24 Sep 2021
Building Plan Approval / NA Order for plotted developmentFile: Page 2.pdf24 Sep 2021
Building Plan Approval / NA Order for plotted developmentFile: Page 3.pdf24 Sep 2021
Building Plan Approval / NA Order for plotted developmentFile: Page4.pdf24 Sep 2021
PAN CardFile: Patel Builders pancard.pdf22 Sep 2021
Details of encumbrancesFile: The Landmark Encumbrance .pdf22 Sep 2021
Declaration about Commencement CertificateFile: CC Declatarion The Landmark .pdf22 Sep 2021
Declaration in FORM BFile: Form B The Landmark.pdf22 Sep 2021
Proforma of Allotment letterFile: Agreement For Sale_Patel Builders Developers.pdf22 Sep 2021
Proforma of Allotment letterFile: Allotment Letter_Patel Builders Developers.pdf22 Sep 2021

How this compares with Raigarh

20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is completed

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep The Landmark on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mangaon5,900+ in Raigarh

Builder: Patel Builders And Developers

Patel Builders And Developers has 2 registrations on MahaRERA, including The Landmark and Patel Heritage. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if The Landmark is delayed beyond 31 Oct 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of The Landmark?

The registered promoter entity is Patel Builders And Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in The Landmark?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for The Landmark?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

What should I check before booking in The Landmark?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About The Landmark. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save The Landmark to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.