Home / Browse projects / Sangli, Maharashtra / SWAYAMBHU JEWELS
SWAYAMBHU JEWELS
By SWAYAMBHU SIDDHI DEVELOPERS
RG-MH-63164 · RERA P53100048449 · Last updated on MahaRERA portal: 23 Jun 2025
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.
See what the report covers Free either way: or have every new Sangli registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SWAYAMBHU JEWELS is a Others project by SWAYAMBHU SIDDHI DEVELOPERS in Sangli, Maharashtra, registered with MahaRERA as P53100048449 on 3 Jan 2023. The registration is recorded completed; possession was promised by 31 Dec 2026.
At a glance
Project
- NameSWAYAMBHU JEWELS
- TypeOthers
- Location
- SOUTH SHIVAJINAGAR SANGLI
- CHADANI CHOWK
- Sangli Miraj Kupwad (M Corp.)
- Miraj
- Sangli
- 416416
- Pincode416416
- MapView location on Google Maps (as filed on RERA)
- RERA no.P53100048449
- ReraGenie IDRG-MH-63164
Builder
- NameSWAYAMBHU SIDDHI DEVELOPERS
- Entity typePartnership
- GSTIN27AEFFS7562E1ZS
- Partnersvandana radhakisan dodiya, aarti rahul dodiya, nikhil vijay nawandhar, niraj vijay nawandhar, namrata shaillesh pawar
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on3 Jan 2023
- Promised completion31 Dec 2026
- Revised completionNone
- Buildings1 building record
- Documents filed77 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SWAYAMBHU JEWELS | NA | 6 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 23 Jun 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
5 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 95%.
SWAYAMBHU JEWELS: 81% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 90% |
| Sanitary Fittings within the flats / premises | 95% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 95% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 95% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 15% |
Progress on shared amenities15
As on 23 Jun 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed18
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | AMBER SHINDE |
| Engineer | akshay sarjerao hakke |
| Chartered Accountant | AMIT ANIL SHENDE |
| Chartered Accountant | SHIVAM SANCHETI |
| Partner | Role in project |
|---|---|
| SWAYAMBHU SIDDHI DEVELOPERS | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 29 Nov 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 29 Nov 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 12 Jul 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 12 Jul 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed77
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Other - TechnicalFile: Maharera letter .pdf | 23 Jun 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2024-25)File: Form 5 - Swayambhu Siddhi Developers - FY 2024-25.pdf | 23 Jun 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT CERTIFICATE.pdf | 7 Jun 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT CERTIFICATE.pdf | 7 Jun 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTI MARCH25_compressed.pdf | 7 Jun 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 MARCH25.pdf | 7 Jun 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD MARCH 25.pdf | 7 Jun 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architects Certificate dec24.pdf | 6 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A CERTIFICATE.pdf | 6 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng certificate Dec 24_compressed.pdf | 6 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: Sold unsold dec24_compressed.pdf | 6 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 30062024.pdf | 31 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 30092024.pdf | 31 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 30062024.pdf | 31 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 30092024.pdf | 31 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 30062024.pdf | 31 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 30092024.pdf | 31 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD 30062024.pdf | 31 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD 30092024.pdf | 31 Dec 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A 23 24.pdf | 31 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 23 24.pdf | 31 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM - 1 ARCTITECT CERTIFICATE 30 SEP 2023.pdf | 25 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 ARCHITECT CERTIFICATE 31 DEC 2023.pdf | 25 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 31032024.pdf | 25 May 2024 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE SOLD UNSOLD.pdf | 25 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE.pdf | 25 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2- 31-12-23 add name.pdf | 24 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 -31 032024 add name.pdf | 24 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM - 1 ARCTITECT CERTIFICATE 30 SEP 2023.pdf | 6 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: DISCLOSURE SOLD BOOKED INVENTRY 31122023.pdf | 6 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM - 2 UPTO 30 SEP 2023.pdf | 6 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE SOLD BOOKED INVENTRY 30092023.pdf | 6 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE SOLD BOOKED INVENTRY 31122023.pdf | 6 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM - 3 UPTO 30 SEP2023.pdf | 6 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 UPTO 31 DEC 2023.pdf | 6 Feb 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: FORMAT- A.pdf | 6 Feb 2024 |
| Other - FinanceFile: SELF DECLARATION ABOUT TRANSFAR.pdf | 6 Feb 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2 A 22-23.pdf | 29 Sep 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM5 FY 22-23 (1).pdf | 29 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE 30062023_Page_1_compressed.pdf | 20 Sep 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM -2 ENGINEER CERT 30062023.pdf | 20 Sep 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2 A QUALITY ASSURANCE.pdf | 20 Sep 2023 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD 30062023.pdf | 20 Sep 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM -3 C A CERTIFICATE 30062023.pdf | 20 Sep 2023 |
| Building plan approvalFile: DWG_compressed (1).pdf | 12 Jul 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: DWG_compressed (1).pdf | 12 Jul 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: BUILDING PERMISSION CERTIFICATE.pdf | 12 Jul 2023 |
| Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMENT CERTIFICATE REVISED.pdf | 12 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate.pdf | 12 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFICATE.pdf | 12 Jul 2023 |
| Disclosure of sold/ booked inventoryFile: disclosure of sold.pdf | 12 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A CERTIFICATE.pdf | 12 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A CERTIFICATE.pdf | 12 Jul 2023 |
| Other - FinanceFile: DECLARATION CUM UNDERTAKING BANK.pdf | 12 Jul 2023 |
| Other - LegalFile: LEGAL TITLE REPORT.pdf | 21 Dec 2022 |
| Details of encumbrances concerned to FinanceFile: no encumbrance certificate - finacial.pdf | 8 Dec 2022 |
| Details of encumbrances concerned to FinanceFile: no encumbrance certificate - legal.pdf | 8 Dec 2022 |
| Details of encumbrances concerned to LegalFile: no encumbrance certificate - finacial.pdf | 8 Dec 2022 |
| Details of encumbrances concerned to LegalFile: no encumbrance certificate - legal.pdf | 8 Dec 2022 |
| Layout approvalFile: dwg 02.pdf | 29 Nov 2022 |
| Building plan approvalFile: dwg.pdf | 29 Nov 2022 |
| PAN CardFile: firm pan.pdf | 29 Nov 2022 |
| Copy of the legal title reportFile: legal search report.pdf | 29 Nov 2022 |
| Copy of Layout Approval (in case of layout)File: dwg 02.pdf | 29 Nov 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: dwg.pdf | 29 Nov 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: building permission 1.pdf | 29 Nov 2022 |
| Declaration about Commencement CertificateFile: declaration about commencement certificate.pdf | 29 Nov 2022 |
| Declaration in FORM BFile: form b.pdf | 29 Nov 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate.pdf | 29 Nov 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf | 29 Nov 2022 |
| CERSAI detailsFile: cersai report_compressed.pdf | 29 Nov 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: c a certificate.pdf | 29 Nov 2022 |
| Proforma of Agreement for saleFile: agreement to sale.pdf | 29 Nov 2022 |
| Proforma of Allotment letterFile: ALLOTMENT LATTER FINAL 1.pdf | 29 Nov 2022 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: format a.pdf | 29 Nov 2022 |
| Deviation Report with respect to Allotment letterFile: no deviation certificate allotment.pdf | 29 Nov 2022 |
| Deviation Report with respect to model copy of AgreementFile: NO DEVIATION CERTIFICATE MODEL AGREEMENT.pdf | 29 Nov 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Sangli
Computed across the 790+ Sangli projects on ReraGenie, from their own filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 77 filed documents as one ZIP, foldered, with a manifest
Keep SWAYAMBHU JEWELS on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near CHADANI CHOWK790+ in Sangli
Filed coordinates, straight-line distance. 163 registered projects within 2 km.
SIDDHI VASTU Puram
SIDDHIVINAYAK PLATINUM
SEVEN HILLS
SHRI HARIPRIYA BUILDERS AND DEVELOPERS LLP
EVARA ESTATE
DSDB REALTY LLP
VISION CITY
VISION GROUP
NAKSHTRA
SHIV-NAKSHTRA DEVELOPERS LLP
SAHYADRISIDDHI
SAHYADRIDEVELOPERS
See every Sangli project, with the district possession charts
Builder: SWAYAMBHU SIDDHI DEVELOPERS
SWAYAMBHU SIDDHI DEVELOPERS has 1 registration on MahaRERA, including SWAYAMBHU JEWELS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Sangli district page.
Frequently asked questions
What are my rights if SWAYAMBHU JEWELS is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SWAYAMBHU JEWELS?
The registered promoter entity is SWAYAMBHU SIDDHI DEVELOPERS, a partnership as per the filing. Its GSTIN 27AEFFS7562E1ZS can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SWAYAMBHU JEWELS?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SWAYAMBHU JEWELS?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SWAYAMBHU JEWELS?
The professionals named in the filing: Architect: AMBER SHINDE; Engineer: akshay sarjerao hakke; Chartered Accountant: AMIT ANIL SHENDE; Chartered Accountant: SHIVAM SANCHETI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SWAYAMBHU JEWELS?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback