Home / Browse projects / Kolhapur, Maharashtra / THE ENCLAVE

Registered No litigation declared Residential / Group Housing project

THE ENCLAVE

By IDEAL REALTY

RG-MH-94580 · RERA P53000055648 · Last updated on MahaRERA portal: 14 Jul 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Kolhapur registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
2 of 11Construction stages donefurthest along: Basement (if any), 70%
20 of 34Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 71 documents Report an error

THE ENCLAVE is a Residential / Group Housing project by IDEAL REALTY in Kolhapur, Maharashtra, registered with MahaRERA as P53000055648 on 5 Apr 2024. Possession is promised by 31 Dec 2027. 14 of the 34 units on this registration are recorded sold or booked, and 2 of 11 construction stages are filed complete.

At a glance

Project

  • NameTHE ENCLAVE
  • TypeResidential / Group Housing
  • Location
    • NEAR ST XAVIOR HIGHSCHOOL
    • NAGALA PARK
    • Kolhapur (M Corp.)
    • Karvir
    • Kolhapur
    • 416003
  • Pincode416003
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P53000055648
  • ReraGenie IDRG-MH-94580

Builder

  • NameIDEAL REALTY
  • Entity typePartnership
  • PartnersAMAR CHANDRAKANT DHAMANE, ATUL DATTATRAY POWAR

Key dates

this monthRegisteredApr 2024PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on5 Apr 2024
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed71 files

Current status

41%14 of 34 units booked
41.3%Work done, per cost certificate

Figures as on 14 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
THE ENCLAVENA9734034

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 14 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 70%.

THE ENCLAVE: 45% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)70%
Podiums (if any)0%
Plinth0%
Stilt Floor70%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks60%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 14 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed64

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots64
Closed/Covered64

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,016 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
ELECTRICITY BOARD ENGINEERS FLAT TYPE CO OP HSG SOKolhapur (M Corp.)Kolhapur

Approvals and building plan

Sanctioning authorityKolhapur Municipal Corporation
Permissible FSI4000.0
Proposed, not sanctioned3,088 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchTARABAI PARK , KOLHAPUR
Estimated costRs 8.80 cr
Cost incurredRs 3.64 cr
Work done41.34%
BuildingWingEstimatedIncurred
THE ENCLAVENARs 8.00 crRs 3.49 cr
-NARs 80.00 lakhRs 14.84 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVISION ASSOCIATES
EngineerVARUN UDYA KADAM
Chartered AccountantSHANKAR PATIL & ASSOCIATES
Chartered AccountantAmit Madanrao Shinde
PartnerRole in project
IDEAL REALTY-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 Feb 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 17 Jun 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 17 Jun 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 Jan 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed71

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Architect Certificate 1-4-2026 to 30-6-2026.pdf14 Jul 2026
Withdrawal Update Form 2File: Engineer Certificate 13-7-2026.pdf14 Jul 2026
Withdrawal Update Form 3File: CA certificate july26.pdf14 Jul 2026
Withdrawal Update Form 1File: Architect Certificate 07-04-26.pdf8 Apr 2026
Withdrawal Update Form 2File: ENG CERTIFICATE APR 26.pdf8 Apr 2026
Withdrawal Update Form 3File: Form_3_Ideal_Realty_apr 26.pdf8 Apr 2026
Form 5 (FY 2024-2025)File: Form 5 With Annexure A sign Ideal Realty.pdf4 Mar 2026
Withdrawal Update Form 1File: ar certificate sep 2025 ir.pdf16 Jan 2026
Withdrawal Update Form 2File: Ar certificate IR Dec 25.pdf16 Jan 2026
Withdrawal Update Form 3File: Form 3 Ideal Realty Withdrawal Application Form3 (3).pdf16 Jan 2026
Withdrawal Update Form 1File: ar certificate sep 2025 ir.pdf13 Oct 2025
Withdrawal Update Form 2File: Eng Certificate Sep 25 IR.pdf13 Oct 2025
Withdrawal Update Form 3File: CA certificate Sep 25 IR.pdf13 Oct 2025
Withdrawal Update Form 1File: Architect Certificate June.pdf11 Oct 2025
Withdrawal Update Form 2File: eng certificate june 2024.pdf11 Oct 2025
Withdrawal Update Form 3File: ca certificate june 24_compressed.pdf11 Oct 2025
Withdrawal Update Form 1File: Architect Certificate June.pdf9 Oct 2025
Withdrawal Update Form 2File: eng certificate june 2024.pdf9 Oct 2025
Withdrawal Update Form 3File: ca certificate june 24_compressed.pdf9 Oct 2025
Declaration and undertaking (Annexure A)File: Ar certificate june 25 ideal.pdf11 Jul 2025
Form 2A (FY 2024-2025)File: Form 2A.pdf11 Jul 2025
Building plan approvalFile: New Sanction Plan TE.pdf17 Jun 2025
Layout approvalFile: Revised CC The Enclave.pdf17 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Cert March 25.pdf11 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cert March 25.pdf11 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Cert March 25.pdf11 Apr 2025
Building plan approvalFile: Revised Sanction Plan.pdf23 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: Revised Commencement Certificate.pdf23 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: Revised Sanction Plan.pdf23 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Dec 24.pdf9 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ca certificate ideal dec 24.pdf9 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Certificate Ideal realty.pdf9 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: eng certificate Sep 2024.pdf10 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate sep 24_compressed.pdf10 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECHT CERTIFICATE Oct.pdf10 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECHT CERTIFICATE Oct.pdf10 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate sep 24_compressed.pdf10 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: eng certificate Sep 2024.pdf10 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate June.pdf15 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: eng certificate june 2024.pdf15 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ca certificate june 24_compressed.pdf15 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate.pdf11 Mar 2024
Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMENT CERTIFICATE.pdf21 Feb 2024
Other - TechnicalFile: DECLARATION CUM UNDERTAKING.pdf21 Feb 2024
Copy of the legal title reportFile: Legal Title Search Report_compressed.pdf17 Feb 2024
Copy of the legal title reportFile: FORMAT A.pdf17 Feb 2024
Proforma of Agreement for saleFile: Agreement to Sale Draft.pdf17 Feb 2024
Deviation Report with respect to model copy of AgreementFile: No Deviation Agreement to sale.pdf17 Feb 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration about bank account.pdf15 Feb 2024
Layout approvalFile: CS NAKASHA.pdf8 Feb 2024
Building plan approvalFile: Sanction Plan 2-3.pdf8 Feb 2024
Building plan approvalFile: Sanction Plan 3-3.pdf8 Feb 2024
Building plan approvalFile: Sanction Plan 1-3.pdf8 Feb 2024
Copy of Layout Approval (in case of layout)File: CS NAKASHA.pdf8 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: Sanction Plan 2-3.pdf8 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: Sanction Plan 3-3.pdf8 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: Sanction Plan 1-3.pdf8 Feb 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement CERTIFICATE.pdf8 Feb 2024
Proforma of Allotment letterFile: Allotment Letter.pdf8 Feb 2024
Deviation Report with respect to Allotment letterFile: No Deviation Alloment Letter.pdf8 Feb 2024
PAN CardFile: IDEAL REALTY PAN CARD.pdf31 Jan 2024
Details of encumbrances concerned to FinanceFile: Declaration Regarding Finance Encumbrance.pdf31 Jan 2024
Details of encumbrances concerned to FinanceFile: Declaration Regarding Legal Encumbrance.pdf31 Jan 2024
Details of encumbrances concerned to LegalFile: Declaration Regarding Finance Encumbrance.pdf31 Jan 2024
Details of encumbrances concerned to LegalFile: Declaration Regarding Legal Encumbrance.pdf31 Jan 2024
Declaration in FORM BFile: Form B Affidavit.pdf31 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECH CERTIFICATE.pdf31 Jan 2024
CERSAI detailsFile: CERSAI Report (1).pdf31 Jan 2024
CERSAI detailsFile: CERSAI Declaration.pdf31 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest Organizations - AAP AD.pdf31 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest Organizations - AAP AP.pdf31 Jan 2024

How this compares with Kolhapur

41%of this project is bookeddistrict median 19%
17%of Kolhapur projects moved their completion datethis one has not
25%of Kolhapur registrations have lapsed or been cancelledthis one is on the register

Computed across the 880+ Kolhapur projects on ReraGenie, from their own filings.

Keep THE ENCLAVE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NAGALA PARK880+ in Kolhapur

2 kmTHE ENCLAVECompleted 47Lapsed / revoked 26Other 58Dot size: filed unitsN

Filed coordinates, straight-line distance. 131 registered projects within 2 km.

Builder: IDEAL REALTY

IDEAL REALTY has 1 registration on MahaRERA, including THE ENCLAVE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Kolhapur district page.

Frequently asked questions

What are my rights if THE ENCLAVE is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of THE ENCLAVE?

The registered promoter entity is IDEAL REALTY, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in THE ENCLAVE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for THE ENCLAVE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at THE ENCLAVE?

The professionals named in the filing: Architect: VISION ASSOCIATES; Engineer: VARUN UDYA KADAM; Chartered Accountant: SHANKAR PATIL & ASSOCIATES; Chartered Accountant: Amit Madanrao Shinde. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in THE ENCLAVE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About THE ENCLAVE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save THE ENCLAVE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.