Completed No litigation declared Others project

Tara City

By Nilesh Shivjee Singh

RG-MH-24748 · RERA P52100009317 · Last updated on MahaRERA portal: 10 Jan 2020

Source: official MahaRERA filing

Red flags

  • 24 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2018Possession promisedregistration recorded completed
36 of 66Construction stages doneacross 6 buildings; furthest along: Sanitary Fittings within the flats /..., 80%
24Complaints at MahaRERAon this registration
Jump to the 32 documents Report an error

Tara City is a Others project by Nilesh Shivjee Singh in Pune, Maharashtra, registered with MahaRERA as P52100009317 on 22 Aug 2017. The registration is recorded completed; possession was promised by 31 Dec 2018. 24 complaints are on record with the regulator.

At a glance

Project

  • NameTara City
  • TypeOthers
  • Location
    • Loni-kalbhor
    • Haveli
    • Pune
    • 412202
  • Pincode412202
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100009317
  • ReraGenie IDRG-MH-24748

Builder

  • NameNilesh Shivjee Singh
  • Entity typePartnership
  • PartnerNilesh Shivjee Singh
  • Other registrations3 more →
  • Completed1 of 4
  • No longer live3 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

this monthRegisteredAug 2017PromisedDec 2018Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on22 Aug 2017
  • Promised completion31 Dec 2018
  • Revised completionNone
  • Buildings6 building records
  • Documents filed32 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing A1NA120000
Wing A2NA120000
Wing A3NA120000
Wing A4NA120000
Wing A5NA140000
Bunglow B1-B6NA30000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building6

As on 10 Jan 2020, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

36 of 66 construction stages are filed complete across 6 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 80%.

Wing A173%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Wing A265%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%
Wing A365%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks70%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.70%
Wing A459%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks70%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.70%
Wing A573%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Bunglow B1-B673%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 10 Jan 2020, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes90%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes90%
Storm Water DrainsYes90%
Landscaping & Tree PlantingYes90%
Street LightingYes90%
Community BuildingsYes90%
Treatment And Disposal Of Sewage And Sullage WaterYes90%
Solid Waste Management And DisposalYes90%
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes80%
Electrical meter room, sub-station, receiving stationYes90%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes10%

Parking filed54

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots54
Closed/Covered14
Open Space40
BuildingClosed/CoveredOpen SpaceTotal
Wing A110616
Wing A2167
Wing A3167
Wing A4167
Wing A5178
Bunglow B1-B6099

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area17,462 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Kiran Ravindra DhumalPune (M Corp.)Pune

Approvals and building plan

Permissible FSI11131.5
Proposed, not sanctioned11,132 sq m
Buildings approved6
Buildings sanctioned6

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKalyani Nagar Pune

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSumitesh Zinjurde
PartnerRole in project
Nilesh Shivjee Singh-

Complaints filed with MahaRERA24

Case no.ComplainantRespondentFiled
CC005000000022168Dr. Neelima Shashikant ChunkhareMrs. Kiran Ravindra Dhumal23/10/2018
CC005000000022335Mr. Sarveshwar S Desai1) Shivtara Associates15/12/2018
CC005000000022336Mr. Amol PhalleM/s. Shivtara Associates15/12/2018
CC005000000022337Mr. Anil RathodM/s. Shivtara Associates15/12/2018
CC005000000022338Mr. Prashant DeshmukhM/s. Shivtara Associates15/12/2018
CC005000000022339Mr. Sumit SinghM/s. Shivtara Associates15/12/2018
CC005000000022340Mr. Devraj HazareM/s.Shivtara Associates15/12/2018
CC005000000022341Mr. Pradipkumar KinholkarM/s. Shivtara Associates15/12/2018
CC005000000022343Mr. Kishor SuryawanshiM/s. Shivtara Associates15/12/2018
CC005000000022356Mr. Sachin PawarM/s Shivtara Associates19/12/2018
CC005000000022357Mr. Abhijit MahajanM/s Shivtara Associates19/12/2018
CC005000000022359Mr. Dattatraya GhonganeM/s. Shivtara Associates19/12/2018
CC005000000022360Mr. Manoj VyasM/s Shivtara Associates19/12/2018
CC005000000022369Mr. Sandeep DhaneshwarM/s Shivtara Associates21/12/2018
CC005000000022370Mr. Aju MarshalM/s Shivtara Associates21/12/2018
CC005000000022449Bapusaheh KaygudeShivtara Associates21/03/2019
CC005000000022838Gourishankar MhamaneShivtara Associates30/03/2019
CC005000000022839GNANESHWAR CHAUDHARIShivtara Associates30/03/2019
CC005000000022840Rachana BhobeM/s Shivtara Associates30/03/2019
CC005000000022841Ratnesh JhonsonM/s. Shivtara Associates30/03/2019
CC005000000022884Sagar DorgeM/s. Shiva Tara Associates09/04/2019
CC005000000022888Vilas AlteM/s. Shivtara Associates10/04/2019
CC005000000022648Satishchandra Suresh LokhandeShivtara Associates08/02/2019
CC005000000053913Hemant PatilNilesh Shivjee Singh28/01/2020

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 1 Aug 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 1 Aug 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 1 Aug 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Apr 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed32

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: CITY.pdf10 Jan 2020
Commencement Certificates / NA Order for plotted developmentFile: Tara City N A Order_Compressed.pdf21 Apr 2018
Layout approvalFile: Temp04762_Compressed.pdf1 Aug 2017
Building plan approvalFile: Temp04763_Compressed.pdf1 Aug 2017
Building plan approvalFile: Temp04764_Compressed.pdf1 Aug 2017
Building plan approvalFile: Temp04765_Compressed.pdf1 Aug 2017
Building plan approvalFile: Temp04766_Compressed.pdf1 Aug 2017
PAN CardFile: Tara City Pan Card.pdf1 Aug 2017
Copy of the legal title reportFile: TARA CITY SEARCH TITLE REPORT ORIGINAL FILE _Compressed.pdf1 Aug 2017
Copy of the legal title reportFile: TARA CITY SEARCH TITLE REPORT ORIGINAL FILE 2_Compressed.pdf1 Aug 2017
Copy of the legal title reportFile: TARA CITY SEARCH TITLE REPORT 1_Compressed.pdf1 Aug 2017
Copy of the legal title reportFile: TARA CITY SEARCH TITLE REPORT ORIGINAL FILE 3_Compressed.pdf1 Aug 2017
Details of encumbrancesFile: TARA CITY SEARCH TITLE REPORT ORIGINAL FILE _Compressed.pdf1 Aug 2017
Copy of Layout Approval (in case of layout)File: Temp04762_Compressed.pdf1 Aug 2017
Building Plan Approval (IOD)File: Temp04763_Compressed.pdf1 Aug 2017
Building Plan Approval (IOD)File: Temp04764_Compressed.pdf1 Aug 2017
Building Plan Approval (IOD)File: Temp04765_Compressed.pdf1 Aug 2017
Building Plan Approval (IOD)File: Temp04766_Compressed.pdf1 Aug 2017
Declaration in FORM BFile: Tara City Amenity_Compressed.pdf1 Aug 2017
Declaration in FORM BFile: Tara City Wing A1_Compressed.pdf1 Aug 2017
Declaration in FORM BFile: Tara City Wing A2_Compressed.pdf1 Aug 2017
Declaration in FORM BFile: Tara City Wing A3_Compressed.pdf1 Aug 2017
Declaration in FORM BFile: Tara City Wing A4_Compressed.pdf1 Aug 2017
Declaration in FORM BFile: Tara City Wing A5_Compressed.pdf1 Aug 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: rew certificate A1 Wing Tara City.pdf1 Aug 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: rew certificate A2 Wing Tara City.pdf1 Aug 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: rew certificate A3 Wing Tara City.pdf1 Aug 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: rew certificate A4 Wing Tara City.pdf1 Aug 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: rew certificate A5 Wing Tara City.pdf1 Aug 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificte Compressed Tara City.pdf1 Aug 2017
Certificates of CA (Form 3)File: CA Certifi Tara City_Compressed.pdf1 Aug 2017
Proforma of Allotment letterFile: Tara City.pdf1 Aug 2017

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Tara City on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Loni-kalbhor13,700+ in Pune

2 kmTara CityCompleted 12Lapsed / revoked 5Other 5Dot size: filed unitsN

Filed coordinates, straight-line distance. 22 registered projects within 2 km.

Builder: Nilesh Shivjee Singh

Nilesh Shivjee Singh has 4 registrations on MahaRERA, including Tara Alicia and Tara Mondesire. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Tara City is delayed beyond 31 Dec 2018?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Tara City?

The registered promoter entity is Nilesh Shivjee Singh, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Tara City?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Tara City?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Tara City?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Tara City?

The professionals named in the filing: Architect: Sumitesh Zinjurde. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Tara City?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Tara City. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Tara City to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.