Home / Browse projects / Sindhudurg, Maharashtra / TARANGAN B WING
TARANGAN B WING
By CONSORTEXE PROPERTIES PVT LTD
RG-MH-07667 · RERA P52900076691 · Last updated on MahaRERA portal: 29 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 4 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Sindhudurg registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
TARANGAN B WING is a Residential / Group Housing project by CONSORTEXE PROPERTIES PVT LTD in Sindhudurg, Maharashtra, registered with MahaRERA as P52900076691 on 20 Jun 2024. Possession is promised by 31 Dec 2026. 10 of the 10 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.
At a glance
Project
- NameTARANGAN B WING
- TypeResidential / Group Housing
- Location
- SANGIRDE WADI ROAD
- SANGIRDE KUDAL
- Sangirde
- Kudal
- Sindhudurg
- 416520
- Pincode416520
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52900076691
- ReraGenie IDRG-MH-07667
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on20 Jun 2024
- Promised completion31 Dec 2026
- Revised completionNone
- Buildings1 building record
- Documents filed95 files
Current status
Figures as on 29 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| TARANGAN B WING | NA | 5 | 5 | 10 | 0 | 10 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 29 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
3 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 90%.
TARANGAN B WING: 61% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 90% |
| Sanitary Fittings within the flats / premises | 70% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 90% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 90% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 30% |
Progress on shared amenities15
As on 29 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 50% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 70% |
| Storm Water Drains | Yes | 70% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed8
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| SATERI DEVELOPERS | Thane (M Corp.) | Thane |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| TARANGAN B WING | NA | Rs 1.40 cr | Rs 1.28 cr |
| - | NA | Rs 25.02 lakh | Rs 6.50 lakh |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SWARUP MAYEKAR Mayekar |
| Engineer | RUPESH TAWATE |
| Engineer | Vinayak Suresh Nawar |
| Chartered Accountant | D R KEVAT & ASSOCIATES |
| Chartered Accountant | Kapure & Kapure |
| Partner | Role in project |
|---|---|
| CONSORTEXE PROPERTIES PVT LTD | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 15 Feb 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 19 Feb 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 13 Feb 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 13 Feb 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2026
Documents filed95
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 95 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2025-2026)File: Form 2A - 31 March 2026 Tarangan.PDF | 29 Jun 2026 |
| Withdrawal Update Form 1File: Form 1 - Tarangan - March 26.PDF | 24 Apr 2026 |
| Withdrawal Update Form 2File: Form 2 - Tarangan - March 26.PDF | 24 Apr 2026 |
| Withdrawal Update Form 3File: Form 3 - Tarangan - March 26.PDF | 24 Apr 2026 |
| Withdrawal Update Form 1File: Form 1 - Tarangan - Dec 25.PDF | 28 Feb 2026 |
| Withdrawal Update Form 2File: Form 2 - Tarangan - Dec 25.PDF | 28 Feb 2026 |
| Withdrawal Update Form 3File: Form 3 - Tarangan - Dec 25.PDF | 28 Feb 2026 |
| Withdrawal Update Form 1File: Form 1 - Tarangan - Sept 25.PDF | 1 Dec 2025 |
| Withdrawal Update Form 2File: Form 2 - Tarangan - Sept 25.PDF | 1 Dec 2025 |
| Withdrawal Update Form 3File: Form 3 - Tarangan - Sept 25.PDF | 1 Dec 2025 |
| Form 1File: Form 1 - Arch cert June 24.PDF | 19 Aug 2025 |
| Form 2File: Form 2 - June 24.PDF | 19 Aug 2025 |
| Form 3File: Form 3 - CA Certificate June 24.PDF | 19 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Discolsure of Inventory June 2024.PDF | 19 Aug 2025 |
| Form 1File: Form 1 - Arch cert Sept 24.PDF | 19 Aug 2025 |
| Form 2File: Form 2 - Sept 24.PDF | 19 Aug 2025 |
| Form 3File: Form 3 - CA Certificate Sept 24.PDF | 19 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Discolsure of Inventory Sept2024.PDF | 19 Aug 2025 |
| Form 1File: Form 1 - Arch cert Dec 24.PDF | 19 Aug 2025 |
| Form 2File: Form 2 - Dec 24.PDF | 19 Aug 2025 |
| Form 3File: Form 3 - CA Certificate Dec 24.PDF | 19 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Discolsure of Inventory Dec 2024.PDF | 19 Aug 2025 |
| Withdrawal Update Form 1File: Form 1 Architect Certificate - June 25.PDF | 19 Aug 2025 |
| Withdrawal Update Form 2File: Form 2 - June 2025 - Final.PDF | 19 Aug 2025 |
| Withdrawal Update Form 3File: Form 3 - CA Certificate June 25.PDF | 19 Aug 2025 |
| Form 1File: Form 1 - Arch cert Mar 25.PDF | 21 Jun 2025 |
| Form 2File: Form 2 - Mar 25.PDF | 21 Jun 2025 |
| Form 3File: Form 3 - CA Certificate March 25.PDF | 21 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Discolsure of Inventory Mar 2025.PDF | 21 Jun 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Arch cert June 24.PDF | 16 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Arch cert Sept 24.PDF | 16 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Arch cert Dec 24.PDF | 16 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Arch cert Mar 25.PDF | 16 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - CA Certificate June 24.PDF | 16 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - CA Certificate Sept 24.PDF | 16 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - CA Certificate Dec 24.PDF | 16 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - CA Certificate March 25.PDF | 16 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - June 24.PDF | 16 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Sept 24.PDF | 16 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Dec 24.PDF | 16 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Mar 25.PDF | 16 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Discolsure of Inventory June 2024.PDF | 16 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Discolsure of Inventory Sept2024.PDF | 16 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Discolsure of Inventory Dec 2024.PDF | 16 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Discolsure of Inventory Mar 2025.PDF | 16 Apr 2025 |
| Details of encumbrances concerned to FinanceFile: Declaration about legal encumbra.PDF | 8 May 2024 |
| Details of encumbrances concerned to LegalFile: Declaration about legal encumbra.PDF | 8 May 2024 |
| Other - LegalFile: POV Sateri to CPPL Compressed.pdf | 15 Apr 2024 |
| Other - LegalFile: 7- 12 .PDF | 12 Apr 2024 |
| Other - LegalFile: Mutation entries 76B4-5.pdf | 12 Apr 2024 |
| Other - LegalFile: NA Order with plan.pdf | 12 Apr 2024 |
| Other - LegalFile: Cancellation POV compressed.pdf | 12 Apr 2024 |
| Other - LegalFile: Cancellation Deed compressed.pdf | 12 Apr 2024 |
| Other - LegalFile: Declaration Land Titile report.pdf | 12 Apr 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A - Kshama.PDF | 11 Apr 2024 |
| Other - TechnicalFile: Annexure A Declairation-Undertaking.PDF | 21 Mar 2024 |
| Other - TechnicalFile: Declaration for FORM 3.PDF | 21 Mar 2024 |
| CERSAI detailsFile: Declaration NO CERSAI.PDF | 28 Feb 2024 |
| Details of encumbrances concerned to FinanceFile: 1a Details Encumbrance concerned Finance.PDF | 26 Feb 2024 |
| Details of encumbrances concerned to LegalFile: 1a Details Encumbrance concerned Finance.PDF | 26 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Rev Form 3_compressed.pdf | 20 Feb 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure Other real estate - M.PDF | 20 Feb 2024 |
| Layout approvalFile: Approved layout plan Tarangan B wing_compressed.pdf | 19 Feb 2024 |
| Copy of Layout Approval (in case of layout)File: Approved layout plan Tarangan B wing_compressed.pdf | 19 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Architect's Certificate of percentage of completion of work (Form 1).PDF | 19 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1 Engineer Certificate RERA 1.PDF | 19 Feb 2024 |
| Proforma of Agreement for saleFile: Draft Agreement for Sale - Annexure A 13062024.pdf | 19 Feb 2024 |
| Details of encumbrances concerned to FinanceFile: 1b Details Encumbrance concerned legal Bank.PDF | 16 Feb 2024 |
| Details of encumbrances concerned to LegalFile: 1b Details Encumbrance concerned legal Bank.PDF | 16 Feb 2024 |
| Declaration about Commencement CertificateFile: 1 Declaration about cc.PDF | 16 Feb 2024 |
| Declaration about Commencement CertificateFile: 1 Declaration about cc.PDF | 16 Feb 2024 |
| Proforma of Allotment letterFile: 1 PROFORMA OF THE ALLOTMENT LETTER.pdf | 16 Feb 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 1 Separate bank account.PDF | 16 Feb 2024 |
| Deviation Report with respect to Allotment letterFile: 1 Deviation report with respect to allotment letter.pdf | 16 Feb 2024 |
| Deviation Report with respect to model copy of AgreementFile: Revised Deviation in AFS.PDF | 16 Feb 2024 |
| Other - LegalFile: DA 2-6.pdf | 16 Feb 2024 |
| Other - LegalFile: DA 7-12.pdf | 16 Feb 2024 |
| Other - LegalFile: DA 13-17.pdf | 16 Feb 2024 |
| Other - LegalFile: DA 18-23.pdf | 16 Feb 2024 |
| Other - LegalFile: DA 24-30.pdf | 16 Feb 2024 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| PORTO DO DIO-ESTRELA | PUNOLA VILLAGE UCASSAIM BARDEZ GOA | 13 | Completed | May 2015 | Late, Apr 2016 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Sindhudurg
Computed across the 530+ Sindhudurg projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 4 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 95 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep TARANGAN B WING on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near SANGIRDE KUDAL530+ in Sindhudurg
ORIGIN KUDAL
AXON ORIGIN KUDAL LLP
Nirmitee Avighna
NIRMITEE BUILDERS & DEVELOPERS
Crestview Court
STALLUM BUILDCON PRIVATE LIMITED
Nirmitee S S Royal Plaza
NIRMITEE BUILDERS & DEVELOPERS
Kshitij Market City Phase II
Kshitij Developers
AARADHANA
BALAJI BUILDERS AND DEVELOPERS
See every Sindhudurg project, with the district possession charts
Builder: CONSORTEXE PROPERTIES PVT LTD
CONSORTEXE PROPERTIES PVT LTD has 5 registrations on MahaRERA, including ANANDVAN DABHOLKAR SANKUL PHASE 3 and ANANDVAN DABHOLKAR SANKUL- PHASE 4. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Sindhudurg district page.
Frequently asked questions
What are my rights if TARANGAN B WING is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of TARANGAN B WING?
The registered promoter entity is CONSORTEXE PROPERTIES PVT LTD, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in TARANGAN B WING?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for TARANGAN B WING?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at TARANGAN B WING?
The professionals named in the filing: Architect: SWARUP MAYEKAR Mayekar; Engineer: RUPESH TAWATE; Engineer: Vinayak Suresh Nawar; Chartered Accountant: D R KEVAT & ASSOCIATES; Chartered Accountant: Kapure & Kapure. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in TARANGAN B WING?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback