THE EMPIRE
RG-MH-04083 · RERA P50500034373 · Last updated on MahaRERA portal: 24 Jun 2026
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.
See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
THE EMPIRE is a Residential / Group Housing project by INTEGRATED INFRACON in Nagpur, Maharashtra, registered with MahaRERA as P50500034373 on 4 Apr 2022. The registration is recorded completed; possession was promised by 30 Jun 2026. 46 of the 76 units on this registration are recorded sold or booked.
At a glance
Project
- NameTHE EMPIRE
- TypeResidential / Group Housing
- Location
- PACHPAOLI HOUSING ACCOMIDATION SCHEME
- LASHKAREBAGH
- Nagpur (M Corp.)
- Nagpur (Urban)
- Nagpur
- 440017
- Pincode440017
- MapView location on Google Maps (as filed on RERA)
- RERA no.P50500034373
- ReraGenie IDRG-MH-04083
Builder
- NameINTEGRATED INFRACON
- Entity typePartnership
- PartnersANIL TARACHAND WADHWANI, YOGESH BALIRAM SAHAJRAMANI, RAKESH OMPRAKASH HEMRAJANI, RAMDEO PRAHLADRAI AGRAWAL, RAJESH MULCHAND BATWANI
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on4 Apr 2022
- Promised completion30 Jun 2026
- Revised completionNone
- Buildings1 building record
- Documents filed103 files
Current status
Figures as on 24 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| THE EMPIRE | NA | 22 | 19 | 76 | 0 | 76 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 24 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
THE EMPIRE:
| Activity | Progress |
|---|---|
| Excavation | Not applicable |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | Not applicable |
| Sanitary Fittings within the flats / premises | Not applicable |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | Not applicable |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | Not applicable |
Progress on shared amenities15
As on 24 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 63% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 79% |
| Storm Water Drains | Yes | 59% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 79% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 63% |
| Electrical meter room, sub-station, receiving station | Yes | 66% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed2
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership6
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| KAVITA SUNIL AGRAWAL | Nagpur (M Corp.) | Nagpur |
| MANJU DEVI AGRAWAL | Nagpur (M Corp.) | Nagpur |
| VISHNU ROOPESH AGRAWAL | Nagpur (M Corp.) | Nagpur |
| GANESH WOOD PRODUCT | Nagpur (M Corp.) | Nagpur |
| SHIV WOOD INDUSTRIES | Nagpur (M Corp.) | Nagpur |
| SUNIL GOPALDAS AGRAWAL | Nagpur (M Corp.) | Nagpur |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| THE EMPIRE | NA | Rs 45.00 cr | Rs 45.00 cr |
| - | NA | Rs 52.88 lakh | Rs 52.88 lakh |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | LOKESH KADU |
| Engineer | Anil Wadhwani |
| Chartered Accountant | ANKIT TALREJA |
| Chartered Accountant | SUMIT SANTOSH AGRAWAL AND ASSOCIATES |
| Partner | Role in project |
|---|---|
| INTEGRATED INFRACON | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 18 Aug 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 25 Mar 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 25 Mar 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 25 Mar 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed103
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 103 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Occupational CertificateFile: The Empire_OC.pdf | 24 Jun 2026 |
| Withdrawal Update Form 1File: FORM-1 THE EMPERE MAR-2026.pdf | 20 Jun 2026 |
| Withdrawal Update Form 2File: FORM 2 THE EMPIRE MARCH 2026.pdf | 20 Jun 2026 |
| Withdrawal Update Form 3File: FORM 3 THE EMPIRE MARCH 2026.pdf | 20 Jun 2026 |
| Withdrawal Update Form 1File: FORM-1THE EMPIRE 01-07-2024_organized.pdf | 19 Apr 2026 |
| Withdrawal Update Form 2File: The Empire_Form-2-Engineers Certificate_JUNE-24.pdf | 19 Apr 2026 |
| Withdrawal Update Form 3File: THE EMPIRE_FORM 3_ JUNE-24.pdf | 19 Apr 2026 |
| Form 5 (FY 2024-2025)File: FORM-5 MARCH-2025 THE EMPIRE SCANNED.pdf | 30 Jan 2026 |
| Withdrawal Update Form 1File: FORM-1THE EMPIRE 01-07-2024_organized.pdf | 20 Jan 2026 |
| Withdrawal Update Form 1File: FORM-1THE EMPIRE 01-07-2024_organized.pdf | 20 Jan 2026 |
| Withdrawal Update Form 1File: FORM-1THE EMPIRE 01-07-2024_organized.pdf | 20 Jan 2026 |
| Withdrawal Update Form 2File: The Empire_Form-2-Engineers Certificate_JUNE-24.pdf | 20 Jan 2026 |
| Withdrawal Update Form 2File: The Empire_Form-2-Engineers Certificate_JUNE-24.pdf | 20 Jan 2026 |
| Withdrawal Update Form 2File: The Empire_Form-2-Engineers Certificate_JUNE-24.pdf | 20 Jan 2026 |
| Withdrawal Update Form 3File: THE EMPIRE_FORM 3_ JUNE-24.pdf | 20 Jan 2026 |
| Withdrawal Update Form 3File: THE EMPIRE_FORM 3_ JUNE-24.pdf | 20 Jan 2026 |
| Withdrawal Update Form 3File: THE EMPIRE_FORM 3_ JUNE-24.pdf | 20 Jan 2026 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 THE EMPIRE 05-04-2025.pdf | 23 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: t e f1.pdf | 21 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: te f3.pdf | 21 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: t e f2.pdf | 21 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: te s uns.pdf | 21 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2.pdf | 18 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2.pdf | 18 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2.pdf | 18 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 THE EMPIRE 02-01-2025.pdf | 4 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Sold-Unsold_Mar-24.pdf | 23 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: Sold-Unsold_June-24.pdf | 23 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: Sold-Unsold_Sep-24.pdf | 23 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 The Empire_Sep-2024.pdf | 2 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: The Empire_Form-2-Engineers Certificate_SEPT-24.pdf | 2 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 The Empire_Mar-24.pdf | 25 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 THE EMPIRE 08-10-2024.pdf | 16 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: The Empire_Form-2-Engineers Certificate_MAR-24.pdf | 7 Aug 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: The Empire_Form-2-Engineers Certificate_JUNE-24.pdf | 7 Aug 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: THE EMPIRE_FORM 3_ JUNE-24.pdf | 26 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1THE EMPIRE 01-07-2024_organized.pdf | 3 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: THE EMPIRE_FORM 3_ MARCH 2024.pdf | 21 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: THE EMPIRE_MAR-24.pdf | 6 Apr 2024 |
