ReraGenieLog inGet a buyer report

Home / Browse projects / Nashik, Maharashtra / The Landmark Apartment

Completed No litigation declared Residential / Group Housing project

The Landmark Apartment

By AD ENTERPRISES

RG-MH-58104 · RERA P51600052634 · Last updated on MahaRERA portal: 13 Nov 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
May 2028Possession promisedregistration recorded completed
9 of 11Construction stages donefurthest along: Podiums (if any), 0%
24 of 35Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 94 documents Report an error

The Landmark Apartment is a Residential / Group Housing project by AD ENTERPRISES in Nashik, Maharashtra, registered with MahaRERA as P51600052634 on 15 Sep 2023. The registration is recorded completed; possession was promised by 31 May 2028. 11 of the 35 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete.

At a glance

Project

  • NameThe Landmark Apartment
  • TypeResidential / Group Housing
  • Location
    • Bytco Factory road
    • Nashik road
    • Nashik
    • 422101
  • Pincode422101
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51600052634
  • ReraGenie IDRG-MH-58104

Builder

  • NameAD ENTERPRISES
  • Entity typePartnership
  • PartnersDhansukh Haribhai Patel, Arvind Haribhai Patel

Key dates

this monthRegisteredSep 2023PromisedMay 2028Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on15 Sep 2023
  • Promised completion31 May 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed94 files

Current status

31%11 of 35 units booked
100.0%Work done, per cost certificate

Figures as on 13 Nov 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
THE LANDMARK APARTMENTNA8835035

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 13 Nov 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

THE LANDMARK APARTMENT: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 13 Nov 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed69

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots69
Closed/Covered69

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,216 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on1 Oct 2024

Approvals and building plan

Permissible FSI4242.68
Proposed, not sanctioned4,243 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop no 2, Anand Commerce centre, Nashik road, Nashik
Estimated costRs 7.50 cr
Cost incurredRs 7.50 cr
Work done100.0%
BuildingWingEstimatedIncurred
THE LANDMARK APARTMENTNARs 7.50 crRs 7.50 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMr Subham Kulkarni
EngineerMr Kishor Chopda
Chartered AccountantMr Adarsh A Patel
Chartered AccountantYASH SUNIL SHAH
PartnerRole in project
AD ENTERPRISES-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 12 Jun 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 12 Jun 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 16 Dec 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 16 Dec 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed94

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 94 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Architech certificate AD Enter 30092025.pdf13 Nov 2025
Withdrawal Update Form 2File: Form 2 Engineer Certificate AD Enter 30092025.pdf13 Nov 2025
Withdrawal Update Form 3File: Form 3 AD Enterprises 30092025.pdf13 Nov 2025
Occupational CertificateFile: Cert_FO_556466_419cibWxSign.pdf13 Nov 2025
Form 5 (FY 2024-2025)File: Form 5 - AD Enterprises FY24-25 for Upload.pdf26 Sep 2025
Withdrawal Update Form 1File: Form 1 AD Enterprises 30062025.pdf2 Aug 2025
Withdrawal Update Form 2File: Form 2 AD Enterprises 30062025.pdf2 Aug 2025
Withdrawal Update Form 3File: Form 3 AD Enterprises 30062025.pdf2 Aug 2025
Form 1File: Form 1 Landmark 30092023.pdf25 Jun 2025
Form 2File: Form 2 Landmark 30092023.pdf25 Jun 2025
Form 3File: Form 3 Landmark 30092023.pdf25 Jun 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Disclosure Landmark 30092023.pdf25 Jun 2025
Form 1File: Form 1 AD Enterprises 31122023.pdf25 Jun 2025
Form 2File: Form 2 AD Enterprise 31122023.pdf25 Jun 2025
Form 3File: Form 3 AD Enterprises 31122023.pdf25 Jun 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory Details 31122023.pdf25 Jun 2025
Form 1File: Form 1 Architect certificate AD Enterprises 31032024.pdf25 Jun 2025
Form 2File: Form 2 Engineer Certificate AD Enterprise 31032024.pdf25 Jun 2025
Form 3File: Form 3 CA Certificate AD Enterprises 31032024.pdf25 Jun 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Disclosure 31032024.pdf25 Jun 2025
Form 1File: Form 1 AD Enterprises 30062024.pdf25 Jun 2025
Form 2File: Form 2 AD Enterprises 30062024.pdf25 Jun 2025
Form 3File: Form 3 AD ENTERPRISES 30062024.pdf25 Jun 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory Declaration 30062024.pdf25 Jun 2025
Form 1File: Form 1 ADEnterprises 30092024.pdf25 Jun 2025
Form 2File: Form 2 ADEnterprises 30092024.pdf25 Jun 2025
Form 3File: Form 3 ADEnterprises 30092024.pdf25 Jun 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Declaration 30092024.pdf25 Jun 2025
Form 1File: Form 1 AD Enterprises Architect Certificate 31122024.pdf25 Jun 2025
Form 2File: Form 2 AD Enterprises Engineer Certificate 31122024.pdf25 Jun 2025
Form 3File: Form 3 AD Enterprises CA Certificate 31122024.pdf25 Jun 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Declaration AD Enterprises 31122024.pdf25 Jun 2025
Form 1File: Form 1 AD Enterprises 31032025.pdf25 Jun 2025
Form 2File: Form 2 AD Enterprises 31032025.pdf25 Jun 2025
Form 3File: Form 3 AD Enterprises 31032025.pdf25 Jun 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Declaration AD Enterprises.pdf25 Jun 2025
Form 5 (FY 2023-2024)File: AD Enterprises Form 5 Yash S Shah Associates.pdf25 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 AD Enterprises 31032025.pdf2 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 AD Enterprises 31032025.pdf2 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 AD Enterprises 31032025.pdf2 May 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Declaration AD Enterprises.pdf2 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 AD Enterprises Architect Certificate 31122024.pdf22 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 AD Enterprises CA Certificate 31122024.pdf22 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 AD Enterprises Engineer Certificate 31122024.pdf22 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Declaration AD Enterprises 31122024.pdf22 Jan 2025
Building plan approvalFile: Revised Building Plan.pdf16 Dec 2024
Commencement Certificates / NA Order for plotted developmentFile: Revised Commencement Certificate.pdf16 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: Revised Building Plan.pdf16 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 ADEnterprises 30092024.pdf24 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 ADEnterprises 30092024.pdf24 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 ADEnterprises 30092024.pdf24 Oct 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Declaration 30092024.pdf24 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2 RERA ARCHITECT FORM.pdf9 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3 ENGINEER CERTIFICATE.pdf9 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 AD ENTERPRISES.pdf9 Aug 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: AD Enterprises Form 5 Yash S Shah Associates.pdf10 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3 Form 1 - Architect certificate AD Enterprises 31032024.pdf22 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate AD Enterprise 31032024.pdf22 Apr 2024
Disclosure of sold/ booked inventoryFile: 3 AD Enterprises Sold Unsold Inventory Declaration 31032024.pdf22 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate AD Enterprises 31032024.pdf22 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2 FORM 1 Architect Certificate Dec 23 Q3.pdf5 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 AD Enterprise 31122023.pdf5 Jan 2024
Disclosure of sold/ booked inventoryFile: 2 AD Enterprises Sold Unsold Inventory Declaration 31122023 .pdf5 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - AD Enterprises 31122023.pdf5 Jan 2024
Disclosure of sold/ booked inventoryFile: AD Enterprises Sold Unsold Inventory Declaration 30092023.pdf18 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Adobe Scan 10 Oct 2023.pdf15 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: final RERA AD AJITBHAI.pdf15 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ADARSH A PATEL CO.pdf15 Oct 2023
Other - TechnicalFile: Email from NMC to RERA dated 24082023.pdf6 Sep 2023
Proforma of Allotment letterFile: Model Form Allotment Letter - Revised.pdf8 Jul 2023
Details of encumbrances concerned to FinanceFile: 1 Details of encumbrances concerned to Finance.pdf23 Jun 2023
Details of encumbrances concerned to FinanceFile: 2 Details of encumbrances concerned to Legal.pdf23 Jun 2023
Details of encumbrances concerned to LegalFile: 1 Details of encumbrances concerned to Finance.pdf23 Jun 2023
Details of encumbrances concerned to LegalFile: 2 Details of encumbrances concerned to Legal.pdf23 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architects Certificate.pdf23 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate.pdf23 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Adarsh A Patel (1).pdf23 Jun 2023
Proforma of Agreement for saleFile: Rera Model Agreement For Sale - AD Enterprises.pdf23 Jun 2023
Deviation Report with respect to Allotment letterFile: 9 Deviation report with respect to model copy of Allotment letter new.pdf23 Jun 2023
Deviation Report with respect to model copy of AgreementFile: 10 Deviation Report with respect to model copy of Agreement new.pdf23 Jun 2023

How this compares with Nashik

31%of this project is bookeddistrict median 17%
10%of Nashik projects moved their completion datethis one has not
19%of Nashik registrations have lapsed or been cancelledthis one is completed

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep The Landmark Apartment on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Nashik road4,100+ in Nashik

2 kmThe Landmark ApartmentCompleted 38Lapsed / revoked 7Other 35Dot size: filed unitsN

Filed coordinates, straight-line distance. 80 registered projects within 2 km.

Builder: AD ENTERPRISES

AD ENTERPRISES has 1 registration on MahaRERA, including The Landmark Apartment. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What are my rights if The Landmark Apartment is delayed beyond 31 May 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of The Landmark Apartment?

The registered promoter entity is AD ENTERPRISES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in The Landmark Apartment?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for The Landmark Apartment?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at The Landmark Apartment?

The professionals named in the filing: Architect: Mr Subham Kulkarni; Engineer: Mr Kishor Chopda; Chartered Accountant: Mr Adarsh A Patel; Chartered Accountant: YASH SUNIL SHAH. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in The Landmark Apartment?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About The Landmark Apartment. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save The Landmark Apartment to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.