Tara City
RG-MH-24748 · RERA P52100009317 · Last updated on MahaRERA portal: 10 Jan 2020
Source: official MahaRERA filing
Red flags
- 24 complaints at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Tara City is a Others project by Nilesh Shivjee Singh in Pune, Maharashtra, registered with MahaRERA as P52100009317 on 22 Aug 2017. The registration is recorded completed; possession was promised by 31 Dec 2018. 24 complaints are on record with the regulator.
At a glance
Project
- NameTara City
- TypeOthers
- Location
- Loni-kalbhor
- Haveli
- Pune
- 412202
- Pincode412202
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100009317
- ReraGenie IDRG-MH-24748
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on22 Aug 2017
- Promised completion31 Dec 2018
- Revised completionNone
- Buildings6 building records
- Documents filed32 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Wing A1 | NA | 12 | 0 | 0 | 0 | 0 |
| Wing A2 | NA | 12 | 0 | 0 | 0 | 0 |
| Wing A3 | NA | 12 | 0 | 0 | 0 | 0 |
| Wing A4 | NA | 12 | 0 | 0 | 0 | 0 |
| Wing A5 | NA | 14 | 0 | 0 | 0 | 0 |
| Bunglow B1-B6 | NA | 3 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building6
As on 10 Jan 2020, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
36 of 66 construction stages are filed complete across 6 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 80%.
Wing A173%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Wing A265%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 80% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 80% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 80% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 80% |
Wing A365%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 70% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 70% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 70% |
Wing A459%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 70% |
| Sanitary Fittings within the flats / premises | 70% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 70% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 70% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 70% |
Wing A573%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Bunglow B1-B673%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 10 Jan 2020, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 90% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 90% |
| Storm Water Drains | Yes | 90% |
| Landscaping & Tree Planting | Yes | 90% |
| Street Lighting | Yes | 90% |
| Community Buildings | Yes | 90% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 90% |
| Solid Waste Management And Disposal | Yes | 90% |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 80% |
| Electrical meter room, sub-station, receiving station | Yes | 90% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 10% |
Parking filed54
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| Wing A1 | 10 | 6 | 16 |
| Wing A2 | 1 | 6 | 7 |
| Wing A3 | 1 | 6 | 7 |
| Wing A4 | 1 | 6 | 7 |
| Wing A5 | 1 | 7 | 8 |
| Bunglow B1-B6 | 0 | 9 | 9 |
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Kiran Ravindra Dhumal | Pune (M Corp.) | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners1
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Sumitesh Zinjurde |
| Partner | Role in project |
|---|---|
| Nilesh Shivjee Singh | - |
Complaints filed with MahaRERA24
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC005000000022168 | Dr. Neelima Shashikant Chunkhare | Mrs. Kiran Ravindra Dhumal | 23/10/2018 |
| CC005000000022335 | Mr. Sarveshwar S Desai | 1) Shivtara Associates | 15/12/2018 |
| CC005000000022336 | Mr. Amol Phalle | M/s. Shivtara Associates | 15/12/2018 |
| CC005000000022337 | Mr. Anil Rathod | M/s. Shivtara Associates | 15/12/2018 |
| CC005000000022338 | Mr. Prashant Deshmukh | M/s. Shivtara Associates | 15/12/2018 |
| CC005000000022339 | Mr. Sumit Singh | M/s. Shivtara Associates | 15/12/2018 |
| CC005000000022340 | Mr. Devraj Hazare | M/s.Shivtara Associates | 15/12/2018 |
| CC005000000022341 | Mr. Pradipkumar Kinholkar | M/s. Shivtara Associates | 15/12/2018 |
| CC005000000022343 | Mr. Kishor Suryawanshi | M/s. Shivtara Associates | 15/12/2018 |
| CC005000000022356 | Mr. Sachin Pawar | M/s Shivtara Associates | 19/12/2018 |
| CC005000000022357 | Mr. Abhijit Mahajan | M/s Shivtara Associates | 19/12/2018 |
| CC005000000022359 | Mr. Dattatraya Ghongane | M/s. Shivtara Associates | 19/12/2018 |
| CC005000000022360 | Mr. Manoj Vyas | M/s Shivtara Associates | 19/12/2018 |
| CC005000000022369 | Mr. Sandeep Dhaneshwar | M/s Shivtara Associates | 21/12/2018 |
| CC005000000022370 | Mr. Aju Marshal | M/s Shivtara Associates | 21/12/2018 |
| CC005000000022449 | Bapusaheh Kaygude | Shivtara Associates | 21/03/2019 |
| CC005000000022838 | Gourishankar Mhamane | Shivtara Associates | 30/03/2019 |
| CC005000000022839 | GNANESHWAR CHAUDHARI | Shivtara Associates | 30/03/2019 |
| CC005000000022840 | Rachana Bhobe | M/s Shivtara Associates | 30/03/2019 |
| CC005000000022841 | Ratnesh Jhonson | M/s. Shivtara Associates | 30/03/2019 |
| CC005000000022884 | Sagar Dorge | M/s. Shiva Tara Associates | 09/04/2019 |
| CC005000000022888 | Vilas Alte | M/s. Shivtara Associates | 10/04/2019 |
| CC005000000022648 | Satishchandra Suresh Lokhande | Shivtara Associates | 08/02/2019 |
| CC005000000053913 | Hemant Patil | Nilesh Shivjee Singh | 28/01/2020 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 1 Aug 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 1 Aug 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 1 Aug 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 21 Apr 2018Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed32
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Architect’s Certificate on Completion of Project (Form 4)File: CITY.pdf | 10 Jan 2020 |
| Commencement Certificates / NA Order for plotted developmentFile: Tara City N A Order_Compressed.pdf | 21 Apr 2018 |
| Layout approvalFile: Temp04762_Compressed.pdf | 1 Aug 2017 |
| Building plan approvalFile: Temp04763_Compressed.pdf | 1 Aug 2017 |
| Building plan approvalFile: Temp04764_Compressed.pdf | 1 Aug 2017 |
| Building plan approvalFile: Temp04765_Compressed.pdf | 1 Aug 2017 |
| Building plan approvalFile: Temp04766_Compressed.pdf | 1 Aug 2017 |
| PAN CardFile: Tara City Pan Card.pdf | 1 Aug 2017 |
| Copy of the legal title reportFile: TARA CITY SEARCH TITLE REPORT ORIGINAL FILE _Compressed.pdf | 1 Aug 2017 |
| Copy of the legal title reportFile: TARA CITY SEARCH TITLE REPORT ORIGINAL FILE 2_Compressed.pdf | 1 Aug 2017 |
| Copy of the legal title reportFile: TARA CITY SEARCH TITLE REPORT 1_Compressed.pdf | 1 Aug 2017 |
| Copy of the legal title reportFile: TARA CITY SEARCH TITLE REPORT ORIGINAL FILE 3_Compressed.pdf | 1 Aug 2017 |
| Details of encumbrancesFile: TARA CITY SEARCH TITLE REPORT ORIGINAL FILE _Compressed.pdf | 1 Aug 2017 |
| Copy of Layout Approval (in case of layout)File: Temp04762_Compressed.pdf | 1 Aug 2017 |
| Building Plan Approval (IOD)File: Temp04763_Compressed.pdf | 1 Aug 2017 |
| Building Plan Approval (IOD)File: Temp04764_Compressed.pdf | 1 Aug 2017 |
| Building Plan Approval (IOD)File: Temp04765_Compressed.pdf | 1 Aug 2017 |
| Building Plan Approval (IOD)File: Temp04766_Compressed.pdf | 1 Aug 2017 |
| Declaration in FORM BFile: Tara City Amenity_Compressed.pdf | 1 Aug 2017 |
| Declaration in FORM BFile: Tara City Wing A1_Compressed.pdf | 1 Aug 2017 |
| Declaration in FORM BFile: Tara City Wing A2_Compressed.pdf | 1 Aug 2017 |
| Declaration in FORM BFile: Tara City Wing A3_Compressed.pdf | 1 Aug 2017 |
| Declaration in FORM BFile: Tara City Wing A4_Compressed.pdf | 1 Aug 2017 |
| Declaration in FORM BFile: Tara City Wing A5_Compressed.pdf | 1 Aug 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: rew certificate A1 Wing Tara City.pdf | 1 Aug 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: rew certificate A2 Wing Tara City.pdf | 1 Aug 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: rew certificate A3 Wing Tara City.pdf | 1 Aug 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: rew certificate A4 Wing Tara City.pdf | 1 Aug 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: rew certificate A5 Wing Tara City.pdf | 1 Aug 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificte Compressed Tara City.pdf | 1 Aug 2017 |
| Certificates of CA (Form 3)File: CA Certifi Tara City_Compressed.pdf | 1 Aug 2017 |
| Proforma of Allotment letterFile: Tara City.pdf | 1 Aug 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 3 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 32 filed documents as one ZIP, foldered, with a manifest
Keep Tara City on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Loni-kalbhor13,700+ in Pune
Filed coordinates, straight-line distance. 22 registered projects within 2 km.
Green Fantasy Phase-I
Shree Mangalmurti Associates Phase-I
24 KOREGAON GREENS
OBEROI INFRA CONSULTANT LLP
Chintamani Paradise
01/04/2017
Emerald City
Suresh kanchan & other 5
KANCHAN CITY
MR. SANJAY ABASAHEB KANCHAN AND OTHER - 1
GOKUL VILLA
GOKUL VILLA
Builder: Nilesh Shivjee Singh
Nilesh Shivjee Singh has 4 registrations on MahaRERA, including Tara Alicia and Tara Mondesire. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Tara City is delayed beyond 31 Dec 2018?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Tara City?
The registered promoter entity is Nilesh Shivjee Singh, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Tara City?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Tara City?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Tara City?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Tara City?
The professionals named in the filing: Architect: Sumitesh Zinjurde. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Tara City?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback