Home / Browse projects / Nagpur, Maharashtra / OAK Med-Square
OAK Med-Square
RG-MH-60679 · RERA P50500021511 · Last updated on MahaRERA portal: 20 Jan 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 10 months past the filed date
- 1 complaint at MahaRERA
- Completion date moved by 36 months
- 2 extensions taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
OAK Med-Square is a Others project by OAK Constructions in Nagpur, Maharashtra, registered with MahaRERA as P50500021511 on 5 Jul 2019. Possession was promised by 31 Dec 2025 and is now 10 months past that date. The completion date has moved by 36 months from the original filing. 5 of the 36 units on this registration are recorded sold or booked, and 2 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.
At a glance
Project
- NameOAK Med-Square
- TypeOthers
- Location
- Kamptee Road
- Indora
- Nagpur (M Corp.)
- Nagpur (Urban)
- Nagpur
- 440017
- Pincode440017
- MapView location on Google Maps (as filed on RERA)
- RERA no.P50500021511
- ReraGenie IDRG-MH-60679
Builder
- NameOAK Constructions
- Entity typePartnership
- PartnerRaffat Masood Khader
- Other registrations1 more →
- No longer live1 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on5 Jul 2019
- Promised completion31 Dec 2025
- Revised completionRevised to 31 Dec 2025 (originally 30 Dec 2022)
- Buildings1 building record
- Documents filed167 files
Current status
Figures as on 20 Jan 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| OAK Med-Square | NA | 4 | 4 | 0 | 36 | 36 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 20 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
2 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 90%.
OAK Med-Square: 65% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 85% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 78% |
| Slabs of Super Structure | 90% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 85% |
| Sanitary Fittings within the flats / premises | 35% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 78% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 45% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 19% |
Progress on shared amenities15
As on 20 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 15% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 45% |
| Electrical meter room, sub-station, receiving station | Yes | 50% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed1
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership2
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| OAK Constructions | Nagpur (M Corp.) | Nagpur |
| DEEPAK SUDARSHAN KHURANA | Nagpur (M Corp.) | Nagpur |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| OAK Med-Square | NA | Rs 9.90 cr | Rs 7.13 cr |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Syed Mobinuddin |
| Engineer | Nitin Balram Dandekar |
| Chartered Accountant | Mohammed Tajammul Hussain Ansari |
| Chartered Accountant | ANKIT TALREJA |
| Chartered Accountant | SUMIT SANTOSH AGRAWAL & ASSOCIATES |
| Partner | Role in project |
|---|---|
| OAK Constructions | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoter1) That project Oak Med-Square on Plot No. 16, City Survey No. 897, Sheet No. 47, House No. 20 Iis completed upto 90% as per current sanction and the promoter have applied for revised building plan and will get the same in 10 days and will be applying for the completion of the project within 9 months from this day as the project is delayed due to various unforeseen circumstances, effects of the pandemic and due to revised sanction and force majeure like storage of material, manpower, labour, lockdown, rise in prices, unavailability of sand etc etc. 2) It is further declared that due to minor t
Reason as filed by the promoterDECLARATION AND UNDERTAKING Project Details : Registration Number : P50500021511. Oak Medsquare, Plot No. 16, City Survey No. 897, Sheet No. 47, House No. 20, Nagpur-440017;. The undersigned Authorised Signatory/Promoter hereby do Declare and Undertake as under:- 1) That project Oak Med Square on : Plot No. 16, City Survey No. 897, Sheet No. 47, House No. 20, Nagpur-440017; is completed 60% and the promoter will be applying for the completion of the project within 2 years from this day as the project is delayed due to various unforeseen circumstances, effects of the pandemic and due to force m
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12501759 | Mahesh Chandrabhan Kingrani | Deepak Sudarshan Khurana | 29/05/2025 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 3 Aug 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 29 Jun 2019 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 29 Jun 2019 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 29 Jun 2019Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed167
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 167 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1 Oak Medsquare_DEC 2025.pdf | 20 Jan 2026 |
| Withdrawal Update Form 2File: Form 2 Oak Medsquare_DEC 2025.pdf | 20 Jan 2026 |
| Withdrawal Update Form 3File: Form 3 Oak Medsquare_DEC 2025.pdf | 20 Jan 2026 |
| Withdrawal Update Form 1File: FORM-1.pdf | 27 Oct 2025 |
| Withdrawal Update Form 2File: FORM-2.pdf | 27 Oct 2025 |
| Withdrawal Update Form 3File: FORM-3_compressed.pdf | 27 Oct 2025 |
| Withdrawal Update Form 1File: Form 1 June 25.pdf | 25 Oct 2025 |
| Withdrawal Update Form 2File: Form 2 June 25.pdf | 25 Oct 2025 |
| Withdrawal Update Form 3File: Form 3 June 25.pdf | 25 Oct 2025 |
| Withdrawal Update Form 1File: Form 1 June 25.pdf | 15 Jul 2025 |
| Withdrawal Update Form 2File: Form 2 June 25.pdf | 15 Jul 2025 |
| Withdrawal Update Form 3File: Form 3 June 25.pdf | 15 Jul 2025 |
| Form 2A (FY 2024-2025)File: Form 2A 2024-2025.pdf | 15 Jul 2025 |
| Form 5 (FY 2024-2025)File: Form 5 2024-2025.pdf | 8 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Medsquare Form 1 - March 25.pdf | 15 Apr 2025 |
| Certificates of CA (Form 3)File: Medsquare Form 3 - March 25.pdf | 15 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Medsquare Form 2 - March 25.pdf | 15 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD-UNSOLD.pdf | 15 Apr 2025 |
| Certificates of CA (Form 3)File: Form 3 Medsquare_Dec-2024.pdf | 22 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Medsquare_Dec-2024.pdf | 22 Jan 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Form 3 Medsquare_Dec-2024.pdf | 22 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold of Medsquare_Dec- 2024.pdf | 21 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Dec 24 OAK Medsquare.pdf | 2 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 med.pdf | 30 Oct 2024 |
| Certificates of CA (Form 3)File: Medsquare - Form 3 Sep 24.pdf | 17 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Medsquare - Form 2 Sep 24.pdf | 17 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Inventory - Medsquare Sep 24.pdf | 17 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Medsquare Sep 24.pdf | 14 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Medsquare - Form 2 June 24.pdf | 20 Jul 2024 |
| Certificates of CA (Form 3)File: Medsquare - Form 3 - June 24.pdf | 20 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Medsquare Inventory - June 24.pdf | 19 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Medsquare - Form 1 June 24 08-Jul-2024 16-33-28.pdf | 12 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 2 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24) (2).pdf | 8 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Mar 24 Medsquare.pdf | 13 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Mar 24 Medsquare.pdf | 13 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Sold-Unsold Inventory Medsquare 10-Apr-2024 17-03-31.pdf | 13 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: OAK MED-SQUARE_Architech Working_FORM-1_MAR-24.pdf | 10 Apr 2024 |
| Certificates of CA (Form 3)File: Med Square Form 3_ Mar-24-.pdf | 10 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Medsquare Dec 23.pdf | 9 Feb 2024 |
| Declaration in FORM BFile: Form B Medsquare 30-Jan-2024 13-09-01.pdf | 5 Feb 2024 |
| Certificates of CA (Form 3)File: Med Square Form 3_ Dec-23.pdf | 29 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: Medsquare - Inventory-Dec-23.pdf | 27 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Dec 23.pdf | 12 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: March 23.pdf | 21 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: June 23.pdf | 21 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: Sep 23.pdf | 21 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Medsquare - Sep 23.pdf | 20 Oct 2023 |
| Certificates of CA (Form 3)File: Form 3.pdf | 18 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Sep 23.pdf | 14 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 June 23 Medsquare.pdf | 12 Aug 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 June 23 Medsquare.pdf | 12 Aug 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 2022 -2023.pdf | 11 Aug 2023 |
| Certificates of CA (Form 3)File: Dec 22.pdf | 11 Aug 2023 |
| Certificates of CA (Form 3)File: Form 1 Medsquare March 23.pdf | 11 Aug 2023 |
| Certificates of CA (Form 3)File: Form 3 - Medsquare June 23.pdf | 11 Aug 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: March 23.pdf | 11 Aug 2023 |
| Details of encumbrances concerned to FinanceFile: Emcumbrance Certificate (Legal).pdf | 14 Jun 2023 |
| Details of encumbrances concerned to LegalFile: Emcumbrance Certificate (Legal).pdf | 14 Jun 2023 |
| Declaration about Commencement CertificateFile: FORM-D.pdf | 14 Jun 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Interest Discloser_Omair.pdf | 14 Jun 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Interest Discloser_Raffat.pdf | 14 Jun 2023 |
| Proforma of Agreement for saleFile: ATS_ OAK COnstruction.pdf | 14 Jun 2023 |
| Proforma of Allotment letterFile: Allotment Letter.pdf | 14 Jun 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration Bank Account.pdf | 14 Jun 2023 |
| Deviation Report with respect to Allotment letterFile: Deviation_Allotment Letter.pdf | 14 Jun 2023 |
| Deviation Report with respect to model copy of AgreementFile: ATS_ OAK COnstruction.pdf | 14 Jun 2023 |
| Deviation Report with respect to model copy of AgreementFile: Deviation_Agreement to Sale.pdf | 14 Jun 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Medsquare Form 1- Dec 22.pdf | 8 Jun 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Medsquare Form 1 - March 23.pdf | 8 Jun 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Medsquare Form 2 - Dec 22.pdf | 8 Jun 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Medsquare Form 2 - March 23.pdf | 8 Jun 2023 |
| Certificates of CA (Form 3)File: Medsquare - Form 3 March 23.pdf | 2 Jun 2023 |
| Disclosure of sold/ booked inventoryFile: Sold-Booked Inventory Sep 22.pdf | 22 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM-5_MED-SQUARE_19-20.pdf | 21 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM-5_MED-SQUARE_20-21.pdf | 21 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM-5_MED-SQUARE_21-22.pdf | 21 Feb 2023 |
| Certificates of CA (Form 3)File: FORM-3_MED-SQUARE_SEP-19.pdf | 19 Feb 2023 |
| Certificates of CA (Form 3)File: FORM-3_MED-SQUARE_DEC-19.pdf | 19 Feb 2023 |
| Certificates of CA (Form 3)File: FORM-3_MED-SQUARE_MAR-20.pdf | 19 Feb 2023 |
| Certificates of CA (Form 3)File: FORM-3_MED-SQUARE_JUN-20.pdf | 19 Feb 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nagpur
Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.
Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 5 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 167 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep OAK Med-Square on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Indora2,800+ in Nagpur
Filed coordinates, straight-line distance. 42 registered projects within 2 km.
THE EMPIRE
INTEGRATED INFRACON
UJRA HEIGHTS
VISHWAS UMESH CHOUKSEY
VIDHAYAM RESIDENCY
K M C REALTOR
GAURAV EUPHORIA
KRISHNAKANT GIRI
GAURAV VISTA
M/S GAURAV INFRA
SHIVALIK RESIDENCY
VIRENDRA MOHANLAL AGRAWAL
See every Nagpur project, with the district possession charts
Builder: OAK Constructions
OAK Constructions has 2 registrations on MahaRERA, including OAK Med-Square and OAK SHANTINIKETAN. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.
Frequently asked questions
What does it mean that OAK Med-Square shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if OAK Med-Square is delayed beyond 31 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of OAK Med-Square?
The registered promoter entity is OAK Constructions, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in OAK Med-Square?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against OAK Med-Square?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for OAK Med-Square?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at OAK Med-Square?
The professionals named in the filing: Architect: Syed Mobinuddin; Engineer: Nitin Balram Dandekar; Chartered Accountant: Mohammed Tajammul Hussain Ansari; Chartered Accountant: ANKIT TALREJA; Chartered Accountant: SUMIT SANTOSH AGRAWAL & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in OAK Med-Square?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.