Home / Browse projects / Thane, Maharashtra / The Anantaa Phase I

Registered No litigation declared Residential / Group Housing project

The Anantaa Phase I

By Ashtha Vinayak Developers LLP

RG-MH-28527 · RERA P51700026651 · Last updated on MahaRERA portal: 1 Sep 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 48 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Jan 2030Possession promisedmoved 48 months from the original
0 of 11Construction stages donefurthest along: Excavation, 27%
22 of 22Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 95 documents Report an error

The Anantaa Phase I is a Residential / Group Housing project by Ashtha Vinayak Developers LLP in Thane, Maharashtra, registered with MahaRERA as P51700026651 on 21 Oct 2020. Possession is promised by 31 Jan 2030. The completion date has moved by 48 months from the original filing. 0 of the 22 units on this registration are recorded sold or booked, and 0 of 11 construction stages are filed complete.

At a glance

Project

  • NameThe Anantaa Phase I
  • TypeResidential / Group Housing
  • Location
    • Uttan Check Post
    • Uttan
    • Mira-Bhayandar (M Corp.)
    • Thane
    • 401106
  • Pincode401106
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700026651
  • ReraGenie IDRG-MH-28527

Builder

  • NameAshtha Vinayak Developers LLP
  • Entity typePartnership
  • PartnersMIlan Govindrao Patil, Ajit Bhagwan Patil, Rameshchandra Gulabchand Bhutra

Key dates

this monthRegisteredOct 2020First promiseJan 2026Revised toJan 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on21 Oct 2020
  • Promised completion31 Jan 2030
  • Revised completionRevised to 31 Jan 2030 (originally 31 Jan 2026)
  • Buildings1 building record
  • Documents filed95 files

Current status

0%0 of 22 units booked
9.6%Work done, per cost certificate

Figures as on 1 Sep 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
1NA56222022

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 1 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 27%.

1: 6% average across the applicable activities

ActivityProgress
Excavation27%
Basement (if any)0%
Podiums (if any)0%
Plinth18%
Stilt Floor9%
Slabs of Super Structure9%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 1 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed6

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots6
Closed/Covered6

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area15,591 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on31 Jan 2026

Approvals and building plan

Sanctioning authorityMIRA BHAYANDAR MUNICIPAL CORPORATION
Permissible FSI3913.84
Proposed, not sanctioned1,414 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBhayandar West
Estimated costRs 14.66 cr
Cost incurredRs 1.40 cr
Work done9.55%
BuildingWingEstimatedIncurred
1NARs 14.66 crRs 1.40 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectArchisum
EngineerS S Thatte
EngineerSANDEEP SAKPAL
Chartered AccountantShivratan Agarwal
Chartered AccountantVAIBHAV HARISHCHADRA PATIL
Chartered AccountantSHAILESH S WADHAWNIYA
PartnerRole in project
Ashtha Vinayak Developers LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA09022619770Jan 2026 → Jan 2030

Reason as filed by the promoter1. As on date, around 20% of the construction work of the project has been completed. 2. Due to various administrative, financial, and technical constraints, there has been a delay in the progress of the project. 3. No bookings have been made, and no funds have been collected from any allottee till date. 4. We are fully committed to completing the project and are in the process of arranging the necessary resources to continue the work in a phased and time-bound manner. 5. Based on the current work plan and realistic project schedule, we expect to complete the entire project including all requi

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 9 Oct 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 9 Oct 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 9 Oct 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 9 Oct 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Jan 2030

Documents filed95

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 95 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Ananta Form 1 June 2026.pdf1 Sep 2026
Withdrawal Update Form 2File: Ananta Form 2 June 2026.pdf1 Sep 2026
Withdrawal Update Form 3File: Ananta Form 3 June 2026.pdf1 Sep 2026
Form 5 (FY 2024-2025)File: Ananta Form 5 FY 24-25.pdf1 Sep 2026
Withdrawal Update Form 1File: Ananta Form 1 March 2026.pdf10 Aug 2026
Withdrawal Update Form 2File: Ananta Form 2 March 2026.pdf10 Aug 2026
Withdrawal Update Form 3File: Ananta Form 3 March 2026.pdf10 Aug 2026
Form 2A (FY 2024-2025)File: Form 2A FY 2024-25.pdf6 Jul 2026
Form 2A (FY 2025-2026)File: Form 2A FY 2025-26.pdf6 Jul 2026
Withdrawal Update Form 1File: AVD Form 1 .pdf9 Feb 2026
Withdrawal Update Form 2File: AVD Form 2.pdf9 Feb 2026
Withdrawal Update Form 3File: AVD Form 3.pdf9 Feb 2026
Withdrawal Update Form 1File: Form 1 Ananta Phase 1 30062025.pdf31 Jan 2026
Withdrawal Update Form 1File: Ananta Phase 1 Form 1 30092025.pdf31 Jan 2026
Withdrawal Update Form 2File: Form 2 Ananta Phase 1 30062025.pdf31 Jan 2026
Withdrawal Update Form 2File: Ananta Phase 1 Form 2 30092025.pdf31 Jan 2026
Withdrawal Update Form 3File: Form 3 Ananta Phase 1 30062025.pdf31 Jan 2026
Withdrawal Update Form 3File: Ananta Phase 1 Form 3 30092025.pdf31 Jan 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: AVD Form 3_compressed.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf19 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf19 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A.pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form - 2.pdf20 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Anantaa form 5.pdf26 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Ananta.pdf21 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 AC.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf19 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 The A_compressed.pdf20 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 AC_compressed (1).pdf19 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2 EC compressed.pdf19 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf20 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_compressed.pdf20 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 The Pentagon.pdf19 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 The Anantaa Phase I.pdf19 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2 - Engineer's Certificate.pdf19 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf19 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf20 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf18 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf18 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 AVD.pdf30 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf21 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf21 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form -2A engineee certificate for quality assurance_001.pdf21 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form -2A engineee certificate for quality assurance_001.pdf21 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf21 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf20 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf20 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_compressed.pdf21 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf21 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_compressed.pdf27 Oct 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM - 3_.pdf21 Oct 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf20 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5.pdf15 Oct 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf8 Jul 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf12 Apr 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - The Anantaa Phase 1.pdf11 Apr 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - The Anantaa Phase 1.pdf11 Apr 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A The Anantaa Phase I.pdf11 Apr 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf27 Jan 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf7 Jan 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Ashtha Vinayak-Form_5_signed.pdf11 Nov 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf14 Oct 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf14 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form-2A.pdf14 Oct 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf14 Oct 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf30 Aug 2021
Declaration about Commencement CertificateFile: Declaration About Commencement Certificate.pdf18 Aug 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf13 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A.pdf13 Aug 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf13 Aug 2021
Layout approvalFile: Layout_compressed.pdf9 Oct 2020
Building plan approvalFile: Type A B and C plan_compressed.pdf9 Oct 2020
Building plan approvalFile: Hotel plan_compressed.pdf9 Oct 2020
Building plan approvalFile: Club House plan_compressed.pdf9 Oct 2020

How this compares with Thane

0%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 48 months
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep The Anantaa Phase I on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Uttan7,600+ in Thane

Builder: Ashtha Vinayak Developers LLP

Ashtha Vinayak Developers LLP has 1 registration on MahaRERA, including The Anantaa Phase I. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if The Anantaa Phase I is delayed beyond 31 Jan 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of The Anantaa Phase I?

The registered promoter entity is Ashtha Vinayak Developers LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in The Anantaa Phase I?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for The Anantaa Phase I?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at The Anantaa Phase I?

The professionals named in the filing: Architect: Archisum; Engineer: S S Thatte; Engineer: SANDEEP SAKPAL; Chartered Accountant: Shivratan Agarwal; Chartered Accountant: VAIBHAV HARISHCHADRA PATIL; Chartered Accountant: SHAILESH S WADHAWNIYA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in The Anantaa Phase I?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About The Anantaa Phase I. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save The Anantaa Phase I to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.