Home / Browse projects / Mumbai City, Maharashtra / The IVY

Registered No litigation declared Others project

The IVY

By Baysquare Constructions

RG-MH-50099 · RERA P51900049038 · Last updated on MahaRERA portal: 26 May 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 13 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai City registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 13 months from the original
5 of 11Construction stages donefurthest along: Internal walls, 60%
35 of 36Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 147 documents Report an error

The IVY is a Others project by Baysquare Constructions in Mumbai City, Maharashtra, registered with MahaRERA as P51900049038 on 30 Jan 2023. Possession is promised by 31 Dec 2026. The completion date has moved by 13 months from the original filing. 1 of the 36 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NameThe IVY
  • TypeOthers
  • Location
    • Shanmukhananda Hall Road No 22
    • Near Gandhi Market
    • Sion(E)
    • Mumbai City
    • 400022
  • Pincode400022
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900049038
  • ReraGenie IDRG-MH-50099

Builder

  • NameBaysquare Constructions
  • Entity typePartnership
  • PartnersMohammed Hanif Momin, Naseem Mohammed Hanif Momin

Key dates

this monthRegisteredJan 2023First promiseNov 2025Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on30 Jan 2023
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 30 Nov 2025)
  • Buildings1 building record
  • Documents filed147 files

Current status

3%1 of 36 units booked
32.4%Work done, per cost certificate

Figures as on 26 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
The IVYNA171631536

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 26 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 60%.

The IVY: 53% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure17%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%

Progress on shared amenities15

As on 26 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed44

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots44
Closed/Covered44

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area733 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on30 Jul 2025
LandownerVillageDistrict
Shri Navin Karamshi MotaMumbai CityMumbai City
Jasuben Navin MotaMumbai CityMumbai City

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI2434.01
Proposed, not sanctioned2,434 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop No 1 and 2, Ayesha Tower, Jogeshwari West, Mumbai 400102
Estimated costRs 23.45 cr
Cost incurredRs 7.60 cr
Work done32.42%
BuildingWingEstimatedIncurred
The IVYNARs 19.58 crRs 7.60 cr
-NARs 3.87 cr-

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAr Amod Mandlik
EngineerPragnesh Oza Pragnesh Oza
EngineerMahendra Mane
Chartered AccountantCA Paresh Sabadra SABADRA
Chartered AccountantPratik D Jain
Chartered AccountantSuchita Rakesh Pawar
PartnerRole in project
Baysquare Constructions-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA01102517996Nov 2025 → Dec 2026

Reason as filed by the promotera) As the entire country including Mumbai Suburban were under a total lock-down; and the Government of India as well as the Government of Maharashtra had announced a slew of measures including “work from home” and “social distancing” to curb the spread of the COVID-19. In view of the curbs and measures imposed by the Governments, I stopped work till such time as the said lockdowns, curbs and measures were relaxed by the respective Governments. b) As the entire country including Mumbai Suburban were under a total lock-down; and the Government of India as well as the Government of Maharashtra ha

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 12 Dec 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 12 Dec 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 12 Dec 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 Dec 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed147

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 147 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: ARMarch-26..pdf26 May 2026
Withdrawal Update Form 2File: ER March-26..pdf26 May 2026
Withdrawal Update Form 3File: CA March-26..pdf26 May 2026
Form 2A (FY 2025-2026)File: Form 2A March 2026 - SIGNED.pdf16 Apr 2026
Withdrawal Update Form 1File: Architect Certificae - Dec 25 - Signed.pdf31 Jan 2026
Withdrawal Update Form 2File: Engineer Certificate - Dec 25 - Signed.pdf31 Jan 2026
Withdrawal Update Form 3File: CA - Dec 25 - Final.pdf31 Jan 2026
Withdrawal Update Form 1File: Architect Certificate - The Ivy - July - Sept 25 - Signed.pdf20 Dec 2025
Withdrawal Update Form 2File: Engineer Certificate - Q2 - June 25 to Sept 25 - Signed.pdf20 Dec 2025
Withdrawal Update Form 3File: Bay Square CA Cert Sept 25 - Signed-Final.pdf20 Dec 2025
Form 5 (FY 2024-2025)File: RERA Audit report - 2024-25 final.pdf15 Dec 2025
Form 2A (FY 2024-2025)File: Form 2A - March 25.pdf4 Dec 2025
Form 2A (FY 2022-2023)File: Form 2A - March 23.pdf4 Dec 2025
Form 2A (FY 2023-2024)File: Form 2A - March 24.pdf4 Dec 2025
Form 5 (FY 2022-2023)File: RERA Audit.pdf12 Nov 2025
Form 1File: Architect June 23.pdf29 Sep 2025
Form 2File: Engineer Certificate - Jun 23.pdf29 Sep 2025
Form 3File: CA Certificate June 23.pdf29 Sep 2025
Disclosure of Sold and Booked InventoryFile: Disclosure June 23.pdf29 Sep 2025
Form 1File: Architect Certificate sept 23.pdf29 Sep 2025
Form 2File: Engineer sept 23.pdf29 Sep 2025
Form 3File: Bay Square CA Certificate sept 23.pdf29 Sep 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Sept 23.pdf29 Sep 2025
Form 1File: Architect Dec 23.pdf29 Sep 2025
Form 2File: Engineer Dec 23.pdf29 Sep 2025
Form 3File: CA Certificate Dec 23.pdf29 Sep 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Dec 23.pdf29 Sep 2025
Withdrawal Update Form 1File: AR - June 25.pdf29 Sep 2025
Withdrawal Update Form 2File: ER - June 25.pdf29 Sep 2025
Withdrawal Update Form 3File: CA -June 25 sign.pdf29 Sep 2025
Form 1File: Architect Certificate Q3 - Dec 24 - Signed.pdf27 Sep 2025
Form 2File: Engineer Certificate - Q3 Oct 24 to Dec 24 - Signed.pdf27 Sep 2025
Form 3File: Bay Square CA Certificate- Dec 2024 - Signed (4).pdf27 Sep 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory Pg 1 - As of 31-12-2024 - Signed.pdf27 Sep 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory - As of 30-09-2024 - Signed.pdf27 Sep 2025
Form 1File: Architect Certificate Q2 - Sept 24 - Signed.pdf27 Sep 2025
Form 2File: Engineer Certificate Q2 - Sept 24 - Signed.pdf27 Sep 2025
Form 3File: Bay Square CA Certificate- sept 24 - Signed (1).pdf27 Sep 2025
Form 1File: Architect Certificate FORM 1 - Q1 ( April to June 24) - Signed.pdf27 Sep 2025
Form 2File: Engineer Certificate Q1 Jun 24 - Signed.pdf27 Sep 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory - 30-06-2024 - Signed.pdf27 Sep 2025
Form 3File: CA Cert_June 24-Signed Final signed.pdf27 Sep 2025
Form 1File: 1 - AR Cert Mar 2024 Final Baysq.pdf27 Sep 2025
Form 2File: 2 - ER Cert Mar 2024 Final Baysq.pdf27 Sep 2025
Form 3File: 3 CA Cert Mar 2024 Baysq final.pdf27 Sep 2025
Disclosure of Sold and Booked InventoryFile: Disclosure.pdf27 Sep 2025
Form 5 (FY 2023-2024)File: Final RA.pdf27 Sep 2025
Form 1File: Form 1 - Architect Certificate - Jan 2025 to Mar 2025 - Signed.pdf19 Jul 2025
Form 2File: Engineer Certificate - Q4 - Jan 25 to Mar 25 - Signed.pdf19 Jul 2025
Form 3File: CA Cert (1).pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory - As of 01-04-25.pdf19 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Q3 - Dec 24 - Signed.pdf22 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Bay Square CA Certificate- Dec 2024 - Signed (4).pdf22 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate - Q3 Oct 24 to Dec 24 - Signed.pdf22 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Final RA.pdf11 Feb 2025
Disclosure of sold/ booked inventoryFile: Disclousre.pdf5 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Bay Square CA Certificate- sept 24 - Signed (1).pdf1 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory - As of 30-09-2024 - Signed.pdf30 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Q2 - Sept 24 - Signed.pdf27 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Bay Square CA Certificate- sept 24 - Signed.pdf27 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Q2 - Sept 24 - Signed.pdf27 Dec 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory - As of 30-09-2024 - Signed.pdf28 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate FORM 1 - Q1 ( April to June 24) - Signed.pdf18 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cert_June 24-Signed Final signed.pdf18 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Q1 Jun 24 - Signed.pdf18 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate FORM 1 - Q1 ( April to June 24) - Signed.pdf14 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cert_June 24-Signed.pdf14 Oct 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory - 30-06-2024 - Signed.pdf14 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Engineer Certificate - Q1 - Apr 24-Jun 24 - Signed.pdf14 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 - AR Cert Mar 2024 Final Baysq.pdf31 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 - ER Cert Mar 2024 Final Baysq.pdf31 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 CA Cert Mar 2024 Baysq final.pdf31 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2 A.pdf2 May 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory - As of 31-03-2024 -Signed.pdf2 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect RERA Certificate Oct 23 - Dec 23 - CORRECTED - Signed (1).pdf3 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate - IVY-010224 - Signed.pdf3 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Dec -23 - Signed FINAL REPORT.pdf3 Feb 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory - As of 31-12-2023 - Signed.pdf18 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf15 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Q2.pdf15 Dec 2023

How this compares with Mumbai City

3%of this project is bookeddistrict median 17%
33%of Mumbai City projects moved their completion datethis one moved by 13 months
25%of Mumbai City registrations have lapsed or been cancelledthis one is on the register

Computed across the 780+ Mumbai City projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep The IVY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Near Gandhi Market, Sion(E)780+ in Mumbai City

2 kmThe IVYCompleted 72Lapsed / revoked 43Other 60Dot size: filed unitsN

Filed coordinates, straight-line distance. 175 registered projects within 2 km.

Builder: Baysquare Constructions

Baysquare Constructions has 1 registration on MahaRERA, including The IVY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai City district page.

Frequently asked questions

What are my rights if The IVY is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of The IVY?

The registered promoter entity is Baysquare Constructions, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in The IVY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for The IVY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at The IVY?

The professionals named in the filing: Architect: Ar Amod Mandlik; Engineer: Pragnesh Oza Pragnesh Oza; Engineer: Mahendra Mane; Chartered Accountant: CA Paresh Sabadra SABADRA; Chartered Accountant: Pratik D Jain; Chartered Accountant: Suchita Rakesh Pawar. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in The IVY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About The IVY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save The IVY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.