Registered No litigation declared Residential / Group Housing project

ESTRELLA VILLAS

By BHAVYA DEVELOPERS

RG-MH-31840 · RERA P51700080164 · Last updated on MahaRERA portal: 27 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Jan 2027Possession promisedno revision filed
17 of 110Construction stages doneacross 10 buildings; furthest along: Staircases, 90%
54 of 66Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 48 documents Report an error

ESTRELLA VILLAS is a Residential / Group Housing project by BHAVYA DEVELOPERS in Thane, Maharashtra, registered with MahaRERA as P51700080164 on 2 May 2025. Possession is promised by 31 Jan 2027. 12 of the 66 units on this registration are recorded sold or booked, and 17 of 110 construction stages are filed complete.

At a glance

Project

  • NameESTRELLA VILLAS
  • TypeResidential / Group Housing
  • Location
    • S NO 186 B
    • BHAYANDER WEST
    • UTTAN
    • Mira-Bhayandar (M Corp.)
    • Thane
    • 401106
  • Pincode401106
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700080164
  • ReraGenie IDRG-MH-31840

Builder

  • NameBHAVYA DEVELOPERS
  • Entity typePartnership

Key dates

this monthRegisteredMay 2025PromisedJan 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on2 May 2025
  • Promised completion31 Jan 2027
  • Revised completionNone
  • Buildings10 building records
  • Documents filed48 files

Current status

18%12 of 66 units booked
34.0%Work done, per cost certificate

Figures as on 27 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Row House Type A2NA2210010
Wing A1NA2224024
Row House Type A3NA2210010
Row House Type A4NA22404
Row House Type A5NA22606
Row House Type A6NA22404
Twin House Type B1NA22202
Twin House Type B2NA22202
Twin House Type B3NA22202
Twin House Type B4NA22202

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building10

As on 27 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

17 of 110 construction stages are filed complete across 10 buildings. The stage furthest along is Staircases, at 90%.

Row House Type A216%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth80%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Wing A114%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth50%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Row House Type A318%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Row House Type A418%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Row House Type A546%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.20%
Row House Type A655%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.20%
Twin House Type B19%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Twin House Type B29%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Twin House Type B30%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Twin House Type B40%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 27 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes20%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed8

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots8
Closed/Covered8
BuildingClosed/CoveredTotal
Twin House Type B122
Twin House Type B222
Twin House Type B322
Twin House Type B422

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area14,060 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on28 Apr 2026
LandownerVillageDistrict
Vlife Spaces & Infra Developers Pvt. Ltd.BHAYANDARThane

Approvals and building plan

Sanctioning authorityMIRA BHAYANDER MUNICIPAL CORPORATION
Permissible FSI5423.51
Proposed, not sanctioned3,424 sq m
Buildings approved10
Buildings sanctioned10

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchRASHMI PRIME CORNER 1,SHOP NO.10-13OPP KANAKIA POLICE STATIONBEVERLY PARK, MIRA ROAD EAST
Estimated costRs 15.50 cr
Cost incurredRs 5.27 cr
Work done33.98%
BuildingWingEstimatedIncurred
Wing A1NARs 2.76 crRs 96.52 lakh
Row House Type A2NARs 2.45 crRs 85.74 lakh
Row House Type A3NARs 2.45 crRs 85.74 lakh
-NARs 1.50 cr-
Row House Type A5NARs 1.47 crRs 73.49 lakh
Row House Type A4NARs 97.99 lakhRs 34.30 lakh
Row House Type A6NARs 97.99 lakhRs 48.99 lakh
Twin House Type B1NARs 72.83 lakhRs 25.49 lakh
Twin House Type B2NARs 72.83 lakhRs 25.49 lakh
Twin House Type B3NARs 72.83 lakhRs 25.49 lakh
Twin House Type B4NARs 72.83 lakhRs 25.49 lakh

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectTEJ'S CONSULTANT
Architect1 STUDIO ARCH
EngineerBASAVARAJ S GADEKAR
EngineerM D PANDYA & ASSOCIATES MAYUR D PANDYA
Chartered AccountantSweta Sureka
Chartered AccountantABHISHEK
Chartered AccountantP.R. KOTADIYA & ASSOCIATES
PartnerRole in project
BHAVYA DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 Dec 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 18 Nov 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 Apr 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 7 Apr 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Jan 2027

Documents filed48

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2025-2026)File: Form No 5 24 25.pdf27 Jun 2026
Withdrawal Update Form 1File: Form 1 March-26 Signed.pdf20 May 2026
Withdrawal Update Form 2File: FORM 2 - MARCH -2026.pdf20 May 2026
Withdrawal Update Form 3File: Form 3 20may26.pdf20 May 2026
Withdrawal Update Form 1File: Form 1 Dec-25.pdf30 Apr 2026
Withdrawal Update Form 2File: Form 2 Dec-25.pdf30 Apr 2026
Withdrawal Update Form 3File: FORM3 31DEC2025.pdf30 Apr 2026
Withdrawal Update Form 1File: Form 1 - Sep 2025.pdf26 Nov 2025
Withdrawal Update Form 2File: FORM 2.pdf26 Nov 2025
Withdrawal Update Form 3File: form 3 bhavya 30092025 dsc.pdf26 Nov 2025
Withdrawal Update Form 1File: FORM 1 - June 2025.pdf6 Nov 2025
Withdrawal Update Form 2File: FORM 2.pdf6 Nov 2025
Withdrawal Update Form 3File: FORM 3 CA BHAVYA 30 06 digital.pdf6 Nov 2025
Building plan approvalFile: Estrella Page 2_11zon.pdf25 Apr 2025
Building plan approvalFile: Page 3.pdf25 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: Estrella Page 2_11zon.pdf25 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: Page 3.pdf25 Apr 2025
Other - LegalFile: murgeddd_11zon.pdf25 Apr 2025
Details of encumbrances concerned to FinanceFile: Encumbrance letter - Finance (4).pdf7 Apr 2025
Details of encumbrances concerned to FinanceFile: 3 b Details of encumbrances concerned to Legal.pdf7 Apr 2025
Commencement Certificates / NA Order for plotted developmentFile: plinth submit letter (2).pdf7 Apr 2025
Details of encumbrances concerned to LegalFile: 3 b Details of encumbrances concerned to Legal.pdf7 Apr 2025
Details of encumbrances concerned to LegalFile: Encumbrance letter - Finance (4).pdf7 Apr 2025
Other - FinanceFile: Declaration Exemption of Opening Bank Acc Landowner- Estrella Villas.pdf7 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: final bhavya ca cert.pdf27 Jan 2025
CERSAI detailsFile: 3 SIGN UNDERTAKING FOR CERSAI BHAVYA LETTER.pdf27 Jan 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: 1 Disclosure of Interest in Other Real Estate Organizations (67).pdf27 Jan 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: 1 Declaration about all RERA Designated Bank Accounts (Format A) (28).pdf25 Jan 2025
Proforma of Agreement for saleFile: Agreement for Sale- Estrella Villas_BHAVYA DEVELOPERS_07042025.pdf25 Jan 2025
Declaration in FORM BFile: 9 FINAL FORM B.pdf7 Jan 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B- Bank.pdf7 Jan 2025
Copy of the legal title reportFile: RERA FORMAT (1).pdf25 Dec 2024
Other - TechnicalFile: 9 ANNEXURE A.pdf6 Dec 2024
Details of encumbrances concerned to FinanceFile: ENCUMBRANCES confirmation Letter .pdf20 Nov 2024
Proforma of Allotment letterFile: Allotment Letter- Estrella Villas_BHAVYA DEVELOPERS_07042025.pdf20 Nov 2024
Declaration about Commencement CertificateFile: DECLARATION About Commencement certificate.pdf20 Nov 2024
Deviation Report with respect to Allotment letterFile: Deviation Report -Allotment Letter-Estrella Villas.pdf20 Nov 2024
Details of encumbrances concerned to LegalFile: ENCUMBRANCES confirmation Letter .pdf20 Nov 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Report -AFS-Estrella Villas_11zon.pdf20 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Signed Form 2- Estrella Villas.pdf19 Nov 2024
Layout approvalFile: Estrella Page 1_11zon.pdf18 Nov 2024
Building plan approvalFile: Estrella Page 1_11zon.pdf18 Nov 2024
PAN CardFile: 1 pan card bhavya developers.pdf18 Nov 2024
Copy of Layout Approval (in case of layout)File: Estrella Page 1_11zon.pdf18 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Final Estrella.pdf18 Nov 2024
Commencement Certificates / NA Order for plotted developmentFile: Comencement Certificate_11zon.pdf18 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: Estrella Page 1_11zon.pdf18 Nov 2024
Disclosure for secured/unsecured finance availed for the projectFile: 12 DISCLOSURE FOR SECURED-UNSECURED FINANCE AVAILED FOR THE PROJECT.pdf18 Nov 2024

How this compares with Thane

18%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ESTRELLA VILLAS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near UTTAN7,600+ in Thane

2 kmESTRELLA VILLASLapsed / revoked 1Other 5Dot size: filed unitsN

Filed coordinates, straight-line distance. 6 registered projects within 2 km.

Builder: BHAVYA DEVELOPERS

BHAVYA DEVELOPERS has 1 registration on MahaRERA, including ESTRELLA VILLAS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if ESTRELLA VILLAS is delayed beyond 31 Jan 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ESTRELLA VILLAS?

The registered promoter entity is BHAVYA DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ESTRELLA VILLAS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ESTRELLA VILLAS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ESTRELLA VILLAS?

The professionals named in the filing: Architect: TEJ'S CONSULTANT; Architect: 1 STUDIO ARCH; Engineer: BASAVARAJ S GADEKAR; Engineer: M D PANDYA & ASSOCIATES MAYUR D PANDYA; Chartered Accountant: Sweta Sureka; Chartered Accountant: ABHISHEK. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ESTRELLA VILLAS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ESTRELLA VILLAS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ESTRELLA VILLAS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.