ReraGenieLog inGet a buyer report

Home / Browse projects / Raigarh, Maharashtra / THE GREENS

Registered No litigation declared Others project

THE GREENS

By SAI SHRADHA DEVELOPER

RG-MH-88002 · RERA P52000047594 · Last updated on MahaRERA portal: 28 May 2026

Source: official MahaRERA filing

Red flags

  • Rs 18.00 crore secured on the land, in favour of DCB Bank
  • The declared charge does not appear in the CERSAI report on the filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Oct 2028Possession promisedno revision filed
1 of 44Construction stages doneacross 4 buildings; furthest along: Slabs of Super Structure, 95%
0Complaints at MahaRERAon this registration
Jump to the 86 documents Report an error

THE GREENS is a Others project by SAI SHRADHA DEVELOPER in Raigarh, Maharashtra, registered with MahaRERA as P52000047594 on 14 Nov 2022. Possession is promised by 30 Oct 2028.

At a glance

Project

  • NameTHE GREENS
  • TypeOthers
  • Location
    • SURVEY 99/3
    • 99/4
    • PISARVE
    • Panvel
    • Raigarh
    • 410208
  • Pincode410208
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000047594
  • ReraGenie IDRG-MH-88002

Builder

  • NameSAI SHRADHA DEVELOPER
  • Entity typePartnership
  • GSTIN27ADVFS6699H1ZW
  • PartnersANKUSH PANDURANG CHOUDHARY, VINOD BHIM MHATRE, Vivek Arun Keni
  • Other registrations4 more →
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects3 →

Key dates

this monthRegisteredNov 2022PromisedOct 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on14 Nov 2022
  • Promised completion30 Oct 2028
  • Revised completionNone
  • Buildings4 building records
  • Documents filed86 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ASTERNA1515000
AZALEANA160000
IRISNA150000
ORCHIDNA10000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 28 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Slabs of Super Structure, at 95%.

ASTER44%
ActivityProgress
Excavation100%
Basement (if any)70%
Podiums (if any)0%
Plinth70%
Stilt Floor50%
Slabs of Super Structure95%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises15%
Sanitary Fittings within the flats / premises40%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks40%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
AZALEA0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
IRIS0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
ORCHID0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 28 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed487

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots487
Closed/Covered167
Open Space320
BuildingClosed/CoveredOpen SpaceTotal
ASTER16680246
AZALEA18081
IRIS08080
ORCHID08080

Land and ownership1

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area9,940 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared present
Charge in favour ofDCB Bank
Secured amountRs 18.00 crore
CERSAI search filedYes
Declared on30 May 2026
LandownerVillageDistrict
DHONDU BHURAJI KENIPethaliRaigarh

Approvals and building plan

Sanctioning authorityPanvel Municipal Corporation
Permissible FSI16957.63
Proposed, not sanctioned16,958 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchUnit No 7 8 Neel Udhyan Sanjay Co Op Hsg Society Plot No 19 Sector No 3e Kalamboli Navi Mumbai 410218

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectA.A.M Designs
EngineerSK Consultants & Engineers
EngineerS K Consultants & Engineers
Chartered AccountantCA PRANAV BHASKARAN & ASSOCIATES
PartnerRole in project
SAI SHRADHA DEVELOPER-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 20 Oct 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 May 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 May 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 27 May 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Oct 2028

Documents filed86

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 86 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1 of The Greens as on 31-03-2026 - Copy.pdf28 May 2026
Form 2File: Form 2 - The Greens as on March 2026.pdf28 May 2026
Form 3File: Form 3 - The Greens as on March 2026.pdf28 May 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 - The Greens as on March 2026.pdf28 May 2026
Form 1File: Form 1 - The Greens as on Sep 2025.pdf7 Mar 2026
Form 2File: Form 2 - The Greens as on Sept 2025.pdf7 Mar 2026
Form 3File: Form 3 - The Greens as on Sep 2025.pdf7 Mar 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 - The Greens as on Sep 2025.pdf7 Mar 2026
Form 1File: Form 1 - The Greens as on Dec 2025.pdf7 Mar 2026
Form 2File: Form 2 - The Greens as on Dec 2025.pdf7 Mar 2026
Form 3File: Form 3 - The Greens as on Dec 2025.pdf7 Mar 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 - The Greens as on Dec 2025.pdf7 Mar 2026
Form 1File: Form 1 - The Greens as on June 2025.pdf31 Jul 2025
Form 2File: Form 2 - The Greens as on June 2025.pdf31 Jul 2025
Form 3File: Form 3 - The Greens as on June 2025.pdf31 Jul 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 - The Greens as on June 2025.pdf31 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - The Greens as on Dec 2024.pdf18 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - The Greens as on Dec 2024.pdf18 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 of The Greens as on 30-09-2024.pdf26 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- The Greens- as on Sept 2024.pdf26 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf11 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_11zon.pdf11 Oct 2024
Disclosure of sold/ booked inventoryFile: Circular 29 (3).pdf11 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - The Greens for FY 23-24.pdf11 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - The Greens for FY 23-24_11zon.pdf11 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - The Greens as on June 2024.pdf18 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2_11zon.pdf18 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - The Greens as on June 2024.pdf18 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: new form 3_11zon.pdf18 Jul 2024
Declaration about Commencement CertificateFile: FORMAT D DECLARATION FOR CC.pdf3 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: THE GREENS - Form 1.pdf3 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM1_11zon.pdf3 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2_11zon.pdf3 Jul 2024
Disclosure of sold/ booked inventoryFile: INVENTORY SOLD UNSOLD.pdf3 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: new form 3_11zon.pdf3 Jul 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM5_11zon.pdf3 Jul 2024
Layout approvalFile: 1.pdf27 May 2024
Building plan approvalFile: 2.pdf27 May 2024
Building plan approvalFile: 3.pdf27 May 2024
Building plan approvalFile: 4.pdf27 May 2024
Building plan approvalFile: 5.pdf27 May 2024
Building plan approvalFile: 6.pdf27 May 2024
Building plan approvalFile: 7.pdf27 May 2024
Building plan approvalFile: 8.pdf27 May 2024
Building plan approvalFile: 9.pdf27 May 2024
Building plan approvalFile: 10.pdf27 May 2024
Building plan approvalFile: 11.pdf27 May 2024
Copy of Layout Approval (in case of layout)File: 1.pdf27 May 2024
Building Plan Approval / NA Order for plotted developmentFile: 2.pdf27 May 2024
Building Plan Approval / NA Order for plotted developmentFile: 3.pdf27 May 2024
Building Plan Approval / NA Order for plotted developmentFile: 4.pdf27 May 2024
Building Plan Approval / NA Order for plotted developmentFile: 5.pdf27 May 2024
Building Plan Approval / NA Order for plotted developmentFile: 6.pdf27 May 2024
Building Plan Approval / NA Order for plotted developmentFile: 7.pdf27 May 2024
Building Plan Approval / NA Order for plotted developmentFile: 8.pdf27 May 2024
Building Plan Approval / NA Order for plotted developmentFile: 9.pdf27 May 2024
Building Plan Approval / NA Order for plotted developmentFile: 10.pdf27 May 2024
Building Plan Approval / NA Order for plotted developmentFile: 11.pdf27 May 2024
Commencement Certificates / NA Order for plotted developmentFile: CC - The Greens.pdf27 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: the greens 2022 From 2A.pdf1 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: the greens 2023 From 2A.pdf1 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: AUDIT REPORT AY 23-24 2.pdf6 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE -SAI SHRADHA DEVELOPERS.pdf2 Nov 2022
Deviation Report with respect to model copy of AgreementFile: MODEL OF AGREEMNT OF DETIVIATION.pdf28 Oct 2022
Proforma of Agreement for saleFile: DRAFT AGREEMNT FOR SALES.pdf27 Oct 2022
Layout approvalFile: LAYOUT APPROVAL 1.pdf20 Oct 2022
Layout approvalFile: LAYOUT APPROVAL 2.pdf20 Oct 2022
Layout approvalFile: LAYOUT APPROVAL 3.pdf20 Oct 2022
Copy of the legal title reportFile: TITLE AND SERACH REPROT.pdf20 Oct 2022
Copy of Layout Approval (in case of layout)File: LAYOUT APPROVAL 1.pdf20 Oct 2022
Copy of Layout Approval (in case of layout)File: LAYOUT APPROVAL 2.pdf20 Oct 2022
Copy of Layout Approval (in case of layout)File: LAYOUT APPROVAL 3.pdf20 Oct 2022
Declaration in FORM BFile: FORM B DEVELOPERS.pdf20 Oct 2022
Deviation Report with respect to Allotment letterFile: devitaion reports allotment.pdf20 Oct 2022
Building plan approvalFile: BLUE PRINT.pdf10 Oct 2022
PAN CardFile: company pan card.pdf10 Oct 2022
Details of encumbrances concerned to FinanceFile: 1 a Details of encumbrances concerned to Finance.pdf10 Oct 2022
Details of encumbrances concerned to LegalFile: 1 b Details of encumbrances concerned to Legal.pdf10 Oct 2022
Building Plan Approval / NA Order for plotted developmentFile: BLUE PRINT.pdf10 Oct 2022
Commencement Certificates / NA Order for plotted developmentFile: CC-1-3.pdf10 Oct 2022

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 not delivered by the promised date
ProjectLocationRegisteredStatusPromisedDelivered
THE GREEN CRESTP52000021830TALOJA, RaigarhJul 2019OngoingMar 2025Registered original: Mar 2024Not delivered

How this compares with Raigarh

20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep THE GREENS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PISARVE5,900+ in Raigarh

2 kmTHE GREENSCompleted 50Lapsed / revoked 33Other 92Dot size: filed unitsN

Filed coordinates, straight-line distance. 175 registered projects within 2 km.

Builder: SAI SHRADHA DEVELOPER

SAI SHRADHA DEVELOPER has 5 registrations on MahaRERA, including THE GREEN CREST and THE GREENS. Its filings disclose 3 earlier MahaRERA projects, none completed yet. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if THE GREENS is delayed beyond 30 Oct 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of THE GREENS?

The registered promoter entity is SAI SHRADHA DEVELOPER, a partnership as per the filing. Its GSTIN 27ADVFS6699H1ZW can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in THE GREENS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for THE GREENS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at THE GREENS?

The professionals named in the filing: Architect: A.A.M Designs; Engineer: SK Consultants & Engineers; Engineer: S K Consultants & Engineers; Chartered Accountant: CA PRANAV BHASKARAN & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in THE GREENS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About THE GREENS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save THE GREENS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.