THE COVE
By Forest Trails Cove Developers Private Limited
RG-MH-33527 · RERA P52100048536 · Last updated on MahaRERA portal: 10 Nov 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
THE COVE is a Others project by Forest Trails Cove Developers Private Limited in Pune, Maharashtra, registered with MahaRERA as P52100048536 on 6 Jan 2023. Possession is promised by 1 Jan 2028. 46 of the 83 units on this registration are recorded sold or booked.
At a glance
Project
- NameTHE COVE
- TypeOthers
- Location
- Paud Road
- Bhugaon
- Mulshi
- Pune
- 412115
- Pincode412115
- RERA no.P52100048536
- ReraGenie IDRG-MH-33527
Builder
- NameForest Trails Cove Developers Private Limited
- Entity typeCompany
- DirectorSHRIKANT PURUSHOTTAM PARANJAPE
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on6 Jan 2023
- Promised completion1 Jan 2028
- Revised completionNone
- Buildings85 building records
- Documents filed56 files
Current status
Figures as on 10 Nov 2025, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Bungalow 2 | NA | 3 | 1 | 1 | 0 | 1 |
| Bunglaow 1 | NA | 3 | 1 | 1 | 0 | 1 |
| Bungalow 3 | NA | 3 | 1 | 1 | 0 | 1 |
| Bungalow 4 | NA | 3 | 1 | 1 | 0 | 1 |
| Bungalow 5 | NA | 3 | 1 | 1 | 0 | 1 |
| Bungalow 6 | NA | 3 | 1 | 1 | 0 | 1 |
| Bungalow 7 | NA | 3 | 1 | 1 | 0 | 1 |
| Bungalow 8 | NA | 3 | 1 | 1 | 0 | 1 |
| Bungalow 9 | NA | 3 | 1 | 1 | 0 | 1 |
| Bungalow 10 | NA | 3 | 1 | 1 | 0 | 1 |
| Bungalow 11 | NA | 3 | 1 | 1 | 0 | 1 |
| Bungalow 12 | NA | 3 | 1 | 1 | 0 | 1 |
| Bungalow 13 | NA | 2 | 1 | 1 | 0 | 1 |
| Bungalow 14 | NA | 2 | 1 | 1 | 0 | 1 |
| Bungalow 15 | NA | 2 | 1 | 1 | 0 | 1 |
| Bungalow 16 | NA | 2 | 1 | 1 | 0 | 1 |
| Bungalow 17 | NA | 2 | 1 | 1 | 0 | 1 |
| Bungalow 18 | NA | 2 | 1 | 1 | 0 | 1 |
| Bungalow 19 | NA | 2 | 1 | 1 | 0 | 1 |
| Bungalow 20 | NA | 2 | 1 | 1 | 0 | 1 |
| Bungalow 21 | NA | 2 | 1 | 1 | 0 | 1 |
| Bungalow 22 | NA | 2 | 1 | 1 | 0 | 1 |
| Bungalow 23 | NA | 2 | 1 | 1 | 0 | 1 |
| Bungalow 24 | NA | 2 | 1 | 1 | 0 | 1 |
| Bungalow 25 | NA | 2 | 1 | 1 | 0 | 1 |
| Bungalow 26 | NA | 2 | 1 | 1 | 0 | 1 |
| Bungalow 27 | NA | 2 | 1 | 1 | 0 | 1 |
| Bungalow 28 | NA | 2 | 1 | 1 | 0 | 1 |
| Bungalow 29 | NA | 2 | 1 | 1 | 0 | 1 |
| Bungalow 30 | NA | 2 | 1 | 1 | 0 | 1 |
| Bungalow 31 | NA | 2 | 1 | 1 | 0 | 1 |
| Bungalow 32 | NA | 2 | 1 | 1 | 0 | 1 |
| Bungalow 33 | NA | 2 | 1 | 1 | 0 | 1 |
| Bungalow 34 | NA | 2 | 1 | 1 | 0 | 1 |
| Bungalow 35 | NA | 2 | 1 | 1 | 0 | 1 |
| Bungalow 36 | NA | 2 | 1 | 1 | 0 | 1 |
| Bungalow 37 | NA | 2 | 1 | 1 | 0 | 1 |
| Bungalow 38 | NA | 2 | 1 | 1 | 0 | 1 |
| Bungalow 39 | NA | 2 | 1 | 1 | 0 | 1 |
| Bungalow 40 | NA | 2 | 1 | 1 | 0 | 1 |
| Bungalow 41 | NA | 2 | 1 | 1 | 0 | 1 |
| Bungalow 42 | NA | 2 | 1 | 1 | 0 | 1 |
| Bungalow 43 | NA | 2 | 1 | 1 | 0 | 1 |
| Bungalow 44 | NA | 2 | 1 | 1 | 0 | 1 |
| Bungalow 45 | NA | 2 | 1 | 1 | 0 | 1 |
| Bungalow 46 | NA | 2 | 1 | 1 | 0 | 1 |
| Bungalow 47 | NA | 2 | 1 | 1 | 0 | 1 |
| Bungalow 48 | NA | 2 | 1 | 1 | 0 | 1 |
| Bungalow 49 | NA | 2 | 1 | 1 | 0 | 1 |
| Bungalow 50 | NA | 2 | 1 | 1 | 0 | 1 |
| Bungalow 51 | NA | 2 | 1 | 1 | 0 | 1 |
| Bungalow 52 | NA | 2 | 1 | 1 | 0 | 1 |
| Bungalow 53 | NA | 2 | 1 | 1 | 0 | 1 |
| Bungalow 54 | NA | 2 | 1 | 1 | 0 | 1 |
| Bungalow 78 | NA | 2 | 1 | 1 | 0 | 1 |
| Bungalow 79 | NA | 2 | 1 | 1 | 0 | 1 |
| Bungalow 80 | NA | 2 | 1 | 1 | 0 | 1 |
| Bungalow 81 | NA | 2 | 1 | 1 | 0 | 1 |
| Bungalow 82 | NA | 2 | 1 | 1 | 0 | 1 |
| Bungalow 83 | NA | 2 | 1 | 1 | 0 | 1 |
| Bungalow 84 | NA | 2 | 1 | 1 | 0 | 1 |
| Bungalow 85 | NA | 2 | 1 | 1 | 0 | 1 |
| Bungalow 55 | NA | 2 | 1 | 1 | 0 | 1 |
| Bungalow 56 | NA | 2 | 1 | 1 | 0 | 1 |
| Bungalow 57 | NA | 2 | 1 | 1 | 0 | 1 |
| Bungalow 59 | NA | 2 | 1 | 1 | 0 | 1 |
| Bungalow 60 | NA | 2 | 1 | 1 | 0 | 1 |
| Bungalow 61 | NA | 2 | 1 | 1 | 0 | 1 |
| Bungalow 62 | NA | 2 | 1 | 1 | 0 | 1 |
| Bungalow 63 | NA | 2 | 2 | 1 | 0 | 1 |
| Bungalow 64 | NA | 0 | 0 | 0 | 0 | 0 |
| Bungalow 65 | NA | 2 | 2 | 1 | 0 | 1 |
| Bungalow 66 | NA | 0 | 0 | 0 | 0 | 0 |
| Bungalow 67 | NA | 2 | 0 | 1 | 0 | 1 |
| Bungalow 68 | NA | 2 | 0 | 1 | 0 | 1 |
| Bungalow 69 | NA | 2 | 0 | 1 | 0 | 1 |
| Bungalow 70 | NA | 2 | 0 | 1 | 0 | 1 |
| Bungalow 71 | NA | 2 | 0 | 1 | 0 | 1 |
| Bungalow 72 | NA | 2 | 0 | 1 | 0 | 1 |
| Bungalow 58 | NA | 2 | 0 | 1 | 0 | 1 |
| Bungalow 73 | NA | 2 | 0 | 1 | 0 | 1 |
| Bungalow 74 | NA | 2 | 0 | 1 | 0 | 1 |
| Bungalow 75 | NA | 2 | 0 | 1 | 0 | 1 |
| Bungalow 76 | NA | 2 | 0 | 1 | 0 | 1 |
| Bungalow 77 | NA | 2 | 0 | 1 | 0 | 1 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building20
As on 10 Nov 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection. The count above covers all 85 buildings; the table lists the first 20.
Bungalow 2Not stated
| Activity | Progress |
|---|---|
| Excavation | Not applicable |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | Not applicable |
| Sanitary Fittings within the flats / premises | Not applicable |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | Not applicable |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | Not applicable |
Bunglaow 1Not stated
| Activity | Progress |
|---|---|
| Excavation | Not applicable |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | Not applicable |
| Sanitary Fittings within the flats / premises | Not applicable |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | Not applicable |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | Not applicable |
Bungalow 3Not stated
| Activity | Progress |
|---|---|
| Excavation | Not applicable |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | Not applicable |
| Sanitary Fittings within the flats / premises | Not applicable |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | Not applicable |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | Not applicable |
Bungalow 4Not stated
| Activity | Progress |
|---|---|
| Excavation | Not applicable |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | Not applicable |
| Sanitary Fittings within the flats / premises | Not applicable |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | Not applicable |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | Not applicable |
Bungalow 5Not stated
| Activity | Progress |
|---|---|
| Excavation | Not applicable |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | Not applicable |
| Sanitary Fittings within the flats / premises | Not applicable |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | Not applicable |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | Not applicable |
Bungalow 6Not stated
| Activity | Progress |
|---|---|
| Excavation | Not applicable |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | Not applicable |
| Sanitary Fittings within the flats / premises | Not applicable |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | Not applicable |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | Not applicable |
Bungalow 7Not stated
| Activity | Progress |
|---|---|
| Excavation | Not applicable |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | Not applicable |
| Sanitary Fittings within the flats / premises | Not applicable |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | Not applicable |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | Not applicable |
Bungalow 8Not stated
| Activity | Progress |
|---|---|
| Excavation | Not applicable |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | Not applicable |
| Sanitary Fittings within the flats / premises | Not applicable |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | Not applicable |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | Not applicable |
Bungalow 9Not stated
| Activity | Progress |
|---|---|
| Excavation | Not applicable |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | Not applicable |
| Sanitary Fittings within the flats / premises | Not applicable |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | Not applicable |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | Not applicable |
Bungalow 10Not stated
| Activity | Progress |
|---|---|
| Excavation | Not applicable |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | Not applicable |
| Sanitary Fittings within the flats / premises | Not applicable |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | Not applicable |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | Not applicable |
Bungalow 11Not stated
| Activity | Progress |
|---|---|
| Excavation | Not applicable |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | Not applicable |
| Sanitary Fittings within the flats / premises | Not applicable |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | Not applicable |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | Not applicable |
Bungalow 12Not stated
| Activity | Progress |
|---|---|
| Excavation | Not applicable |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | Not applicable |
| Sanitary Fittings within the flats / premises | Not applicable |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | Not applicable |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | Not applicable |
Bungalow 13Not stated
| Activity | Progress |
|---|---|
| Excavation | Not applicable |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | Not applicable |
| Sanitary Fittings within the flats / premises | Not applicable |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | Not applicable |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | Not applicable |
Bungalow 14Not stated
| Activity | Progress |
|---|---|
| Excavation | Not applicable |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | Not applicable |
| Sanitary Fittings within the flats / premises | Not applicable |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | Not applicable |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | Not applicable |
Bungalow 15Not stated
| Activity | Progress |
|---|---|
| Excavation | Not applicable |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | Not applicable |
| Sanitary Fittings within the flats / premises | Not applicable |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | Not applicable |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | Not applicable |
Bungalow 16Not stated
| Activity | Progress |
|---|---|
| Excavation | Not applicable |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | Not applicable |
| Sanitary Fittings within the flats / premises | Not applicable |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | Not applicable |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | Not applicable |
Bungalow 17Not stated
| Activity | Progress |
|---|---|
| Excavation | Not applicable |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | Not applicable |
| Sanitary Fittings within the flats / premises | Not applicable |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | Not applicable |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | Not applicable |
Bungalow 18Not stated
| Activity | Progress |
|---|---|
| Excavation | Not applicable |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | Not applicable |
| Sanitary Fittings within the flats / premises | Not applicable |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | Not applicable |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | Not applicable |
Bungalow 19Not stated
| Activity | Progress |
|---|---|
| Excavation | Not applicable |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | Not applicable |
| Sanitary Fittings within the flats / premises | Not applicable |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | Not applicable |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | Not applicable |
Bungalow 20Not stated
| Activity | Progress |
|---|---|
| Excavation | Not applicable |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | Not applicable |
| Sanitary Fittings within the flats / premises | Not applicable |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | Not applicable |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | Not applicable |
Progress on shared amenities15
As on 10 Nov 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 30% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 60% |
| Storm Water Drains | Yes | 60% |
| Landscaping & Tree Planting | Yes | 10% |
| Street Lighting | Yes | 10% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed2
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| Bungalow 2 | 1 | 1 |
| Bunglaow 1 | 1 | 1 |
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Linker Shelter Private Limited | Mumbai City | Mumbai City |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Aniruddha Vaidya & Associates |
| Engineer | Pooja Ranjekar |
| Chartered Accountant | Kapure & Kapure |
| Chartered Accountant | HMA & Associates |
| Partner | Role in project |
|---|---|
| Forest Trails Cove Developers Private Limited | - |
Litigation declared4
| Case | Court | Status |
|---|---|---|
| 186/2018/2018 | Civil Judge Senior Division | Matter is kept for issues |
| 1480/2011/2011 | Civil Judge Senior Division | Matter is kept for hearing |
| 593/2018/2018 | Civil Judge Senior Division | Matter is kept for Other Respondents to appear |
| 1120/2022/2022 | Civil Judge Senior Division | Matter is kept for hearing |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 4 Aug 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 5 Dec 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 5 Dec 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 5 Dec 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 1 Jan 2028
Documents filed56
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 5 (FY 2024-2025)File: FTCDPL_Form 5_FY24-25.pdf | 10 Nov 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-The Cove-Mar'25-uploaded.pdf | 8 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 -The cove-Dec'24-uploaded.pdf | 24 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-The Cove-Dec'24-uplaoded.pdf | 15 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5-The COVE-FY 23-24-uploaded.pdf | 19 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-The Cove-Sept'24-uploaded.pdf | 17 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2-The cove-Sept'24-uploaded.pdf | 17 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure-Sold-Unsold-The Cove-June'24-uploaded.pdf | 20 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 25 FORM 2-The Cove-June'24-uploaded.pdf | 8 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 17 The Cove-FORM 1-June'24-uploaded.pdf | 4 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 6 The Cove-FORM 2A-June'24-uploaded.pdf | 4 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Inventory Report-The cove-Mar'24-uploaded.pdf | 17 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-The Cove-Mar'24-uploaded.pdf | 10 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2-THE COVE-Mar'24-uploaded.pdf | 4 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A-The Cove-Mar'24-uploaded.pdf | 1 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2-The COVE-Dec'23-uploaded.pdf | 6 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-The Cove-Dec'23-uploaded.pdf | 3 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A DEC 2023 THE COVE-uploaded.pdf | 3 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 2 A JUNE 23 THE COVE.pdf | 26 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 2 A MARCH 23 THE COVE.pdf | 26 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5-The Cove-Fy 22-23-uploaded.pdf | 19 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2- The cove-Sept'23-uploaded.pdf | 11 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: Inventory data-The Cove-Sept'23-uploaded.pdf | 10 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-The Cove-Sept'23-uploaded.pdf | 5 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 2 A SEPT 23 THE COVE-uploaded.pdf | 3 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3-CA Certificate-The COve - 31st July 23.pdf | 28 Aug 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- The Cove-Mar'23.pdf | 11 Aug 2023 |
| Disclosure of sold/ booked inventoryFile: The Cove-Inventory Report-Mar'23.pdf | 11 Aug 2023 |
| Disclosure of sold/ booked inventoryFile: Inventory Report-The Cove-June'23 uploaded.pdf | 10 Aug 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2-The Cove-Mar'23-PSCL.pdf | 8 Aug 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2-The Cove-June'23-FTCDPL.pdf | 8 Aug 2023 |
| Copy of the legal title reportFile: The Cove Project RERA Search -FTCDPL as the Promoter-01Aug2023.pdf | 4 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: THE COVE-Form 3 - FTCDPL-3rd March 2023.pdf | 4 Aug 2023 |
| Proforma of Agreement for saleFile: 1 2 The Cove Project (R-46A) AFS-FTCDPL Promoter-31July2023.pdf | 31 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-The Cove-June 23-uploaded.pdf | 11 Jul 2023 |
| CERSAI detailsFile: PSCL - Declaration.pdf | 27 Dec 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA Certificate THE COVE.pdf | 27 Dec 2022 |
| Proforma of Agreement for saleFile: AFS_The Cove_Paranjpe Scheme_27122022.pdf | 27 Dec 2022 |
| Deviation Report with respect to model copy of AgreementFile: Deviation Report AFS -The COVE.pdf | 27 Dec 2022 |
| CERSAI detailsFile: CERSAI details FT-S No 90 R46A The COVE (2).pdf | 22 Dec 2022 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration Bank Account PSCL.pdf | 14 Dec 2022 |
| Details of encumbrances concerned to FinanceFile: DETAILS OF ENCUMBRANCES BY PROMOTER.pdf | 12 Dec 2022 |
| Details of encumbrances concerned to FinanceFile: ENCUMBRANCES CONCERNED TO LEGAL.pdf | 12 Dec 2022 |
| Details of encumbrances concerned to LegalFile: DETAILS OF ENCUMBRANCES BY PROMOTER.pdf | 12 Dec 2022 |
| Details of encumbrances concerned to LegalFile: ENCUMBRANCES CONCERNED TO LEGAL.pdf | 12 Dec 2022 |
| Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMNT CERTIFICATE.pdf | 12 Dec 2022 |
| Declaration in FORM BFile: Form B Promoter PSCL R46A The Cove.pdf | 12 Dec 2022 |
| Proforma of Allotment letterFile: PROFORMA ALLOTMENT LETTER.pdf | 12 Dec 2022 |
| Deviation Report with respect to Allotment letterFile: DEVIATION REPORT WITH RESPECT TO ALLOTMENT LETTER.pdf | 12 Dec 2022 |
| Copy of the legal title reportFile: Title Report -The COVE R46A.pdf | 8 Dec 2022 |
| Layout approvalFile: Copy of Layout R46A The Cove.pdf | 5 Dec 2022 |
| Building plan approvalFile: Copy of Layout R46A The Cove.pdf | 5 Dec 2022 |
| Copy of Layout Approval (in case of layout)File: Copy of Layout R46A The Cove.pdf | 5 Dec 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Copy of Layout R46A The Cove.pdf | 5 Dec 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement R46A THE COVE.pdf | 5 Dec 2022 |
| PAN CardFile: PSCL-PAN.pdf | 25 Nov 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- All 56 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep THE COVE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bhugaon13,700+ in Pune
Avian Valley - Solaire
KAKADE ESTATE DEVELOPERS PVT. LTD.
Park Pebbles Phase I
M/s Rainbow Purple Construction LLP
Mahindra Rivenza Phase 2
Mahindra Lifespace Developers limited
Mahindra Rivenza Phase 1
Mahindra Lifespace Developers limited
FOREST TRAILS ATHASHRI B3
LAVIM DEVELOPERS PVT LTD
KOHINOOR WOODSHIRE
INTOFINITY PROMOTERS PRIVATE LIMITED
Builder: Forest Trails Cove Developers Private Limited
Forest Trails Cove Developers Private Limited has 1 registration on MahaRERA, including THE COVE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if THE COVE is delayed beyond 1 Jan 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of THE COVE?
The registered promoter entity is Forest Trails Cove Developers Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in THE COVE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for THE COVE?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at THE COVE?
The professionals named in the filing: Architect: Aniruddha Vaidya & Associates; Engineer: Pooja Ranjekar; Chartered Accountant: Kapure & Kapure; Chartered Accountant: HMA & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in THE COVE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback