ReraGenieLog inGet a buyer report

Home / Browse projects / Raigarh, Maharashtra / THARWANI PALLADIAN

Registered No litigation declared Others project

THARWANI PALLADIAN

By THARWANI REALTORS

RG-MH-06040 · RERA P52000052621 · Last updated on MahaRERA portal: 9 Jun 2026

Source: official MahaRERA filing

Red flags

  • Possession 1 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Sep 2026Possession promised1 month past this date
4 of 11Construction stages donefurthest along: Staircases, 75%
60 of 163Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 98 documents Report an error

THARWANI PALLADIAN is a Others project by THARWANI REALTORS in Raigarh, Maharashtra, registered with MahaRERA as P52000052621 on 12 Sep 2023. Possession was promised by 30 Sep 2026 and is now 1 months past that date. 103 of the 163 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameTHARWANI PALLADIAN
  • TypeOthers
  • Location
    • Village Kharghar
    • Kharghar
    • Panvel
    • Raigarh
    • 410210
  • Pincode410210
  • RERA no.P52000052621
  • ReraGenie IDRG-MH-06040

Builder

  • NameTHARWANI REALTORS
  • Entity typePartnership
  • PartnersAbhishek Anil Tharwani, Dhiren Anil Tharwani
  • Other registrations6 more →
  • Completed1 of 7
  • No longer live2 lapsed, de-registered or revoked
  • Past their filed date1
  • Declared earlier projects7 →

Key dates

1 months past promisethis monthRegisteredSep 2023PromisedSep 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on12 Sep 2023
  • Promised completion30 Sep 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed98 files

Current status

63%103 of 163 units booked
42.0%Work done, per cost certificate

Figures as on 9 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
THARWANI PALLADIANNA27014023163

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 9 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 75%.

THARWANI PALLADIAN: 62% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises5%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks75%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.60%

Progress on shared amenities15

As on 9 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes60%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed32

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots32
Closed/Covered32

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,436 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI15660.51
Proposed, not sanctioned13,638 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKhadakpada Taluka Kalyan Dist thane
Estimated costRs 58.00 cr
Cost incurredRs 24.37 cr
Work done42.02%
BuildingWingEstimatedIncurred
THARWANI PALLADIANNARs 46.40 crRs 24.37 cr
-NARs 11.60 cr-

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRAJESH RC ARCHITECT
EngineerKIRAN SHARAD WARE
Chartered AccountantSUNNY BHAGIA AND ASSOCIATES CHARTERED ACCOUNTANTS
Chartered AccountantVINOD SANTOSHKUMAR DHANKANI
PartnerRole in project
THARWANI REALTORS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 12 Jun 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 12 Apr 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 14 Jun 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 Apr 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed98

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 98 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Signed_Palladian_Form - 1 (12th issue) (31-03-2026).pdf9 Jun 2026
Withdrawal Update Form 2File: Form 2_Palladian.pdf9 Jun 2026
Withdrawal Update Form 3File: Final Form 3 Palladian_March 2026.pdf9 Jun 2026
Form 2A (FY 2025-2026)File: PALLADIAN SIGNED FORM 2A.pdf23 Apr 2026
Withdrawal Update Form 1File: Form 1 Palladian_Sep 2025.pdf24 Jan 2026
Withdrawal Update Form 1File: Form 1_Palladian Dec 2025.pdf24 Jan 2026
Withdrawal Update Form 2File: Form 2_Palladian Sep 25.pdf24 Jan 2026
Withdrawal Update Form 2File: Form 2 of Palladian Dec.pdf24 Jan 2026
Withdrawal Update Form 3File: Final Form 3_Tharwani Palladian Sep 2025.pdf24 Jan 2026
Withdrawal Update Form 3File: Final Form 3 Palladian_December 2025.pdf24 Jan 2026
Form 1File: Tharwani Palladian form 1 30-09-2023.pdf2 Jan 2026
Form 2File: Tharwani Palldian Form 2.pdf2 Jan 2026
Form 3File: Form 3 Palladian Sep 2023_SignedwithUDIN.pdf2 Jan 2026
Disclosure of Sold and Booked InventoryFile: Form 3 Palladian Sep 2023_SignedwithUDIN.pdf2 Jan 2026
Form 1File: THARWANI PALLADIAN FORM 1.pdf2 Jan 2026
Form 2File: Form 2 Tharwani Palladian.pdf2 Jan 2026
Form 3File: Form 3 Palladian-Dec 2023_Final.pdf2 Jan 2026
Disclosure of Sold and Booked InventoryFile: Form 3 Palladian-Dec 2023_Final.pdf2 Jan 2026
Form 1File: Form1_Palladian_Apr24.pdf2 Jan 2026
Form 2File: Form 2_Palladian_Apr24.pdf2 Jan 2026
Form 3File: Form 3 Palladian_Apr24_Final.pdf2 Jan 2026
Disclosure of Sold and Booked InventoryFile: Form 3 Palladian_Apr24_Final.pdf2 Jan 2026
Form 1File: FORM 1 THARAWANI PALLADIAN.pdf2 Jan 2026
Form 2File: Form 2_ Palladian_June 2024.pdf2 Jan 2026
Form 3File: Final Form 3_Tharwani Palladian June 2024 Scanned.pdf2 Jan 2026
Disclosure of Sold and Booked InventoryFile: Final Form 3_Tharwani Palladian June 2024 Scanned.pdf2 Jan 2026
Form 1File: Form 1_Tharwani palladian.pdf2 Jan 2026
Form 2File: Form 2_Palladian_Sept 2024.pdf2 Jan 2026
Form 3File: Final Form 3_Palladian_Sep 2024.pdf2 Jan 2026
Disclosure of Sold and Booked InventoryFile: Final Form 3_Palladian_Sep 2024.pdf2 Jan 2026
Form 1File: Form 1_Palladian Dec 2024.pdf2 Jan 2026
Form 2File: Form 2_Palladian_31-12-2024.pdf2 Jan 2026
Form 3File: Form 3 Palladian-Dec 2024_Final30042025_withDSC.pdf2 Jan 2026
Disclosure of Sold and Booked InventoryFile: Form 3 Palladian-Dec 2024_Final30042025_withDSC.pdf2 Jan 2026
Form 2A (FY 2023-2024)File: Form 2A- Palladian.pdf2 Jan 2026
Form 2A (FY 2024-2025)File: Form 2A_Palladian_2024-25.pdf2 Jan 2026
Form 5 (FY 2023-2024)File: Form 5_Final on letterhead scanned.pdf2 Jan 2026
Withdrawal Update Form 1File: Palladian Form 1_June 2025.pdf26 Nov 2025
Withdrawal Update Form 2File: Form 2_Palladian June 2025.pdf26 Nov 2025
Withdrawal Update Form 3File: Final Form 3 Palladian_June 2025.pdf26 Nov 2025
Form 5 (FY 2024-2025)File: Final Form 5_Tharwani Palladian 2024-25.pdf3 Oct 2025
Form 1File: Form I_Palladian.pdf3 Jun 2025
Form 2File: Form 2 Palladian.pdf3 Jun 2025
Form 3File: FORM 3_Palladian_March 2025_Scanned Copy_compressed.pdf3 Jun 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Palladian_31-12-2024.pdf13 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Scanned Final Form 3-Dec 2024.pdf2 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Palladian.pdf26 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Palladian Dec 2024.pdf25 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Palladian_Sept 2024.pdf18 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed Final Form 3_Palladian_Sep 2024_compressed.pdf10 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_ Palladian_June 2024.pdf31 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final Form 3_Tharwani Palladian June 2024 Scanned_compressed.pdf4 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Tharwani palladian.pdf29 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Final Form 5_Palladian 202324.pdf29 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 THARAWANI PALLADIAN.pdf29 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A- Palladian.pdf18 Jun 2024
Layout approvalFile: Revised Building Plan_compressed.pdf12 Apr 2024
Copy of Layout Approval (in case of layout)File: Revised Building Plan_compressed.pdf12 Apr 2024
Commencement Certificates / NA Order for plotted developmentFile: Amended Commencement Certificate.pdf12 Apr 2024
Declaration about Commencement CertificateFile: Declaration about CC.pdf12 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1_Palladian_Apr24.pdf12 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Palladian_Apr24.pdf12 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Palladian_Apr24.pdf11 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Palladian_Apr24_Final.pdf11 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Tharwani Palladian.pdf26 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Palladian-Dec 2023_Final.pdf13 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: THARWANI PALLADIAN FORM 1.pdf29 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Tharwani Palladian form 1 30-09-2023.pdf19 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Tharwani Palldian Form 2.pdf19 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Palladian Sep 2023_SignedwithUDIN.pdf19 Jan 2024
Deviation Report with respect to model copy of AgreementFile: DEVIATION REPORT 18-8-2023.pdf28 Jul 2023
Status of ConveyanceFile: Status of Conveyance_compressed.pdf22 Jul 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Tharwani realtors(3).pdf21 Jul 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Tharwani Realtors (1).pdf19 Jul 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Tharwani realtors(2).pdf19 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf12 Jul 2023
Proforma of Agreement for saleFile: Flat sale-Tharwani-RERA-1087.pdf11 Jul 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Separate Bank Account details including no encumbrances.pdf21 Jun 2023
Layout approvalFile: layout.pdf14 Jun 2023
Building plan approvalFile: Commencement Certificates.pdf14 Jun 2023

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
THARWANI ARIANA PHASE ISURVEY NO 133 1 AND SURVEY NO 133 P VILLAGE CHIKHLOLI TALUKA AMBERNATH238CompletedDec 2019Dec 2016
RIVERDALE VISTAS. N 25 H N 1 VILLAGE BARAVE TALUKA KALYAN188CompletedSep 2016Late, Sep 2019
ROSEWOOD HEIGHTSPLOT NO 270 SECTOR 10 KHARGHAR NAVI MUMABI234CompletedMar 2012Mar 2012

How this compares with Raigarh

63%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep THARWANI PALLADIAN on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Village Kharghar5,900+ in Raigarh

Builder: THARWANI REALTORS

THARWANI REALTORS has 7 registrations on MahaRERA, including THARWANI MILLENNIUM CITY PHASE I and THARWANI MILLENNIUM CITY PHASE II. Its filings disclose 7 earlier MahaRERA projects: declares 6 of 7 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if THARWANI PALLADIAN is delayed beyond 30 Sep 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of THARWANI PALLADIAN?

The registered promoter entity is THARWANI REALTORS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in THARWANI PALLADIAN?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for THARWANI PALLADIAN?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at THARWANI PALLADIAN?

The professionals named in the filing: Architect: RAJESH RC ARCHITECT; Engineer: KIRAN SHARAD WARE; Chartered Accountant: SUNNY BHAGIA AND ASSOCIATES CHARTERED ACCOUNTANTS; Chartered Accountant: VINOD SANTOSHKUMAR DHANKANI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in THARWANI PALLADIAN?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About THARWANI PALLADIAN. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save THARWANI PALLADIAN to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.