Home / Browse projects / Mysore, Karnataka / Construction of 2446 Dus at Mandakalli Mysore
Construction of 2446 Dus at Mandakalli Mysore
By MCC
RG-KA-27841 · RERA PRM/KA/RERA/1268/378/PR/071122/005418 · Last updated on RERA Karnataka portal: 3 Nov 2022
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
Construction of 2446 Dus at Mandakalli Mysore is a Residential/Group Housing project by MCC in Mysore, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1268/378/PR/071122/005418 on 7 Nov 2022. Possession is promised by 31 Dec 2025.
At a glance
Project
- NameConstruction of 2446 Dus at Mandakalli Mysore
- TypeResidential/Group Housing
- Location
- MYSORE
- PincodeNot stated
- RERA no.PRM/KA/RERA/1268/378/PR/071122/005418
- ReraGenie IDRG-KA-27841
Builder
- NameMCC
- Entity typeRajiv Gandhi Housing Corporation Limited
- Authorized SignatoryCity Corporation Commissioner
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on7 Nov 2022
- Promised completion31 Dec 2025
- Revised completionNone
- Buildings1 building record
- Documents filed89 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A | - | - | - | 2446 | 0 | 2446 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 3 Nov 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
Building:
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | - |
| Foundation footing work | - |
| Upto Plinth Level | - |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | - |
| Retaining wall (All types) | Not applicable |
| RCC or MS Framed structure | - |
| Masonry Construction | - |
| Plastering inside , outside & Ceiling | - |
| Joinery: Doors, Windows, Ventilators etc | - |
| Basic work of Water supply, Sanitary and Electrification | - |
| Dadoing, Skirting, Flooring, Tiles work (All types) | - |
| Railing and Grill fixing | - |
| Electrification, Water supply and Sanitary Finishing | - |
| Painting | - |
| Fire prevention and fire fighting fitting and fixture with network | Not applicable |
| Weather Proof work(tile,concrete) | Not applicable |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | Not applicable |
| Internal and External work including landscapes as per sanctioned drawings | Not applicable |
Progress on shared amenities35
As on 3 Nov 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | - |
| Sewage and Drainage System | Yes | - |
| Water conservation/rain water harvesting/recharge of ground water | Yes | - |
| Energy management | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Solid waste management and disposal | No | Not applicable |
| Emergency Evacuation services | No | Not applicable |
| Internal Roads & Footpaths | Yes | - |
| Electricity supply transformer and substation | Yes | - |
| Storm water drains | No | Not applicable |
| Use of renewable energy | No | Not applicable |
| Sewage Treatment Plant (STP) | Yes | - |
| Parks & Tree planting | Yes | - |
| Street Lighting | Yes | - |
| Electricity | Yes | - |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | No | Not applicable |
| Club House | No | Not applicable |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | No | Not applicable |
| Indoor Sports facility | No | Not applicable |
| Swimming Pool | No | Not applicable |
| Gym | No | Not applicable |
| Staircases | Yes | - |
| Lifts | No | Not applicable |
| Corridor/Lobbies | No | Not applicable |
| Fire escapes | No | Not applicable |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | - |
| Basement | No | Not applicable |
| Terrace | Yes | - |
| Outer Wall | No | Not applicable |
| Open parking areas | No | Not applicable |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | No | Not applicable |
| Common storage spaces | No | Not applicable |
Land and ownership1
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| CIty corporation commissioner | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 158.00 cr | - |
| On-site expenditure-Salaries of workers | Rs 12.04 cr | - |
| On-site expenditure-Consultants Fees | Rs 1.98 cr | - |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Gayathri and Namith Associates |
| Engineer | Shenoy |
| Chartered Accountant | CIty corporation |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed89
As listed on the registration, under the names the promoter filed them with; the newest 80 of 89 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1268/378/PR/071122/005418 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| signed copy of residential Development (Muda approved)File: 20221102_111859_0002-compressed.pdf | 3 Nov 2022 |
| sanctioned floor plansFile: GF PLAN.pdf | 3 Nov 2022 |
| sanctioned floor SectionFile: TYPICAL.pdf | 3 Nov 2022 |
| elevation drawingFile: RGHCL-AERIAL-.jpg | 3 Nov 2022 |
| BUILDING LICENSEFile: 20221102_111859_0002-compressed.pdf | 3 Nov 2022 |
| RTC, survey 170 | - |
| Mutation, survey 170 | - |
| Encumbrance Certificate, survey 170 | - |
| Khatha, survey 170 | - |
| Registration CertificateFile: Gazzette.pdf | - |
| Certificate issued by CA Form 1File: audit statment.pdf | - |
| Certificate issued by Architect Form 2File: CONSULTANT DETAILS.pdf | - |
| Certificate issued by Engineer Form 3File: Form D.pdf | - |
| Project Chartered Accountant | - |
| Project Engineer | - |
| Project Architect | - |
| AffidavitFile: Signature.pdf | - |
| Certificate from Chartered AccountFile: audit statment.pdf | - |
| Balance Sheet 2021 - 2022File: audit statment.pdf | - |
| Balance Sheet 2020 - 2021File: audit statment 2.pdf | - |
| Balance Sheet 2019 - 2020File: audit statment 3.pdf | - |
| Audited Profit and Loss Statement 2021 - 2022File: audit statment 3.pdf | - |
| Audited Profit and Loss Statement 2020 - 2021File: audit statment 2.pdf | - |
| Audited Profit and Loss Statement 2019 - 2020File: audit statment.pdf | - |
| Director's Report 2021 - 2022File: audit statment.pdf | - |
| Director's Report 2020 - 2021File: audit statment 2.pdf | - |
| Director's Report 2019 - 2020File: audit statment 3.pdf | - |
| Cash Flow Statement 2021 - 2022File: audit statment.pdf | - |
| Cash Flow Statement 2020 - 2021File: audit statment 3.pdf | - |
| Auditor's Report 2021 - 2022File: audit statment.pdf | - |
| Auditor's Report 2020 - 2021File: audit statment 2.pdf | - |
| Auditor's Report 2019 - 2020File: audit statment 3.pdf | - |
| Income Tax Return Acknowledgement 2021 - 2022File: Mutation.pdf | - |
| Income Tax Return Acknowledgement 2020 - 2021File: audit statment 3.pdf | - |
| Income Tax Return Acknowledgement 2019 - 2020File: audit statment.pdf | - |
| Gazzette | - |
| Signature | - |
| Signature | - |
| SANTION LAYOUT MANDAKALLI | - |
| GF PLAN | - |
| SANTION LAYOUT MANDAKALLI | - |
| GF PLAN | - |
| TYPICAL | - |
| PMAYM- foundation-Model | - |
| GF PLAN | - |
| PMAYM-column | - |
| Form C | - |
| Form D | - |
| Form D | - |
| Form C | - |
| TYPICAL | - |
| Signature | - |
| RTC2 | - |
| Signature | - |
| Mutation | - |
| RTC1 | - |
| RTC1 | - |
| Signature | - |
| Gazzette | - |
| Adhaar | - |
| Signature | - |
| Signature | - |
| Signature | - |
| Signature | - |
| Signature | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| audit statment | - |
| Unnamed document | - |
| Unnamed document | - |
| Signature | - |
| Architect Certificate for Work Completion Schedule till DateFile: Letter Extension_compressed.pdf | - |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mysore
Computed across the 700+ Mysore projects on ReraGenie, from their own filings.
Keep Construction of 2446 Dus at Mandakalli Mysor on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Mysore700+ in Mysore
Construction of 1440 houses at lalithadripura
City Corporation Myuru
Construction of 843 G+2 Houses
Chief Officer
JAL VAYU TOWERS
AIR FORCE NAVAL HOUSING BOARD
Sanaklp Temple Tree
Sankalp Constructions private limited
SANKALP CROWN PHASE 1
SANKALP CONSTRUCTIONS PRIVATE LIMITED
SANKALP CROWN PHASE 2
SANKALP CONSTRUCTIONS PRIVATE LIMITED
See every Mysore project, with the district possession charts
Builder: MCC
MCC has 1 registration on RERA Karnataka, including Construction of 2446 Dus at Mandakalli Mysore. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Mysore district page.
Frequently asked questions
What are my rights if Construction of 2446 Dus at Mandakalli Mysore is delayed beyond 31 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of Construction of 2446 Dus at Mandakalli Mysore?
The registered promoter entity is MCC, a rajiv gandhi housing corporation limited as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in Construction of 2446 Dus at Mandakalli Mysore?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at Construction of 2446 Dus at Mandakalli Mysore?
The professionals named in the filing: Architect: Gayathri and Namith Associates; Engineer: Shenoy; Chartered Accountant: CIty corporation. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Construction of 2446 Dus at Mandakalli Mysore?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback