Home / Browse projects / Palghar, Maharashtra / THAKUR DHAM BUILDING NO 1 TYPE B 1

Registered No litigation declared Residential / Group Housing project

THAKUR DHAM BUILDING NO 1 TYPE B 1

By THAKUR SHREE DEVELOPERS

RG-MH-18267 · RERA P99000056461 · Last updated on MahaRERA portal: 13 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Dec 2034Possession promisedno revision filed
3 of 11Construction stages donefurthest along: Slabs of Super Structure, 85%
34 of 66Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 65 documents Report an error

THAKUR DHAM BUILDING NO 1 TYPE B 1 is a Residential / Group Housing project by THAKUR SHREE DEVELOPERS in Palghar, Maharashtra, registered with MahaRERA as P99000056461 on 5 Jun 2024. Possession is promised by 31 Dec 2034. 32 of the 66 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameTHAKUR DHAM BUILDING NO 1 TYPE B 1
  • TypeResidential / Group Housing
  • Location
    • BOISAR TARAPUR ROAD
    • BOISAR
    • pasthal
    • Palghar
    • 401501
  • Pincode401501
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000056461
  • ReraGenie IDRG-MH-18267

Builder

  • NameTHAKUR SHREE DEVELOPERS
  • Entity typeOthers
  • Named personAJIT SHIVKUMAR SINGH

Key dates

this monthRegisteredJun 2024PromisedDec 2034

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on5 Jun 2024
  • Promised completion31 Dec 2034
  • Revised completionNone
  • Buildings1 building record
  • Documents filed65 files

Current status

48%32 of 66 units booked
63.0%Work done, per cost certificate

Figures as on 13 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING NO 1 TYPE B-1NA7666066

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 13 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 85%.

BUILDING NO 1 TYPE B-1: 39% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure85%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks40%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 13 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed39

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots39
Closed/Covered9
Open Space30

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,046 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
RAJDHARA INFRASTRUCTURES LLPPalghar Palghar

Approvals and building plan

Sanctioning authorityCOLLECTOR OFFICE PALGHAR
Permissible FSI2147.88
Proposed, not sanctioned2,148 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchOLD UMA VILLA GROUND FLOOR MAHIM ROAD PANCH BATTI NAKA PALGHAR WEST 401404
Estimated costRs 5.39 cr
Cost incurredRs 3.39 cr
Work done63.0%
BuildingWingEstimatedIncurred
BUILDING NO 1 TYPE B-1NARs 4.85 crRs 3.39 cr
-NARs 53.87 lakh-

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVASTU SHILP
EngineerSHAH AND ASSOCIATES
Chartered AccountantCHIRAG K JAIN & CO
Chartered AccountantCHIRAG K JAIN & CO.
Chartered AccountantAJAY SHUKLA & ASSCOIATES
PartnerRole in project
THAKUR SHREE DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 3 May 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 3 May 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 3 May 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 31 May 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2034

Documents filed65

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form-1 March 2026 (3).pdf13 Jun 2026
Withdrawal Update Form 2File: Form-2 March 2026 (3).pdf13 Jun 2026
Withdrawal Update Form 3File: Form-3 march 2026 (2).pdf13 Jun 2026
Withdrawal Update Form 1File: FROM 1 THAKUR SHREE (1).pdf21 Mar 2026
Withdrawal Update Form 2File: FROM 2.pdf21 Mar 2026
Withdrawal Update Form 3File: Form-3.pdf21 Mar 2026
Withdrawal Update Form 1File: Form-1.pdf26 Nov 2025
Withdrawal Update Form 2File: Form-2.pdf26 Nov 2025
Withdrawal Update Form 3File: Form-3.pdf26 Nov 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30 june.pdf30 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30 sep.pdf30 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 31st dec.pdf30 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 31 march.pdf30 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE MARCH 2025.pdf21 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FROM - 3 CA 3RD(aPRIL-jUNE 2024).pdf3 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FROM - 3 CA 1ST(jULY-SEP 2024).pdf3 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FROM - 3 CA 4TH(Oct-Dec 2024).pdf3 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FROM - 3 CA 2ND(Jan-March 2025).pdf3 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FROM - 2 ENGIN 30 JUNE -24.pdf2 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FROM - 2 ENGIN 31 MARCH 25.pdf2 Apr 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD 31 MARCH 2025.pdf2 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FROM 1 30 JUNE 2024.pdf28 Mar 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD 30 JUNE 2024.pdf28 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Shree-FROM - 1 Architech Certificate 30 SEP 24.pdf27 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Shree- FROM - 1Architecht Certificate -30 dec 24.pdf27 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FROM 2 ENGIN 30 SEP 24.pdf27 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FROM 2 ENGIN 30 DEC 24.pdf27 Mar 2025
Disclosure of sold/ booked inventoryFile: REVISED SOLD UNSOLD27032025.pdf27 Mar 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD UPTO 30-09-2024.pdf27 Mar 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD 31-12-2024.pdf27 Mar 2025
Disclosure of sold/ booked inventoryFile: 1 Disclosure of sold_ booked inventory.pdf27 Mar 2025
Commencement Certificates / NA Order for plotted developmentFile: Gmail - CC Issued by collector Palghar At Village Pasthal Tal Palghar Order DAte 15 June 231 May 2024
Proforma of Agreement for saleFile: 1 Proforma of Agreement for sale final thakur.pdf31 May 2024
Other - TechnicalFile: Gmail - CC Issued by collector Palghar At Village Pasthal Tal Palghar Order DAte 15 June 231 May 2024
PAN CardFile: Upload Agreement _ MoU Copy (12).pdf24 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 THDC.pdf24 May 2024
Other - FinanceFile: Declarations.pdf24 May 2024
Other - TechnicalFile: Annexure A (2).pdf24 May 2024
Commencement Certificates / NA Order for plotted developmentFile: Appendix F signed.pdf22 May 2024
Other - TechnicalFile: Appendix F signed.pdf22 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: fORM-2 tHAKUR DHAM NEW.pdf14 May 2024
Other - TechnicalFile: Declaration-plot area.pdf14 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Thakur Dham_compressed.pdf4 May 2024
Other - TechnicalFile: PLINTH ARCHITICT CERTIF-6.pdf4 May 2024
Other - TechnicalFile: Thakur Dham Plinth photo-1.pdf4 May 2024
Other - TechnicalFile: Thakur Dham Plinth photo-4.pdf4 May 2024
Layout approvalFile: LAYOUT PLAN THAKUR DHAM 91_compressed.pdf3 May 2024
Building plan approvalFile: B1 BLUE PRINT APPROVAL PLANE_compressed.pdf3 May 2024
Copy of the legal title reportFile: LEGAL TITTLE SEARCH REPORT THAKUR DHAM_compressed.pdf3 May 2024
Details of encumbrances concerned to FinanceFile: Declaration FINANCE.pdf3 May 2024
Details of encumbrances concerned to FinanceFile: Declaration legal.pdf3 May 2024
Details of encumbrances concerned to LegalFile: Declaration FINANCE.pdf3 May 2024
Details of encumbrances concerned to LegalFile: Declaration legal.pdf3 May 2024
Copy of Layout Approval (in case of layout)File: LAYOUT PLAN THAKUR DHAM 91_compressed.pdf3 May 2024
Building Plan Approval / NA Order for plotted developmentFile: B1 BLUE PRINT APPROVAL PLANE_compressed.pdf3 May 2024
Commencement Certificates / NA Order for plotted developmentFile: NA AND CC THAKUR DHAM_compressed.pdf3 May 2024
Declaration about Commencement CertificateFile: Declaration About Commencement Certificate.pdf3 May 2024
Declaration in FORM BFile: Form-B Developer.pdf3 May 2024
CERSAI detailsFile: Declaration cersai.pdf3 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: disclousre of interest.pdf3 May 2024
Proforma of Allotment letterFile: Annexure I-1.pdf3 May 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A.pdf3 May 2024
Deviation Report with respect to Allotment letterFile: Deviation Report DAL.pdf3 May 2024
Deviation Report with respect to model copy of AgreementFile: Deviation dsa.pdf3 May 2024
PAN CardFile: pan card.pdf1 May 2024

How this compares with Palghar

48%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one has not
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep THAKUR DHAM BUILDING NO 1 TYPE B 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BOISAR3,200+ in Palghar

2 kmTHAKUR DHAM BUILDING NO Completed 8Lapsed / revoked 14Other 11Dot size: filed unitsN

Filed coordinates, straight-line distance. 33 registered projects within 2 km.

Builder: THAKUR SHREE DEVELOPERS

THAKUR SHREE DEVELOPERS has 1 registration on MahaRERA, including THAKUR DHAM BUILDING NO 1 TYPE B 1. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if THAKUR DHAM BUILDING NO 1 TYPE B 1 is delayed beyond 31 Dec 2034?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of THAKUR DHAM BUILDING NO 1 TYPE B 1?

The registered promoter entity is THAKUR SHREE DEVELOPERS, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in THAKUR DHAM BUILDING NO 1 TYPE B 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for THAKUR DHAM BUILDING NO 1 TYPE B 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at THAKUR DHAM BUILDING NO 1 TYPE B 1?

The professionals named in the filing: Architect: VASTU SHILP; Engineer: SHAH AND ASSOCIATES; Chartered Accountant: CHIRAG K JAIN & CO; Chartered Accountant: CHIRAG K JAIN & CO.; Chartered Accountant: AJAY SHUKLA & ASSCOIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in THAKUR DHAM BUILDING NO 1 TYPE B 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About THAKUR DHAM BUILDING NO 1 TYPE B 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save THAKUR DHAM BUILDING NO 1 TYPE B 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.