| Details of encumbrancesFile: encumbrance.pdf | 5 Mar 2024 |
| Details of encumbrances concerned to FinanceFile: encumbrance.pdf | 5 Mar 2024 |
| Details of encumbrances concerned to LegalFile: encumbrance.pdf | 5 Mar 2024 |
| Declaration in FORM BFile: FORM B.pdf | 5 Mar 2024 |
| Disclosure of sold/ booked inventoryFile: Sold-Unsold_June-22.pdf | 23 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: Sold-Unsold_Sep-22.pdf | 23 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: Sold-Unsold_Dec-22.pdf | 23 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: Sold-Unsold_Mar-23.pdf | 23 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: Sold-Unsold_June-23.pdf | 23 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: Sold-Unsold_Sep-23.pdf | 23 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: Sold-Unsold_Dec-23.pdf | 23 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: The Empire_Form-2-Engineers Certificate_Sep-23.pdf | 22 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: The Empire_Form-2-Engineers Certificate_Dec-23.pdf | 22 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: THE EMPIRE_Form-3_ Dec-23.pdf | 2 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FROM 1 THE EMPIRE DEC-23.pdf | 8 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 THE EMPIRE 05-10-202314102023192749-min.pdf | 20 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: The Empire_RERA 3_Registration -JUNE 2023.pdf | 20 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: The Empire_RERA 3_Registration -SEP 2023.pdf | 20 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: THE EMPIRE 25-08-2023 07-10-202307102023121911 (1).pdf | 20 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: THE EMPIRE_FORM-1_SEPT-23.pdf | 17 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: THE EMPIRE_FORM-5_.pdf | 10 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: EMPIRE RERA MAR 2023_.pdf | 22 Aug 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: EMPIRE RERA JUNE 2023_.pdf | 22 Aug 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: The Empire_Form-2-Engineers Certificate_june-22.pdf | 22 Aug 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: The Empire_Form-2-Engineers Certificate_Sept-22.pdf | 22 Aug 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: The Empire_Form-2-Engineers Certificate_Dec-22.pdf | 22 Aug 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: The Empire_Form-2-Engineers Certificate_Mar-23.pdf | 22 Aug 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: The Empire_Form-2-Engineers Certificate_June-23.pdf | 22 Aug 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: The EMPIRE_RERA_Form 2A -Mar-23.pdf | 19 Aug 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: The EMPIRE_RERA_Form 2A -Mar-23.pdf | 19 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: THE EMPIRE_FORM 3_ JUNE 2022_page-0001.pdf | 19 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: THE EMPIRE_FORM 3_ SEP 2022_page-0001.pdf | 19 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: THE EMPIRE_FORM 3_ DEC 2022_page-0001.pdf | 19 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: THE EMPIRE_FORM 3_ MARCH 2023_page-0001.pdf | 19 Aug 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: THE EMPIRE.pdf | 6 Jan 2023 |
| Other - LegalFile: FREE HOLD DOCUMENT.pdf | 12 Dec 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: THE EMPIRE RERA (1).pdf | 25 Nov 2022 |
| PAN CardFile: Integrated PAN.pdf | 18 Aug 2022 |
| Copy of the legal title reportFile: 11zon_merged-PDF (5).pdf | 18 Aug 2022 |
| Proforma of Allotment letterFile: Draft The Empire FINAL V2.pdf | 18 Aug 2022 |
| Proforma of Allotment letterFile: Allotment Letter - The Empire MahaRera (1).pdf | 18 Aug 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nagpur
Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.
Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 103 filed documents as one ZIP, foldered, with a manifest
Keep THE EMPIRE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near LASHKAREBAGH2,800+ in Nagpur
Filed coordinates, straight-line distance. 34 registered projects within 2 km.
UJRA HEIGHTS
VISHWAS UMESH CHOUKSEY
VIDHAYAM RESIDENCY
K M C REALTOR
GAURAV EUPHORIA
KRISHNAKANT GIRI
GAURAV VISTA
M/S GAURAV INFRA
OAK Med-Square
OAK Constructions
SHIVALIK RESIDENCY
VIRENDRA MOHANLAL AGRAWAL
See every Nagpur project, with the district possession charts
Builder: INTEGRATED INFRACON
INTEGRATED INFRACON has 1 registration on MahaRERA, including THE EMPIRE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.
Frequently asked questions
What are my rights if THE EMPIRE is delayed beyond 30 Jun 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of THE EMPIRE?
The registered promoter entity is INTEGRATED INFRACON, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in THE EMPIRE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for THE EMPIRE?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at THE EMPIRE?
The professionals named in the filing: Architect: LOKESH KADU; Engineer: Anil Wadhwani; Chartered Accountant: ANKIT TALREJA; Chartered Accountant: SUMIT SANTOSH AGRAWAL AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in THE EMPIRE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback