Registration lapsed No litigation declared Residential / Group Housing project

TANDICE

By MANISH MAHESH DHOLAKIA

RG-MH-27131 · RERA P51800010353 · Last updated on MahaRERA portal: 13 Aug 2024

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 13 months past the filed date
  • Completion date moved by 74 months
  • 3 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Sep 2025Possession promised13 months past this date
2 of 11Construction stages donefurthest along: Slabs of Super Structure, 90%
0Complaints at MahaRERAon this registration
Jump to the 129 documents Report an error

TANDICE is a Residential / Group Housing project by MANISH MAHESH DHOLAKIA in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800010353 on 24 Aug 2017. Possession was promised by 30 Sep 2025 and is now 13 months past that date. The completion date has moved by 74 months from the original filing.

At a glance

Project

  • NameTANDICE
  • TypeResidential / Group Housing
  • Location
    • Borivali
    • Mumbai Suburban
    • 400067
  • Pincode400067
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800010353
  • ReraGenie IDRG-MH-27131

Builder

  • NameMANISH MAHESH DHOLAKIA
  • Entity typeIndividual
  • PartnersSONAL MANISH DHOLAKIA, MANISH MAHESH DHOLAKIA
  • Declared earlier projects1 →

Key dates

13 months past promisethis monthRegisteredAug 2017First promiseJul 2019Revised toSep 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on24 Aug 2017
  • Promised completion30 Sep 2025
  • Revised completionRevised to 30 Sep 2025 (originally 31 Jul 2019)
  • Buildings1 building record
  • Documents filed129 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
TANDICENA90000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 13 Aug 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 90%.

TANDICE: 54% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)70%
Podiums (if any)0%
Plinth70%
Stilt Floor100%
Slabs of Super Structure90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises65%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 13 Aug 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,502 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI2419.8
Proposed, not sanctioned2,420 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMUMBAI-MAHESHWARI MANSON NAPEANSEA ROAD

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectR R NIGAM
PartnerRole in project
MANISH MAHESH DHOLAKIA-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800003651Jul 2019 → Jul 2020

Reason as filed by the promoterAs per the details mentioned at the time of registration of the project at the Maharera Website we have mentioned 31.07.2019 as the project completion date. However, we were not able to complete the construction work since there was a lack of labour followed by demonitization. Hence, we would like to seek an extension period of one year for the completion of the said project ie. till 30.07.2020.

EXT51800009348Jul 2019 → Jan 2023

Reason as filed by the promoterThe Project has been delayed on account of various reasons beyond our control and more particularly due to Lockdown announced on account of pandemic of Covid-19. Due to this unprecedented crises, we have witnessed the reverse migration of labourers and liquidity crunch in the market. We are on the verge of completing the construction work and are hopeful that once we receive project extension we shall obtain Occupancy Certificate from the Competent Authority and complete the project in all aspects. We also have the required number of consents from the allottees.

EXT51800021924Jul 2019 → Sep 2025

Reason as filed by the promoterThe Project has been delayed on account of various reasons beyond our control and more particularly due to Lockdown announced on account of pandemic of Covid-19. Due to this unprecedented crises, we have witnessed the reverse migration of labourers and liquidity crunch in the market and struggling to find resources to complete the project. Now we have arranged the fund and Competed the Entire RCC and Finishing Work. We have following pending Work Lift installation, BMC water connection and compound beautification work we are hopeful that once we receive project extension we shall obtain Occupa

Litigation declared1

CaseCourtStatus
1965/2012DHINDHOSHI COURTSETTLEMENT CONSENT TERM TO BE EXECUTED

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 31 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed129

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 129 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Declaration in FORM BFile: Form-B Tendice.pdf13 Aug 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory list.pdf13 Aug 2024
Certificates of CA (Form 3)File: 23 Tandice Form-3 CA Cert-FY-23-24 Q4.pdf13 Aug 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 02-Tendice- Form-1-FY 17-18-Q3.pdf29 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 02-Tendice- Form-1-FY 17-18-Q4.pdf29 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 02-Tendice- Form-1-FY 18-19-Q1.pdf29 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 02-Tendice- Form-1-FY 18-19-Q2.pdf29 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 02-Tendice- Form-1-FY 18-19-Q3.pdf29 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 02-Tendice- Form-1-FY 18-19-Q4.pdf29 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 02-Tendice- Form-1-FY 19-20-Q1.pdf29 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 02-Tendice- Form-1-FY 19-20-Q2.pdf29 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 02-Tendice- Form-1-FY 19-20-Q3.pdf29 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 02-Tendice- Form-1-FY 19-20-Q4.pdf29 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 02-Tendice- Form-1-FY 20-21-Q1.pdf29 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 13-Tendice- Form-1-FY 20-21-Q2.pdf29 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 14-Tendice- Form-1-FY 20-21-Q3.pdf29 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 14-Tendice- Form-1-FY 20-21-Q3.pdf29 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 16-Tendice- Form-1-FY 21-22-Q1.pdf29 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 17-Tendice- Form-1-FY 21-22-Q2.pdf29 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 18-Tendice- Form-1-FY 21-22-Q3.pdf29 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 18-Tendice- Form-1-FY 21-22-Q3.pdf29 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 19-Tendice- Form-1-FY 21-22-Q4.pdf29 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 20-Tendice- Form-1-FY 22-23-Q1.pdf29 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 21-Tendice- Form-1-FY 22-23-Q2.pdf29 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 21-Tendice- Form-1-FY 22-23-Q2.pdf29 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 22-Tendice- Form-1-FY 22-23-Q3.pdf29 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 23-Tendice- Form-1-FY 22-23-Q4.pdf29 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 15-Tendice- Form-1-FY 20-21-Q4.pdf29 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 24-Tendice- Form-1-FY 23-24-Q1.pdf29 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 25-Tendice- Form-1-FY 23-24-Q2.pdf29 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 26-Tendice- Form-1-FY 23-24-Q3.pdf29 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 27-Tendice- Form-1-FY 23-24-Q4.pdf29 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Tandice Form-2 Q4 FY 23-24.pdf29 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Tandice Form-2 Q3 FY 23-24.pdf29 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A-Tandice-FY 2023-24.pdf29 Jul 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory list.pdf29 Jul 2024
CERSAI detailsFile: CERSAI_Search_Report_200315242389_For_Asset_Based_Search_30_07_2024_01_34_39_186.pdf29 Jul 2024
Proforma of Agreement for saleFile: 1 Proforma of aGREEMENT.pdf29 Jul 2024
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Formation declaration.pdf29 Jul 2024
Status of ConveyanceFile: Conveyance Declararion.pdf29 Jul 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Bank declaration on MM Cons Letter head.pdf29 Jul 2024
Other - FinanceFile: TANDICE LEGAL.pdf29 Jul 2024
Other - TechnicalFile: TANDICE LEGAL.pdf29 Jul 2024
Details of encumbrances concerned to FinanceFile: 1 Details of encumbrances (5).pdf28 Jul 2024
Details of encumbrances concerned to LegalFile: 1 Details of encumbrances (5).pdf28 Jul 2024
Declaration about Commencement CertificateFile: CC Declaration by promoter.pdf28 Jul 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Int in Other Real Estate Proj.pdf28 Jul 2024
Certificates of CA (Form 3)File: Tandice Form-3 CA Cert-FY-23-24 Q3.pdf4 Jun 2024
Certificates of CA (Form 3)File: Tandice Form-3 CA Cert-FY-23-24 Q3.pdf4 Jun 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Tandice form 2 - Q1 Fy 23-24.pdf15 Mar 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Tandice form 2 - Q2 Fy 23-24.pdf15 Mar 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Tandice form 2 - Q3 Fy 23-24.pdf15 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Certificate March 2020.pdf15 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Certificate March 2021.pdf15 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Certificate March 2022.pdf15 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Certificate March 2023.pdf15 Mar 2024
Certificates of CA (Form 3)File: 21 Tandice Form-3 CA Cert-FY-23-24 Q1.pdf15 Mar 2024
Certificates of CA (Form 3)File: 22 Tandice Form-3 CA Cert-FY-23-24 Q2.pdf15 Mar 2024
Certificates of CA (Form 3)File: 23 Tandice Form-3 CA Cert-FY-23-24 Q3.pdf15 Mar 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 1 Tandice form 2 Q4 Fy 17-18.pdf11 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2 Tandice form 2 Q1 Fy 18-19.pdf11 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 3 Tandice form 2 Q2 Fy 18-19.pdf11 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 4 Tandice form 2 Q3 Fy 18-19.pdf11 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 5 Tandice form 2 Q4 Fy 18-19.pdf11 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 6 Tandice form 2 Q1 Fy 19-20.pdf11 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 7 Tandice form 2 Q2 Fy 19-20.pdf11 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 8 Tandice form 2 Q3 Fy 19-20.pdf11 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 9 Tandice form 2 Q4 Fy 19-20.pdf11 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 10 Tandice form 2 Q1 Fy 20-21.pdf11 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 11 Tandice form 2 Q2 Fy 20-21.pdf11 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 12 Tandice form 2 Q3 Fy 20-21.pdf11 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 13 Tandice form 2 Q4 Fy 20-21.pdf11 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 14 Tandice form 2 Q1 Fy 21-22.pdf11 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 15 Tandice form 2 Q2 Fy 21-22.pdf11 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 16 Tandice form 2 Q3 Fy 21-22.pdf11 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 17 Tandice form 2 Q4 Fy 21-22.pdf11 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 18 Tandice form 2 Q1 Fy 22-23.pdf11 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 19 Tandice form 2 - Q2 Fy 22-23.pdf11 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 20 Tandice form 2 Q3 Fy 22-23.pdf11 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 21 tandice form 2 Q4 Fy 22-23.pdf11 Oct 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
GOVIND NAGAR CO-OP HSG SOCANDEHRI KURLA ROAD MUMBAI-400093255CompletedMar 2015Late, Feb 2016

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one moved by 74 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is among them

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep TANDICE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Borivali6,700+ in Mumbai Suburban

2 kmTANDICECompleted 112Lapsed / revoked 69Other 150Dot size: filed unitsN

Filed coordinates, straight-line distance. 331 registered projects within 2 km.

Builder: MANISH MAHESH DHOLAKIA

MANISH MAHESH DHOLAKIA has 1 registration on MahaRERA, including TANDICE. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What does it mean that TANDICE shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if TANDICE is delayed beyond 30 Sep 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of TANDICE?

The registered promoter entity is MANISH MAHESH DHOLAKIA, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in TANDICE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for TANDICE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at TANDICE?

The professionals named in the filing: Architect: R R NIGAM. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in TANDICE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About TANDICE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save TANDICE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.