Home / Browse projects / Mysore, Karnataka / Construction of 1440 houses at lalithadripura mys

Registration approved No litigation declared Residential/Group Housing project

Construction of 1440 houses at lalithadripura mys

By City Corporation Myuru

RG-KA-59989 · RERA PRM/KA/RERA/1268/378/PR/181223/006495 · Last updated on RERA Karnataka portal: 7 Dec 2023

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Oct 2028Possession promisedno revision filed
0Complaints at RERA Karnatakaon this registration
Jump to the 88 documents Report an error

Construction of 1440 houses at lalithadripura mys is a Residential/Group Housing project by City Corporation Myuru in Mysore, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1268/378/PR/181223/006495 on 18 Dec 2023. Possession is promised by 10 Oct 2028.

At a glance

Project

  • NameConstruction of 1440 houses at lalithadripura mys
  • TypeResidential/Group Housing
  • Location
    • MYSORE
    • 570010
  • Pincode570010
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1268/378/PR/181223/006495
  • ReraGenie IDRG-KA-59989

Builder

  • NameCity Corporation Myuru
  • Entity typeRajiv Gandhi Housing Corporation Limited
  • Authorized SignatoryCommissioner MCC Mysuru

Key dates

this monthRegisteredDec 2023PromisedOct 2028

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on18 Dec 2023
  • Promised completion10 Oct 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed88 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A---144001440

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 7 Dec 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)Not applicable
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)Not applicable
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation workNot applicable
Internal and External work including landscapes as per sanctioned drawingsNot applicable

Progress on shared amenities36

As on 7 Dec 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
Energy managementNoNot applicable
Fire protection and fire safety requirementsYes-
Solid waste management and disposalYes-
Emergency Evacuation servicesYes-
Internal Roads & FootpathsNoNot applicable
Electricity supply transformer and substationYes-
Storm water drainsNoNot applicable
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)Yes-
Parks & Tree plantingYes-
Street LightingYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceNoNot applicable
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksNoNot applicable
Power BackupNoNot applicable
Piped GasNoNot applicable
Water and SanitationNoNot applicable
Air ConditioningNoNot applicable
StaircasesYes-
LiftsYes-
Corridor/LobbiesNoNot applicable
Fire escapesNoNot applicable
Common entrance and exit for the building/common portico/foyer/verandahNoNot applicable
BasementYes-
TerraceYes-
Outer WallNoNot applicable

Land and ownership1

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area54,126 sq m
Named landowners1
LandownerVillageDistrict
PD--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 17.76 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 17.19 cr-
On-site expenditure-Salaries of workersRs 30.00 lakh-
On-site expenditure-Consultants FeesRs 25.00 lakh-
On-site expenditure-Site OverheadRs 1.00 lakh-
On-site expenditure-Cost Of Services(Water, Electricity, Sewage)Rs 1.00 lakh-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectGirish M swamy consultants
EngineerGirish
Chartered AccountantAccount superintendent

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed88

As listed on the registration, under the names the promoter filed them with; the newest 80 of 88 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1268/378/PR/181223/006495 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
rtc of project noFile: RGHCL MYSORE LAND(RTC) DOCUMENTS.pdf7 Dec 2023
connected MRFile: RGHCL MYSORE LAND(RTC) DOCUMENTS.pdf7 Dec 2023
EC from 1-4- 2007 to till dateFile: RGHCL MYSORE LAND(RTC) DOCUMENTS.pdf7 Dec 2023
order of the dc reserving land to PD,DUDC, MysoreFile: RGHCL MYSORE LAND(RTC) DOCUMENTS.pdf7 Dec 2023
non litigation notarized affidavit,File: RGHCL MYSORE LAND(RTC) DOCUMENTS.pdf7 Dec 2023
form -B affidavitFile: RGHCL MYSORE LAND(RTC) DOCUMENTS.pdf7 Dec 2023
JAcum DeclarationFile: RGHCL MYSORE LAND(RTC) DOCUMENTS.pdf7 Dec 2023
approved planFile: SITE PLAN.pdf7 Dec 2023
approved layout plan. by planning/ development authorityFile: 1_compressed.pdf7 Dec 2023
approved layout plan order. by planning/ development authorityFile: MUDA DEVELOPMENT PLAN APPROVAL 07-07-2023.pdf7 Dec 2023
Engineer license certificateFile: jcpl certificate.pdf7 Dec 2023
Work order copy of the project.File: RGHCL - Mysore WO (1).pdf7 Dec 2023
Airport NOC.File: Airport NOC.jpeg7 Dec 2023
the plinth area and covered area properly as per the sanctioned drawings.File: SITE PLAN.pdf7 Dec 2023
RTC, survey 15-
Mutation, survey 15-
Encumbrance Certificate, survey 15-
Khatha, survey 15-
Registration CertificateFile: Gazzette.pdf-
Certificate issued by CA Form 1-
Certificate issued by Architect Form 2-
Certificate issued by Engineer Form 3-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: signature.jpg-
Certificate from Chartered Account-
Balance Sheet 2022 - 2023File: audit statment.pdf-
Balance Sheet 2021 - 2022File: audit statment.pdf-
Balance Sheet 2020 - 2021File: audit statment.pdf-
Audited Profit and Loss Statement 2022 - 2023File: audit statment.pdf-
Audited Profit and Loss Statement 2021 - 2022File: audit statment.pdf-
Audited Profit and Loss Statement 2020 - 2021File: audit statment.pdf-
Director's Report 2022 - 2023File: audit statment.pdf-
Director's Report 2021 - 2022File: audit statment.pdf-
Director's Report 2020 - 2021File: audit statment.pdf-
Cash Flow Statement 2022 - 2023File: audit statment.pdf-
Cash Flow Statement 2021 - 2022File: audit statment.pdf-
Auditor's Report 2022 - 2023File: audit statment.pdf-
Auditor's Report 2021 - 2022File: audit statment.pdf-
Auditor's Report 2020 - 2021File: audit statment.pdf-
Income Tax Return Acknowledgement 2022 - 2023File: audit statment.pdf-
Income Tax Return Acknowledgement 2021 - 2022File: audit statment.pdf-
Income Tax Return Acknowledgement 2020 - 2021File: audit statment.pdf-
signature-
signature-
signature-
SITE PLAN-
SITE PLAN-
SITE PLAN-
SITE PLAN-
SITE PLAN-
SITE PLAN-
SITE PLAN-
signature-
SITE PLAN-
signature-
signature-
signature-
signature-
signature-
signature-
signature-
signature-
signature-
SITE PLAN-
signature-
signature-
signature-
signature-
signature-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-

How this compares with Mysore

28%of Mysore projects moved their completion datethis one has not
0%of Mysore registrations are shown as withdrawn or revokedthis one is not

Computed across the 700+ Mysore projects on ReraGenie, from their own filings.

Keep Construction of 1440 houses at lalithadripur on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Mysore700+ in Mysore

2 kmConstruction of 1440 houOther 6Dot size: filed unitsN

Filed coordinates, straight-line distance. 6 registered projects within 2 km.

Builder: City Corporation Myuru

City Corporation Myuru has 1 registration on RERA Karnataka, including Construction of 1440 houses at lalithadripura mys. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Mysore district page.

Frequently asked questions

What are my rights if Construction of 1440 houses at lalithadripura mys is delayed beyond 10 Oct 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Construction of 1440 houses at lalithadripura mys?

The registered promoter entity is City Corporation Myuru, a rajiv gandhi housing corporation limited as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Construction of 1440 houses at lalithadripura mys?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at Construction of 1440 houses at lalithadripura mys?

The professionals named in the filing: Architect: Girish M swamy consultants; Engineer: Girish; Chartered Accountant: Account superintendent. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Construction of 1440 houses at lalithadripura mys?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Construction of 1440 houses at lalithadripura mys. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Construction of 1440 houses at lalithadripur to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.