ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / TANISHQ MANTHAN

Registered No litigation declared Residential / Group Housing project

TANISHQ MANTHAN

By TANISHQ PROPERTIES

RG-MH-21551 · RERA P52100029684 · Last updated on MahaRERA portal: 15 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 48 months
  • 4 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 48 months from the original
8 of 11Construction stages donefurthest along: Basement (if any), 0%
7 of 20Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 103 documents Report an error

TANISHQ MANTHAN is a Residential / Group Housing project by TANISHQ PROPERTIES in Pune, Maharashtra, registered with MahaRERA as P52100029684 on 26 Jun 2021. Possession is promised by 31 Dec 2026. The completion date has moved by 48 months from the original filing. 13 of the 20 units on this registration are recorded sold or booked, and 8 of 11 construction stages are filed complete.

At a glance

Project

  • NameTANISHQ MANTHAN
  • TypeResidential / Group Housing
  • Location
    • DUDULGAON
    • Pimpri Chinchawad (M Corp.)
    • Haveli
    • Pune
    • 412105
  • Pincode412105
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100029684
  • ReraGenie IDRG-MH-21551

Builder

  • NameTANISHQ PROPERTIES
  • Entity typePartnership
  • PartnersBALASAHEB DNYANOBA TALEKAR, AMOL MOHAN MATE
  • Declared earlier projects1 →

Key dates

this monthRegisteredJun 2021First promiseDec 2022Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on26 Jun 2021
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 31 Dec 2022)
  • Buildings1 building record
  • Documents filed103 files

Current status

65%13 of 20 units booked
100.0%Work done, per cost certificate

Figures as on 15 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
TANISHQ MANTHANNA5520020

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 15 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.

TANISHQ MANTHAN: 73% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 15 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership3

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area483 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on22 Jul 2025
LandownerVillageDistrict
KASHINATH PANDURANG PAWARPimpri Chinchawad (M Corp.)Pune
ARUN PANDURANG PAWAR-Pune
YASHWANT PANDURANG PAWAR-Pune

Approvals and building plan

Sanctioning authorityPIMPRI CHINCHWAD MUNICIPAL CORPORATION
Permissible FSI921.15
Proposed, not sanctioned921 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchRAHATANI
Estimated costRs 2.63 cr
Cost incurredRs 2.63 cr
Work done100.0%
BuildingWingEstimatedIncurred
TANISHQ MANTHANNARs 2.34 crRs 2.34 cr
-NARs 28.95 lakhRs 28.95 lakh

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSHREE ASSOCIATES
EngineerLAVESH BABUSAHEB PATOLE
EngineerAjit Gavhane
EngineerNikhil Mudholkar
Chartered AccountantCA VAIBHAV MODI
Chartered AccountantM. Chaudhari & Associates
Chartered AccountantPGMJ & ASSOCIATES
Chartered AccountantSumit Abattini & Company
PartnerRole in project
TANISHQ PROPERTIES-

Extensions applied for4

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100018315Dec 2022 → Dec 2024

Reason as filed by the promoterDue to Covid - 19 and shortage of manpower resources.

EXT52100013781Dec 2022 → Dec 2023

Reason as filed by the promoterDue to covid 19 and non availability of resources.

EXT52100025618Dec 2022 → Dec 2025

Reason as filed by the promoterThe construction of the project was not completed due to a shortage of funds, as the flats were not sold. Additionally, the delay in the drainage and water connections by the corporation further hindered progress. As a result, the project remains incomplete, and we are unable to apply for completion. Therefore, we are requesting an extension.

EA23122518938Dec 2022 → Dec 2026

Reason as filed by the promoterThere were liquidity issues and delays in funding. Labour and material shortages, along with disruptions in supply chains and workforce availability, are impacting construction timelines.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 14 Jun 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 14 Jun 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 14 Jun 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 14 Jun 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed103

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 103 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Final.pdf15 Jul 2026
Withdrawal Update Form 2File: Form 2 Final.pdf15 Jul 2026
Withdrawal Update Form 3File: Form 3 Q1 FY 2026-27 Final.pdf15 Jul 2026
Withdrawal Update Form 1File: Form-1 Architect Certificate.pdf23 Apr 2026
Withdrawal Update Form 2File: Form-2 Engineers Certificate.pdf23 Apr 2026
Withdrawal Update Form 3File: Form-3 CA Certificate.pdf23 Apr 2026
Withdrawal Update Form 1File: Form 1 Q3 FY 25-26.pdf3 Feb 2026
Withdrawal Update Form 1File: Form 1 Q3 FY 25-26.pdf3 Feb 2026
Withdrawal Update Form 2File: Form 2 Q3 FY 25-26.pdf3 Feb 2026
Withdrawal Update Form 2File: Form 2 Q3 FY 25-26.pdf3 Feb 2026
Withdrawal Update Form 3File: Form 3 Q3 FY 25-26.pdf3 Feb 2026
Withdrawal Update Form 3File: Form 3 Q3 FY 25-26.pdf3 Feb 2026
Form 2A (FY 2024-2025)File: Form 2A FY-25-26.pdf3 Feb 2026
Withdrawal Update Form 1File: Withdrawal Application Form1.pdf13 Nov 2025
Withdrawal Update Form 2File: Withdrawal Application Form2.pdf13 Nov 2025
Withdrawal Update Form 3File: Withdrawal Application Form3.pdf13 Nov 2025
Withdrawal Update Form 1File: Form 1 FY 2025-2026 Q1.pdf10 Nov 2025
Withdrawal Update Form 2File: Form 2 FY 2025-2026 Q1.pdf10 Nov 2025
Withdrawal Update Form 3File: Form 3 FY 2025-2026 Q1.pdf10 Nov 2025
Form 5 (FY 2024-2025)File: Rera Form 5 TP.pdf9 Oct 2025
Form 1File: FORM 1.pdf24 Jul 2025
Form 2File: FORM 2.pdf24 Jul 2025
Form 3File: Form 3 FY 2024-2025 Q4.pdf24 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD CIRCULAR.pdf24 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf13 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf13 May 2025
Disclosure of sold/ booked inventoryFile: SOLD CIRCULAR.pdf13 May 2025
Other - TechnicalFile: Sale Deed.pdf11 Mar 2025
Other - TechnicalFile: PERT Balance.pdf11 Mar 2025
Other - TechnicalFile: PERT Completion.pdf11 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 FY 23-24.pdf10 Mar 2025
Disclosure of sold/ booked inventoryFile: Sold Cir.pdf7 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q3 (FY 24-25) Final.pdf23 Jan 2025
Declaration in FORM BFile: Form B.pdf16 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 (Q3 FY 24-25).pdf16 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Qtr 3 ( Fy 24-25).pdf16 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold Circular Q3 (FY 24-25).pdf16 Jan 2025
CERSAI detailsFile: CERSAI.pdf13 Jan 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A.pdf13 Jan 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Final disclosure of int.pdf13 Jan 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Final disclosure of interest.pdf13 Jan 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Final Interest.pdf13 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q4 (FY 23-24)_compressed.pdf19 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q1 (FY 24-25)_compressed.pdf19 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q2 (FY 24-25)_compressed.pdf19 Dec 2024
Disclosure of sold/ booked inventoryFile: Sold Circular Q4 (FY 23-24).pdf19 Dec 2024
Disclosure of sold/ booked inventoryFile: Sold Circular Q1 (FY 24-25).pdf19 Dec 2024
Disclosure of sold/ booked inventoryFile: Sold Circular Q2 (FY 24-25).pdf19 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q4 (FY 23-24).pdf18 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q1 (FY 24-25).pdf18 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q2 (FY 2024-25).pdf18 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q2 (FY 24-25).pdf18 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q1 (FY 24-25).pdf18 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q4 (FY 23-24).pdf18 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A FY 23-24.pdf18 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Uploaded Form 5.pdf2 Mar 2024
Declaration in FORM BFile: AGREEMENT.pdf22 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 (Q3 FY 23 - 24).pdf22 Feb 2024
Disclosure of sold/ booked inventoryFile: Sold Circular (Q3 FY 22 - 23).pdf22 Feb 2024
Disclosure of sold/ booked inventoryFile: Sold Circular 29 (Q4 FY 22 - 23).pdf22 Feb 2024
Disclosure of sold/ booked inventoryFile: Sold Circular 29 (Q1 FY 23 - 24).pdf22 Feb 2024
Disclosure of sold/ booked inventoryFile: Sold Circular 29 (Q2 FY 23 - 24).pdf22 Feb 2024
Disclosure of sold/ booked inventoryFile: Sold Circular 29 (Q3 FY 23 - 24).pdf22 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 1 Form 3 (Q3 FY 22 - 23)_compressed.pdf22 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2 Form 3 (Q4 FY 22 - 23)_compressed.pdf22 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 Form 3 (Q1 FY 23 - 24)_compressed.pdf22 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 4 Form 3 (Q2 FY 23 - 24)_compressed.pdf22 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 5 Form 3 (Q3 FY 23 - 24)_compressed.pdf22 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 (Q4 FY 22 - 23).pdf7 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 (Q1 FY 23 - 24).pdf7 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 (Q2 FY 23 - 24).pdf7 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 (Q3 FY 23 - 24).pdf7 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A (FY 22 - 23).pdf7 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 (Q3 FY 22 - 23).pdf21 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 (Q4 FY 22 - 23).pdf21 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 (Q1 FY 23 - 24).pdf21 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 (Q2 FY 23 - 24).pdf21 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A (FY 22 - 23).pdf21 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 (Q3 FY 22 - 23).pdf20 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 (Q4 FY 22 - 23).pdf20 Dec 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 not delivered by the promised date
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Tanishq VlastaP52100002155Alandi Rural, Pune217Jul 2017OngoingDec 2025Registered original: Dec 2022Not delivered

How this compares with Pune

65%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 48 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep TANISHQ MANTHAN on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near DUDULGAON13,700+ in Pune

2 kmTANISHQ MANTHANCompleted 33Lapsed / revoked 21Other 47Dot size: filed unitsN

Filed coordinates, straight-line distance. 101 registered projects within 2 km.

Builder: TANISHQ PROPERTIES

TANISHQ PROPERTIES has 1 registration on MahaRERA, including TANISHQ MANTHAN. Its filings disclose 1 earlier MahaRERA project, none completed yet. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if TANISHQ MANTHAN is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of TANISHQ MANTHAN?

The registered promoter entity is TANISHQ PROPERTIES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in TANISHQ MANTHAN?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for TANISHQ MANTHAN?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at TANISHQ MANTHAN?

The professionals named in the filing: Architect: SHREE ASSOCIATES; Engineer: LAVESH BABUSAHEB PATOLE; Engineer: Ajit Gavhane; Engineer: Nikhil Mudholkar; Chartered Accountant: CA VAIBHAV MODI; Chartered Accountant: M. Chaudhari & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in TANISHQ MANTHAN?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About TANISHQ MANTHAN. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save TANISHQ MANTHAN to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.