Home / Browse projects / Nashik, Maharashtra / SYMPHONY CO-OP HOUSING SOCIETY
SYMPHONY CO-OP HOUSING SOCIETY
RG-MH-65869 · RERA P51600055437 · Last updated on MahaRERA portal: 16 Jun 2026
Source: official MahaRERA filing
Red flags
- Litigation declared, 2 cases
Clear
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SYMPHONY CO-OP HOUSING SOCIETY is a Mixed project by J B CONSTRUCTION in Nashik, Maharashtra, registered with MahaRERA as P51600055437 on 22 Mar 2024. The registration is recorded completed; possession was promised by 31 Dec 2026. 6 of the 42 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete.
At a glance
Project
- NameSYMPHONY CO-OP HOUSING SOCIETY
- TypeMixed
- Location
- NASHIK ROAD
- DHONGADE MALA
- Deolaligaon
- Nashik
- 422101
- Pincode422101
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51600055437
- ReraGenie IDRG-MH-65869
Builder
- NameJ B CONSTRUCTION
- Entity typePartnership
- PartnersNITIN MADHUKAR JAGALE, SWETA NIRMALKUMAR BHANDARI
- Other registrations3 more →
- Completed2 of 4
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on22 Mar 2024
- Promised completion31 Dec 2026
- Revised completionNone
- Buildings1 building record
- Documents filed78 files
Current status
Figures as on 16 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SYPHONY CO-OP HOUSING SOCIETY | NA | 8 | 8 | 29 | 12 | 41 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 16 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
6 of 11 construction stages are filed complete across 2 buildings. The stage furthest along is Staircases, at 80%.
SYPHONY CO-OP HOUSING SOCIETY68%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 80% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 60% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 5% |
NA Plot Without StructureNot stated
| Activity | Progress |
|---|---|
| Excavation | Not applicable |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | Not applicable |
| Sanitary Fittings within the flats / premises | Not applicable |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | Not applicable |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | Not applicable |
Progress on shared amenities15
As on 16 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed105
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| SYMPHONY CO-OP HOUSING SOCIETY | Deolaligaon | Nashik |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| SYPHONY CO-OP HOUSING SOCIETY | NA | Rs 5.00 cr | Rs 3.56 cr |
| - | NA | Rs 50,000 | - |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | ARCHANA N PEKHALE NITIN PEKHALE |
| Engineer | GANESH BHAUSAHEB KAWALE |
| Chartered Accountant | EKTA SINGHAL |
| Chartered Accountant | DILIP PANDURANG PALDE |
| Chartered Accountant | HARSHALI SUNIL MARATHE |
| Partner | Role in project |
|---|---|
| J B CONSTRUCTION | - |
Litigation declared2
| Case | Court | Status |
|---|---|---|
| 1248/2022 AND 21/2023/2022 | CIVIL JUDGE SR DIVISION NASHIK COURT | WE ATTEND TIME TO TIME |
| 1248/2022 | NASHIK COURT | Ongoing |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 8 Nov 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 8 Nov 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 8 Nov 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 8 Nov 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 16 Jun 2026
Documents filed78
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: FORM 1 ARCHITECT0326.pdf | 16 Jun 2026 |
| Withdrawal Update Form 2File: FORM 2 ENGG CERTIFIATE03226.pdf | 16 Jun 2026 |
| Withdrawal Update Form 3File: FORM 3 CA CERTIFICATE0326.pdf | 16 Jun 2026 |
| Occupational CertificateFile: COMPLETION CERTIFICATE_SYMPHONY.pdf | 16 Jun 2026 |
| Completion CertificateFile: COMPLETION CERTIFICATE_SYMPHONY.pdf | 16 Jun 2026 |
| Form 5 (FY 2024-2025)File: FORM 5 J B CONSTRUCTION.pdf | 26 Mar 2026 |
| Withdrawal Update Form 1File: FORM 1 ARCHITECT1225.pdf | 28 Jan 2026 |
| Withdrawal Update Form 2File: FORM 2 ENGG CERTIFICATE1225.pdf | 28 Jan 2026 |
| Withdrawal Update Form 3File: FORM 3 CA CERTIFICATE1225.pdf | 28 Jan 2026 |
| Withdrawal Update Form 1File: FORM 1 ARCHITECT.pdf | 12 Jan 2026 |
| Withdrawal Update Form 1File: FORM 1 ARCHITECT1225.pdf | 12 Jan 2026 |
| Withdrawal Update Form 2File: FORM 2 ENGG CERTIFICATE.pdf | 12 Jan 2026 |
| Withdrawal Update Form 2File: FORM 2 ENGG CERTIFICATE1225.pdf | 12 Jan 2026 |
| Withdrawal Update Form 3File: FORM 3 CA CERTIFICATE.pdf | 12 Jan 2026 |
| Withdrawal Update Form 3File: FORM 3 CA CERTIFICATE1225.pdf | 12 Jan 2026 |
| Form 5 (FY 2023-2024)File: FORM 5 ANNUAL REPORT FY 23-24.pdf | 21 Dec 2025 |
| Form 1File: FORM 1 ARCHITECT.pdf | 6 Nov 2025 |
| Form 2File: FORM 2 ENGG CERTIFICATE.pdf | 6 Nov 2025 |
| Form 3File: FORM 3 CA CERTIFICATE.pdf | 6 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: sold inventory.pdf | 6 Nov 2025 |
| Form 1File: FORM 1 ARCHITECT.pdf | 6 Nov 2025 |
| Form 2File: FORM 2 ENGG CERTIFICATE.pdf | 6 Nov 2025 |
| Form 3File: FORM 3 CA CERTIFICATE.pdf | 6 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: sold inventory.pdf | 6 Nov 2025 |
| Form 1File: FORM 1 ARCHITECT.pdf | 10 Jun 2025 |
| Form 2File: FORM 2 ENGG CERTIFICATE.pdf | 10 Jun 2025 |
| Form 3File: FORM 3 CA CERTIFICATE.pdf | 10 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD INVENTORY.pdf | 10 Jun 2025 |
| Form 1File: FORM 1 ARCHITECT.pdf | 18 May 2025 |
| Form 2File: FORM 2 ENGG CERTIFICATE.pdf | 18 May 2025 |
| Form 3File: FROM 3 CA CERTIFICATE.pdf | 18 May 2025 |
| Form 1File: FORM 1 ARCHITECT.pdf | 18 May 2025 |
| Form 2File: FROM 3 CA CERTIFICATE.pdf | 18 May 2025 |
| Form 3File: FORM 2 ENGG CERTIFICATE.pdf | 18 May 2025 |
| Form 1File: FORM 1 ARCHITECT.pdf | 18 May 2025 |
| Form 2File: FORM 2 ENGG CERTIFICATE.pdf | 18 May 2025 |
| Form 3File: FROM 3 CA CERTIFICATE.pdf | 18 May 2025 |
| Form 1File: FORM 2 ENGG CERTIFICATE.pdf | 18 May 2025 |
| Form 2File: FROM 3 CA CERTIFICATE.pdf | 18 May 2025 |
| Form 3File: FORM 1 ARCHITECT.pdf | 18 May 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 ANNUAL REPORT FY 23-24.pdf | 12 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT CERT.pdf | 25 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT CERT.pdf | 25 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT CERTI.pdf | 25 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE_11zon.pdf | 25 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA CERTIFICATE 0624_11zon (1).pdf | 25 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA CERTIFICATE 0924_11zon (1).pdf | 25 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGG Rera certificate_11zon.pdf | 25 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGG CERTIFICATE.pdf | 25 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGG CERTIFICATE.pdf | 25 Dec 2024 |
| Other - TechnicalFile: Declaration -cum-undertaking annexure A.pdf | 27 Feb 2024 |
| Other - LegalFile: Purchase deep Plot no 4.pdf | 7 Feb 2024 |
| Building plan approval or NA orderFile: PLAN 1.pdf | 8 Nov 2023 |
| Building plan approval or NA orderFile: PLAN 2.pdf | 8 Nov 2023 |
| Layout approvalFile: LAYOUT PLAN SYMPHONY.pdf | 8 Nov 2023 |
| PAN CardFile: PAN JB.pdf | 8 Nov 2023 |
| Copy of the legal title reportFile: TITLE.pdf | 8 Nov 2023 |
| Details of encumbrances concerned to FinanceFile: TO WHOMSOEVER IT MAY CONCERN.pdf | 8 Nov 2023 |
| Details of encumbrances concerned to LegalFile: TO WHOMSOEVER IT MAY CONCERN.pdf | 8 Nov 2023 |
| Copy of Layout Approval (in case of layout)File: LAYOUT PLAN SYMPHONY.pdf | 8 Nov 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: PLAN 1.pdf | 8 Nov 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: PLAN 2.pdf | 8 Nov 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement certificate.pdf | 8 Nov 2023 |
| Declaration about Commencement CertificateFile: Declaration about commencement certificate.pdf | 8 Nov 2023 |
| Declaration in FORM BFile: FORM B.pdf | 8 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf | 8 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate.pdf | 8 Nov 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: From 2A.pdf | 8 Nov 2023 |
| CERSAI detailsFile: CERSAI_Search_Report_200286995023_For_Asset_Based_Search_16_11_2023_21_51_08_470.pdf | 8 Nov 2023 |
| CERSAI detailsFile: LETTER OF UNDERTAKING.pdf | 8 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA CETRIFICATE.pdf | 8 Nov 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Other Real Estate Projects.pdf | 8 Nov 2023 |
| Proforma of Agreement for saleFile: AGREEMENT FOR SALE DRAFT-MARATHI.pdf | 8 Nov 2023 |
| Proforma of Allotment letterFile: Model copy of Allotment letter.pdf | 8 Nov 2023 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: REGD CERTIFICATE SYMPHONY.pdf | 8 Nov 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration about separate bank account for real estate projets.pdf | 8 Nov 2023 |
| Deviation Report with respect to Allotment letterFile: deviation for allotment letter.pdf | 8 Nov 2023 |
| Deviation Report with respect to model copy of AgreementFile: DEVIATION REPORT.pdf | 8 Nov 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nashik
Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.
Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 3 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 78 filed documents as one ZIP, foldered, with a manifest
Keep SYMPHONY CO-OP HOUSING SOCIETY on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near DHONGADE MALA4,100+ in Nashik
Filed coordinates, straight-line distance. 76 registered projects within 2 km.
The Exchange
Viraj Estates Pvt. Ltd. & Others
HARI SANSKRUTI PHASE II
KBC GLOBAL LIMITED
ARRPAN HOUSING
A C JAIN BUILDERS AND DEVELOPERS LLP
Shilpa Madhuvan
Shilpa Estate
STAR PLUS B
DEEPAK KALYANJI CHANDE
SKY ONE
OM SAI OM BUILDERS
See every Nashik project, with the district possession charts
Builder: J B CONSTRUCTION
J.B.Construction has 4 registrations on MahaRERA, including Govind Villa and SYMPHONY CO-OP HOUSING SOCIETY. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Nashik district page.
Frequently asked questions
What are my rights if SYMPHONY CO-OP HOUSING SOCIETY is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SYMPHONY CO-OP HOUSING SOCIETY?
The registered promoter entity is J B CONSTRUCTION, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SYMPHONY CO-OP HOUSING SOCIETY?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SYMPHONY CO-OP HOUSING SOCIETY?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SYMPHONY CO-OP HOUSING SOCIETY?
The professionals named in the filing: Architect: ARCHANA N PEKHALE NITIN PEKHALE; Engineer: GANESH BHAUSAHEB KAWALE; Chartered Accountant: EKTA SINGHAL; Chartered Accountant: DILIP PANDURANG PALDE; Chartered Accountant: HARSHALI SUNIL MARATHE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SYMPHONY CO-OP HOUSING SOCIETY?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback