Completed No litigation declared Residential / Group Housing project

TEN X HABITAT Raymond Realty Tower C

By Raymond Limited

RG-MH-03004 · RERA P51700020256 · Last updated on MahaRERA portal: 30 Sep 2023

Source: official MahaRERA filing

Red flags

  • 3 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 1 completed earlier projects delivered on promise

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Mar 2025Possession promisedregistration recorded completed
5 of 11Construction stages donefurthest along: Internal walls, 77%
3Complaints at MahaRERAon this registration
Jump to the 107 documents Report an error

TEN X HABITAT Raymond Realty Tower C is a Residential / Group Housing project by Raymond Limited in Thane, Maharashtra, registered with MahaRERA as P51700020256 on 29 Mar 2019. The registration is recorded completed; possession was promised by 30 Mar 2025. 3 complaints are on record with the regulator.

At a glance

Project

  • NameTEN X HABITAT Raymond Realty Tower C
  • TypeResidential / Group Housing
  • Location
    • Pokhran Road
    • J K Gram
    • Thane (M Corp.)
    • Thane
    • 400606
  • Pincode400606
  • RERA no.P51700020256
  • ReraGenie IDRG-MH-03004

Builder

  • NameRaymond Limited
  • Entity typeCompany
  • DirectorHarmohan Harminder Sahni
  • Other registrations14 more →
  • Completed9 of 15
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects24 →

Key dates

this monthRegisteredMar 2019PromisedMar 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on29 Mar 2019
  • Promised completion30 Mar 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed107 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Tower CNA440000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 30 Sep 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 77%.

Tower C: 52% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises77%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 30 Sep 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyNoNot applicable
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area990 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI15440.41
Proposed, not sanctioned15,440 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchFort, Mumbai - 400001

Certifying professionals and partners

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

PartnerRole in project
Raymond Limited-

Litigation declared10

CaseCourtStatus
577/2016Maharashtra Revenue Tribunal Mumbai against RLPending
158/2012Bombay High Court against RLPending
13/2016Bombay High Court against RLPending
57/2016Bombay High Court against RLPending
71/2017Bombay High Court against RLPending
997/2019Civil Judge Senior Division Thane against RLBy Order dt Eleventh Feb Twenty Twenty Preventive Injunction Application against RL stands Rejected
34/2020District Court Thane against RLArgument on rejecting of Preventive Injunction Application by order of the trial court
315/2020District Court ThanePending
2358/2020High Court BombayImpunged Order dt Twenty First March Twenty Twenty has been stayed by the High Court till next date
10028/2021Sub Division Office ThanePending

Complaints filed with MahaRERA3

Case no.ComplainantRespondentFiled
CC006000000110777Mr. Mahesh Mohan RanadeRaymond Limited01/09/2019
CC006000000221000Raymond LimitedJoyti V. Madabusi & Anr02/05/2022
CC006000000198878Mrs. Preeti Santosh DwivediRaymond Limited30/10/2021

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Jan 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Mar 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 Mar 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 9 Sep 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 4 Apr 2023

Documents filed107

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 107 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Tower C C.pdf30 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: TENX Tower C Form2A.pdf30 May 2023
Architect’s Certificate on Completion of Project (Form 4)File: Tower C May.pdf26 May 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC.pdf4 Apr 2023
Details of encumbrancesFile: ENCUMBRANCE CERTIFICATE.pdf23 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 RERA - Tower C -2020 11 17.pdf2 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 RERA - Tower C -2021 01 18.pdf2 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 RERA - Tower C -2021 03 08.pdf2 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 RERA - Tower C -2021 04 15.pdf2 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 RERA - Tower C -2020 08 25-Revised.pdf2 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 RERA - Tower C -2020 11 20.pdf2 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 RERA - Tower C -2021 01 21.pdf2 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 RERA - Tower C -2021 03 25.pdf2 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 RERA - Tower C -2021 04 21.pdf2 Feb 2023
Certificates of CA (Form 3)File: Form 3 RERA - Tower C - 2020 08 25.pdf2 Feb 2023
Certificates of CA (Form 3)File: Form 3 RERA - Tower C -2021 01 27.pdf2 Feb 2023
Certificates of CA (Form 3)File: Form 3 RERA - Tower C -2021 01 27.pdf2 Feb 2023
Certificates of CA (Form 3)File: Form 3 RERA - Tower C -2021 03 25.pdf2 Feb 2023
Certificates of CA (Form 3)File: Form 3 RERA - Tower C -2021 04 30 - Revised.pdf2 Feb 2023
Certificates of CA (Form 3)File: RERA Form 3 - Tower C - Withdrawal 07-12-2020.pdf2 Feb 2023
Form 2AFile: Form2A.pdf10 Oct 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1.pdf7 Oct 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form2.pdf7 Oct 2022
Certificates of CA (Form 3)File: form3.pdf7 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Tower C_4.pdf30 Sep 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf21 Sep 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Tower C.pdf21 Sep 2022
Certificates of CA (Form 3)File: form 3.pdf21 Sep 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Signed Form 1 _ Tower C.pdf26 Aug 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA Form 2 - Tower C-compressed.pdf26 Aug 2022
Certificates of CA (Form 3)File: Form 3 Tower C.pdf26 Aug 2022
Details of encumbrancesFile: Declaration.pdf25 Jul 2022
Form 2AFile: FORM 2A.pdf12 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Tower C_.pdf8 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Tower C.pdf8 Jul 2022
Certificates of CA (Form 3)File: Form 3 Tower C.pdf8 Jul 2022
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD TOWER C.pdf8 Apr 2022
OtherFile: TOWER C.pdf8 Apr 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Tower C.pdf25 Mar 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Tower C.pdf25 Mar 2022
Certificates of CA (Form 3)File: Form 3 Tower C.pdf25 Mar 2022
Copy of the legal title reportFile: Title Report Maharera.pdf31 Jan 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Tower C - Dec.pdf22 Dec 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Tower C.PDF22 Dec 2021
Form 2AFile: C.pdf22 Dec 2021
CERSAI detailsFile: CERSAI REPORT DEC 2021.pdf22 Dec 2021
Disclosure of sold/ booked inventoryFile: Tower C.pdf22 Dec 2021
Certificates of CA (Form 3)File: Tower C.pdf22 Dec 2021
CERSAI detailsFile: CERSAI REPORT DEC 2021.pdf15 Dec 2021
Certificates of CA (Form 3)File: Tower C.pdf14 Dec 2021
OtherFile: Tower C.pdf4 Oct 2021
Disclosure of sold/ booked inventoryFile: Tower C.pdf30 Sep 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Tower C.pdf30 Sep 2021
OtherFile: CERSAI Report.pdf30 Sep 2021
Form 2AFile: Tower C.pdf29 Sep 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 RERA - Tower C 2021 09 02_compressed.pdf24 Sep 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 RERA - Tower C.pdf24 Sep 2021
Certificates of CA (Form 3)File: RERA Form 3 Tower C.pdf24 Sep 2021
Commencement Certificates / NA Order for plotted developmentFile: CC 14th August 2021.pdf9 Sep 2021
OtherFile: Decleration on CC 140821.pdf9 Sep 2021
OtherFile: CERSAI REPORT.pdf24 Aug 2021
OtherFile: Cersai Decleration Tower C.pdf13 Aug 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 RERA - Tower C -2021 07 01_compressed.pdf11 Aug 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 RERA - Tower C -2021 07 06.pdf11 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Tower C.pdf11 Aug 2021
Certificates of CA (Form 3)File: Form 3 RERA - Tower C -2021 07 12.pdf11 Aug 2021
OtherFile: Tower C.pdf11 Aug 2021
Disclosure of sold/ booked inventoryFile: Tower C.pdf10 Aug 2021
Declaration about Commencement CertificateFile: Tower C.pdf30 Jul 2021
Form 2AFile: Form 2A Tower C.pdf29 Jul 2021
OtherFile: Decleration Tower C.pdf15 Jun 2021
Disclosure of sold/ booked inventoryFile: Tower C.pdf3 May 2021
Form 2AFile: Tower C.PDF22 Apr 2021
Certificates of CA (Form 3)File: Tower C.pdf30 Mar 2021
Form 2AFile: FORM 2A 2.pdf27 Jan 2021
Status of Formation of Legal Entity (Society/Co Op etc.)File: Tower C.pdf22 Jan 2021
Annual Audit Report of Statutory CA (Form 5)File: Raymond Rera certificate - Ten X C_compressed.pdf30 Sep 2020
Details of Restarting of Construction work post lockdownFile: Tower C.pdf2 Sep 2020
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA CERTIFICATE TOWER C-1.pdf28 Aug 2020
Form 2AFile: Form 2A-Tower C.pdf28 Aug 2020

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise1 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
The Address by GS Tower EP51700077861Thane, Thane144Nov 2024OngoingMar 2030Not due yet
Raymond Realty Phase IJ K Gram Pokhran Road Thane - 400606638-CompletedMar 2024Mar 2024

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep TEN X HABITAT Raymond Realty Tower C on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near J K Gram7,600+ in Thane

Builder: Raymond Limited

Raymond Limited has 15 registrations on MahaRERA, including TEN X HABITAT Raymond Realty | Tower A & B and TEN X HABITAT Raymond Realty Tower C. Its filings disclose 24 earlier MahaRERA projects: declares 19 of 19 past projects completed on time. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if TEN X HABITAT Raymond Realty Tower C is delayed beyond 30 Mar 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of TEN X HABITAT Raymond Realty Tower C?

The registered promoter entity is Raymond Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in TEN X HABITAT Raymond Realty Tower C?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against TEN X HABITAT Raymond Realty Tower C?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for TEN X HABITAT Raymond Realty Tower C?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

What should I check before booking in TEN X HABITAT Raymond Realty Tower C?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About TEN X HABITAT Raymond Realty Tower C. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save TEN X HABITAT Raymond Realty Tower C to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.