TAPOVAN SOLACE

By TAPOVAN PROJECTS

RG-KA-39720 · RERA PRM/KA/RERA/1268/378/PR/171026/000651

Source: official RERA Karnataka filing

Red flags

  • 2 complaints at RERA Karnataka
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • Separate project account declared
Sep 2019Possession promisedmoved 12 months from the original
2Complaints at RERA Karnatakaon this registration
Jump to the 55 documents Report an error

TAPOVAN SOLACE is a Residential/Group Housing project by TAPOVAN PROJECTS in Mysore, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1268/378/PR/171026/000651 on 26 Oct 2017. Possession is promised by 22 Sep 2019. The completion date has moved by 12 months from the original filing. 2 complaints are on record with the regulator.

At a glance

Project

  • NameTAPOVAN SOLACE
  • TypeResidential/Group Housing
  • Location
    • MYSORE
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1268/378/PR/171026/000651
  • ReraGenie IDRG-KA-39720

Builder

  • NameTAPOVAN PROJECTS
  • Entity typePartnership Firm
  • Authorized SignatoryAJIT NARAYAN K
  • OthersRohan Krishna
  • Declared earlier projects1 →

Key dates

this monthRegisteredOct 2017First promiseSep 2018Revised toSep 2019

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on26 Oct 2017
  • Promised completion22 Sep 2019
  • Revised completionRevised to 22 Sep 2019 (originally 22 Sep 2018)
  • Buildings1 building record
  • Documents filed55 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
TAPOVAN SOLACE---70070

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja work-
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)-
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities41

Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsNoNot applicable
Sewage and Drainage SystemYes-
Parks & Tree plantingYes-
Street LightingYes-
Provision for community buildings and for treatment and disposal of sewage and sullage waterYes-
Solid waste management and disposalNoNot applicable
Water conservationYes-
Energy managementYes-
Fire protection and fire safety requirementsNoNot applicable
Education/Health/Other public amenitiesYes-
Electricity supply transformer and substationYes-
Emergency Evacuation servicesNoNot applicable
Storm water drainsNoNot applicable
Use of renewable energyNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationYes-
CCTV SurveillanceYes-
Club HouseYes-
Community HallYes-
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolYes-
GymYes-
ParksYes-
Power BackupYes-
GasNoNot applicable
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesNoNot applicable
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyYes-

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,742 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 14.67 cr

Certifying professionals and partners1

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
EngineerHS DEEPAK

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EX/PRM/KA/RERA/1268/378/PR/200205/000651Sep 2018 → Sep 2019

Reason as filed by the promoterothers

Complaints filed with RERA Karnataka2

Case no.ComplainantRespondentFiled
CMP/190909/0003878-TAPOVAN PROJECTS09/09/2019
CMP/220116/0008804-TAPOVAN PROJECTS16/01/2022

Documents filed55

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1268/378/PR/171026/000651 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CertificateFile: registration of firm 001.jpg-
Architect Certificate for Work Completion Schedule till DateFile: Architects certificate for Status of Work.pdf-
Engineer Certificate for Work Completion Schedule till DateFile: Engineer Certificate for status of work.pdf-
CA Certificate for Funds UtilizationFile: CA -Fund utilisation.pdf-
Architect Certificate for Pending Work Completion Schedule.File: Architects certificate for pending work.pdf-
Engineer Certificate for Pending Work Completion Schedule.File: Engineering Certificate for Pending Work.pdf-
CA Certificate for Funds required for Project CompletionFile: CA -Fund Required.pdf-
AffidavitFile: Affidavit- 05-12-2019.pdf-
Latest Encumbrance CertificateFile: EC.pdf-
Consent letter from 2/3rd of AllotteesFile: Consent Letter.pdf-
Details Of Sold/ Un-sold UnitsFile: SoldUnsoldDetails for Extension of project.xlsx-
Document 1File: E C from - 2004 to 2019.pdf-
Document 2File: CONCENT LETTER.pdf-
Document 3File: Consent letters.pdf-
Document 4File: Comencement Certificate.pdf-
Document 5File: Affidavit.pdf-
C C-
Image_to_JPG0912-02-
Single Layout Plan (1)-
SALE DEED SOLACE-
solace agreement-
Existing Layout Plan-
Existing Layout Plan-
Sale Deed-
KM_206_00103-
Tapovan Solace rera-
allotment letter-
Tapovan Solace Brochure copy-
KSPCB NOC pdf-
Project Specification (1)-
E C-
img183-
Sale Deed-
Relinquishment Deed-
Balance Sheet 2015 - 2016File: 2016-17 - BS.pdf-
Balance Sheet 2014 - 2015File: TP BS-2015-16-2 001.jpg-
Balance Sheet 2013 - 2014File: 2014-15 - BS.pdf-
Audited Profit and Loss Statement 2015 - 2016File: 2016-17 - P & L.pdf-
Audited Profit and Loss Statement 2014 - 2015File: TP-P & L-2015-16 001.jpg-
Audited Profit and Loss Statement 2013 - 2014File: 2014-15 - P & L.pdf-
Director's Report 2015 - 2016File: DIRECTOR REPORT.pdf-
Director's Report 2014 - 2015File: DIRECTOR REPORT.pdf-
Director's Report 2013 - 2014File: DIRECTOR REPORT.pdf-
Cash Flow Statement 2015 - 2016File: 2016-17 - CF.pdf-
Cash Flow Statement 2014 - 2015File: 2015-16 - CF.pdf-
Auditor's Report 2015 - 2016File: 2016-17 - Auditor Report.pdf-
Auditor's Report 2014 - 2015File: 2015-16 - A R.pdf-
Auditor's Report 2013 - 2014File: 2014-15 - A R.pdf-
Income Tax Return Acknowledgement 2015 - 2016File: 2016-17 - ITR.pdf-
Income Tax Return Acknowledgement 2014 - 2015File: 2015-16 ITR.pdf-
Income Tax Return Acknowledgement 2013 - 2014File: 2014-15 - ITR.pdf-
Affidavit-
Prospectus/BrochureFile: Brochure.pdf-
Advertisement Copy 1File: Advertisement.pdf-
Tower Excel SheetFile: PRM_KA_RERA_1268_378_PR_171026_000651 (2).xlsx-

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 declared completed, no finish date filed
ProjectLocationStatusPromisedDelivered
TAPOVAN SARASWATHI-CompletedJul 2017No date filed

How this compares with Mysore

28%of Mysore projects moved their completion datethis one moved by 12 months
0%of Mysore registrations are shown as withdrawn or revokedthis one is not

Computed across the 700+ Mysore projects on ReraGenie, from their own filings.

Keep TAPOVAN SOLACE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Mysore700+ in Mysore

2 kmTAPOVAN SOLACEOther 4Dot size: filed unitsN

Filed coordinates, straight-line distance. 4 registered projects within 2 km.

Builder: TAPOVAN PROJECTS

TAPOVAN PROJECTS has 1 registration on RERA Karnataka, including TAPOVAN SOLACE. Its filings declare 1 earlier project, 1 of them declared completed. Read the full track record. See more projects on the Mysore district page.

Frequently asked questions

What are my rights if TAPOVAN SOLACE is delayed beyond 22 Sep 2019?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of TAPOVAN SOLACE?

The registered promoter entity is TAPOVAN PROJECTS, a partnership firm as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in TAPOVAN SOLACE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against TAPOVAN SOLACE?

Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

Who certifies construction progress at TAPOVAN SOLACE?

The professionals named in the filing: Engineer: HS DEEPAK. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in TAPOVAN SOLACE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About TAPOVAN SOLACE. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save TAPOVAN SOLACE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.