Home / Browse projects / Thane, Maharashtra / The Address By GS Tower B

Registered Litigation declared Residential / Group Housing project

The Address By GS Tower B

By Raymond Limited

RG-MH-34904 · RERA P51700045829 · Last updated on MahaRERA portal: 15 Jul 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 5 cases
  • 2 complaints at MahaRERA
  • Rs 200.00 crore secured on the land, in favour of Bank of Maharashtra
  • The declared charge does not appear in the CERSAI report on the filing

Clear

  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 6 completed earlier projects delivered on promise

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Mar 2028Possession promisedno revision filed
9 of 11Construction stages donefurthest along: Internal walls, 92%
3 of 271Units unsoldnot recorded sold or booked
2Complaints at MahaRERAon this registration
Jump to the 224 documents Report an error

The Address By GS Tower B is a Residential / Group Housing project by Raymond Limited in Thane, Maharashtra, registered with MahaRERA as P51700045829 on 15 Jun 2022. Possession is promised by 31 Mar 2028. 268 of the 271 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete. 2 complaints are on record with the regulator.

At a glance

Project

  • NameThe Address By GS Tower B
  • TypeResidential / Group Housing
  • Location
    • Pokhran Road
    • Thane (M Corp.)
    • Thane
    • 400606
  • Pincode400606
  • RERA no.P51700045829
  • ReraGenie IDRG-MH-34904

Builder

  • NameRaymond Limited
  • Entity typeCompany
  • Other registrations14 more →
  • Completed9 of 15
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects24 →

Key dates

this monthRegisteredJun 2022PromisedMar 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on15 Jun 2022
  • Promised completion31 Mar 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed224 files

Current status

99%268 of 271 units booked
98.3%Work done, per cost certificate

Figures as on 15 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
The Address By GS Tower BNA62552710271

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 15 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 92%.

The Address By GS Tower B: 98% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises92%
Sanitary Fittings within the flats / premises85%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 15 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes95%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes85%
Open ParkingYes90%

Parking filed18

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots18
Closed/Covered1
Open Space17

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area11,570 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofBank of Maharashtra
Secured amountRs 200.00 crore
CERSAI search filedYes
Declared on16 Jan 2026

Approvals and building plan

Sanctioning authorityThane Municipal Corporation
Permissible FSI55000.81
Proposed, not sanctioned27,697 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSSI Thane Branch
Estimated costRs 369.27 cr
Cost incurredRs 362.84 cr
Work done98.26%
BuildingWingEstimatedIncurred
The Address By GS Tower BNARs 246.37 crRs 242.64 cr
-NARs 122.90 crRs 120.20 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSpaceage Consultants
EngineerEpicons Consultants
EngineerAlok Kumar Hazari
Chartered AccountantNiraj Sanghavi & Associates
Chartered AccountantWalker Chandiok & Co LLP
PartnerRole in project
Raymond Limited-

Litigation declared5

CaseCourtStatus
158/2012High Court BombayPending
13/2016High Court BombayPending
57/2016High Court BombayPending
71/2017High Court BombayPending
158/2012High Court BombayOngoing

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC12601357Raymond LimitedJyoti Dipak Sawant12/03/2026
CC12604418Raymond LimitedDipak Dynandeo Sawant16/07/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 1 Jun 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 20 Jul 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 Jul 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 5 May 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2028

Documents filed224

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 224 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 RERA Premium Tower B.pdf15 Jul 2026
Withdrawal Update Form 2File: Form 2 RERA Premium Tower B.pdf15 Jul 2026
Withdrawal Update Form 3File: Form 3 RERA Premium Tower B.pdf15 Jul 2026
Form 2A (FY 2025-2026)File: TOWER B.pdf26 Jun 2026
Withdrawal Update Form 1File: Form 1 Address by GS T B.pdf23 Apr 2026
Withdrawal Update Form 2File: Form 2_The Address By GS T B.pdf23 Apr 2026
Withdrawal Update Form 3File: Form 3 The Address By GS Tower B.pdf23 Apr 2026
Withdrawal Update Form 1File: Form 1_Address By GS B.pdf24 Jan 2026
Withdrawal Update Form 2File: Form 2 GS B.pdf24 Jan 2026
Withdrawal Update Form 3File: Form 3_The Address By GS B.pdf24 Jan 2026
Form 1File: Form 1_The Address By GS_ Tower B_.pdf17 Oct 2025
Form 2File: Form 2_The Address by GS Tower B.pdf17 Oct 2025
Form 3File: Form 3_The Address By GS Tower B.pdf17 Oct 2025
Disclosure of Sold and Booked InventoryFile: Declaration Sold Unsold The Address By GS Tower B.pdf17 Oct 2025
Form 5 (FY 2024-2025)File: Address by GS_Tower B_Statement and Certificate.pdf28 Sep 2025
Form 1File: Form1 _GS Tower B june 25.pdf20 Jul 2025
Form 2File: Form 2 RERA - Premium Tower B.pdf20 Jul 2025
Form 3File: Form 3_PRM Tower B.pdf20 Jul 2025
Disclosure of Sold and Booked InventoryFile: sold list.pdf20 Jul 2025
Form 1File: Form 1 PRM Tower B.pdf20 Jul 2025
Form 2File: Form 2 RERA - Premium Tower B.pdf20 Jul 2025
Form 3File: RERA Form 3 - Premium Tower B - Certificate Number 24 signed.pdf20 Jul 2025
Disclosure of Sold and Booked InventoryFile: Address by GS tower B.pdf20 Jul 2025
Form 2A (FY 2024-2025)File: TOWER B.pdf17 Jul 2025
Disclosure of sold/ booked inventoryFile: Address by GS tower B.pdf24 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA Form 3 - Premium Tower B - Certificate Number 24 signed.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 RERA - Premium Tower B.pdf18 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 PRM Tower B.pdf17 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 TOWER B.pdf17 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Tower B.pdf17 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Tower B, Raymond The Address.pdf17 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf21 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA Form 3.pdf21 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf21 Feb 2025
Disclosure of sold/ booked inventoryFile: The Address by GS Tower B.pdf21 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 tower -B_250113_123336.pdf15 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA Form 3 - Premium Tower B- Certificate Number 264.pdf15 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Tower B 311224.pdf15 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Tower B 311024.pdf13 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA Form 3 - Tower B - Certificate Number 218.pdf13 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 RERA - Premium Tower B - 301024.pdf13 Nov 2024
Disclosure of sold/ booked inventoryFile: Address by GS Tower B.pdf24 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Tower B.pdf14 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed RERA Form 3 - Tower B - Certificate Number 184.pdf14 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA Form 2 - Tower B.pdf14 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Annexure 5-Form 1 -1 Address by GS Tower B.pdf9 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Annexure 4-Form 1 Address by GS Tower B.pdf9 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Annexure 17-RERA Form 3 -2 Address by GS Tower B - Certificate Number 160 Signed.pdf9 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Annexure 16-RERA Form 3 -1 Tower B - Certificate Number 131 signed.pdf9 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Annexure 15-Form2 -1 Address by GS Tower B.pdf9 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Annexure 9-Form 2 Address by GS tower B - 020924.pdf9 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Annexure-10, THE ADDRESS BY GS TOWER B.pdf7 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM2A.pdf16 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Tower B.pdf15 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA Form 3 - Tower B - Certificate Number 102 Save As.pdf15 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Address Tower B.pdf9 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 TOWER B.pdf12 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 RERA - Premium Tower B - 040624.pdf12 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Tower B 040624.pdf12 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Tower B Address by GS.pdf24 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1Add by GS Tower B.pdf14 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 RERA - Premium Tower B.pdf14 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Tower B Address by GS.pdf14 May 2024
Disclosure of sold/ booked inventoryFile: ADD BY GS TOWER B.pdf23 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Tower B Address by GS.pdf19 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: THE ADD BY GS TOWER B.pdf18 Apr 2024
CERSAI detailsFile: CERSAI_Search_Report_200304096476_For_Asset_Based_Search_17_04_2024_16_55_08_701.pdf18 Apr 2024
CERSAI detailsFile: CERSAI_Search_Report_200304096512_For_Asset_Based_Search_17_04_2024_16_55_34_699.pdf18 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Tower B Address.pdf8 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 RERA - Premium Tower B - 310324.pdf8 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Tower B.pdf7 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 RERA Premium Tower B.pdf7 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Add by GS Tower B.pdf7 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Tower B.pdf1 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Tower B.pdf1 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Tower B.pdf1 Mar 2024
Disclosure of sold/ booked inventoryFile: the address by GS Tower -B_240123_150039.pdf23 Jan 2024
CERSAI detailsFile: CERSAI_Search_Report_200293534612_For_Asset_Based_Search_15_01_2024_15_29_02_047.pdf16 Jan 2024
CERSAI detailsFile: CERSAI_Search_Report_200293534858_For_Asset_Based_Search_15_01_2024_15_30_39_700.pdf16 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Address by GS Tower B_240109_175348.pdf12 Jan 2024

Promoter's earlier projects7

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

6 delivered on promise1 under way, not due yet
ProjectLocationFlatsStatusPromisedDelivered
INVICTUS BY GSp5170005201265 132/2, Pokhran Road No 1, Village Panchpakhadi, Thane (M Corp.), Thane, Thane, 400606, MAHARASHTRA-OngoingOct 2028Not due yet
TEN X HABITAT RAYMOND REALTY TOWER JThane320OngoingDec 2024Oct 2024
TEN X HABITAT RAYMOND REALTY TOWER KThane318OngoingSep 2024Sep 2024
TEN X HABITAT RAYMOND REALTY TOWER EThane320OngoingSep 2024Sep 2024
TEN X HABITAT RAYMOND REALTY TOWER DThane244OngoingSep 2024Sep 2024
TEN X HABITAT RAYMOND REALTY TOWER CThane244CompletedMar 2024Mar 2024
TEN X HABITAT RAYMOND REALTY TOWER A and BThane638CompletedMar 2024Mar 2024

How this compares with Thane

99%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep The Address By GS Tower B on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near POKHRAN ROAD7,600+ in Thane

Builder: Raymond Limited

Raymond Limited has 15 registrations on MahaRERA, including TEN X HABITAT Raymond Realty | Tower A & B and TEN X HABITAT Raymond Realty Tower C. Its filings disclose 24 earlier MahaRERA projects: declares 19 of 19 past projects completed on time. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if The Address By GS Tower B is delayed beyond 31 Mar 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of The Address By GS Tower B?

The registered promoter entity is Raymond Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in The Address By GS Tower B?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against The Address By GS Tower B?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for The Address By GS Tower B?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at The Address By GS Tower B?

The professionals named in the filing: Architect: Spaceage Consultants; Engineer: Epicons Consultants; Engineer: Alok Kumar Hazari; Chartered Accountant: Niraj Sanghavi & Associates; Chartered Accountant: Walker Chandiok & Co LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in The Address By GS Tower B?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About The Address By GS Tower B. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save The Address By GS Tower B to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.