ReraGenieLog inGet a buyer report

Home / Browse projects / Sangli, Maharashtra / SWAYAMBHU JEWELS

Completed No litigation declared Others project

SWAYAMBHU JEWELS

By SWAYAMBHU SIDDHI DEVELOPERS

RG-MH-63164 · RERA P53100048449 · Last updated on MahaRERA portal: 23 Jun 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Sangli registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedregistration recorded completed
5 of 11Construction stages donefurthest along: Sanitary Fittings within the flats /..., 95%
0Complaints at MahaRERAon this registration
Jump to the 77 documents Report an error

SWAYAMBHU JEWELS is a Others project by SWAYAMBHU SIDDHI DEVELOPERS in Sangli, Maharashtra, registered with MahaRERA as P53100048449 on 3 Jan 2023. The registration is recorded completed; possession was promised by 31 Dec 2026.

At a glance

Project

  • NameSWAYAMBHU JEWELS
  • TypeOthers
  • Location
    • SOUTH SHIVAJINAGAR SANGLI
    • CHADANI CHOWK
    • Sangli Miraj Kupwad (M Corp.)
    • Miraj
    • Sangli
    • 416416
  • Pincode416416
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P53100048449
  • ReraGenie IDRG-MH-63164

Builder

  • NameSWAYAMBHU SIDDHI DEVELOPERS
  • Entity typePartnership
  • GSTIN27AEFFS7562E1ZS
  • Partnersvandana radhakisan dodiya, aarti rahul dodiya, nikhil vijay nawandhar, niraj vijay nawandhar, namrata shaillesh pawar

Key dates

this monthRegisteredJan 2023PromisedDec 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on3 Jan 2023
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed77 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SWAYAMBHU JEWELSNA60000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 23 Jun 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 95%.

SWAYAMBHU JEWELS: 81% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.15%

Progress on shared amenities15

As on 23 Jun 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed18

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots18
Closed/Covered13
Open Space5

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area506 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on30 Sep 2024

Approvals and building plan

Sanctioning authoritysangli miraj kupwad municipal corporation
Permissible FSI2019.72
Proposed, not sanctioned1,293 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKARMVEER CHOWK SANGLI

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAMBER SHINDE
Engineerakshay sarjerao hakke
Chartered AccountantAMIT ANIL SHENDE
Chartered AccountantSHIVAM SANCHETI
PartnerRole in project
SWAYAMBHU SIDDHI DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Nov 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Nov 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 12 Jul 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 Jul 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed77

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Other - TechnicalFile: Maharera letter .pdf23 Jun 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2024-25)File: Form 5 - Swayambhu Siddhi Developers - FY 2024-25.pdf23 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT CERTIFICATE.pdf7 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT CERTIFICATE.pdf7 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTI MARCH25_compressed.pdf7 Jun 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 MARCH25.pdf7 Jun 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD MARCH 25.pdf7 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architects Certificate dec24.pdf6 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A CERTIFICATE.pdf6 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng certificate Dec 24_compressed.pdf6 Mar 2025
Disclosure of sold/ booked inventoryFile: Sold unsold dec24_compressed.pdf6 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 30062024.pdf31 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 30092024.pdf31 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 30062024.pdf31 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 30092024.pdf31 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 30062024.pdf31 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 30092024.pdf31 Dec 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD 30062024.pdf31 Dec 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD 30092024.pdf31 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A 23 24.pdf31 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 23 24.pdf31 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM - 1 ARCTITECT CERTIFICATE 30 SEP 2023.pdf25 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 ARCHITECT CERTIFICATE 31 DEC 2023.pdf25 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 31032024.pdf25 May 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE SOLD UNSOLD.pdf25 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE.pdf25 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2- 31-12-23 add name.pdf24 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 -31 032024 add name.pdf24 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM - 1 ARCTITECT CERTIFICATE 30 SEP 2023.pdf6 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: DISCLOSURE SOLD BOOKED INVENTRY 31122023.pdf6 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM - 2 UPTO 30 SEP 2023.pdf6 Feb 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE SOLD BOOKED INVENTRY 30092023.pdf6 Feb 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE SOLD BOOKED INVENTRY 31122023.pdf6 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM - 3 UPTO 30 SEP2023.pdf6 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 UPTO 31 DEC 2023.pdf6 Feb 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: FORMAT- A.pdf6 Feb 2024
Other - FinanceFile: SELF DECLARATION ABOUT TRANSFAR.pdf6 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2 A 22-23.pdf29 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM5 FY 22-23 (1).pdf29 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE 30062023_Page_1_compressed.pdf20 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM -2 ENGINEER CERT 30062023.pdf20 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2 A QUALITY ASSURANCE.pdf20 Sep 2023
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD 30062023.pdf20 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM -3 C A CERTIFICATE 30062023.pdf20 Sep 2023
Building plan approvalFile: DWG_compressed (1).pdf12 Jul 2023
Building Plan Approval / NA Order for plotted developmentFile: DWG_compressed (1).pdf12 Jul 2023
Commencement Certificates / NA Order for plotted developmentFile: BUILDING PERMISSION CERTIFICATE.pdf12 Jul 2023
Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMENT CERTIFICATE REVISED.pdf12 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate.pdf12 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFICATE.pdf12 Jul 2023
Disclosure of sold/ booked inventoryFile: disclosure of sold.pdf12 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A CERTIFICATE.pdf12 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A CERTIFICATE.pdf12 Jul 2023
Other - FinanceFile: DECLARATION CUM UNDERTAKING BANK.pdf12 Jul 2023
Other - LegalFile: LEGAL TITLE REPORT.pdf21 Dec 2022
Details of encumbrances concerned to FinanceFile: no encumbrance certificate - finacial.pdf8 Dec 2022
Details of encumbrances concerned to FinanceFile: no encumbrance certificate - legal.pdf8 Dec 2022
Details of encumbrances concerned to LegalFile: no encumbrance certificate - finacial.pdf8 Dec 2022
Details of encumbrances concerned to LegalFile: no encumbrance certificate - legal.pdf8 Dec 2022
Layout approvalFile: dwg 02.pdf29 Nov 2022
Building plan approvalFile: dwg.pdf29 Nov 2022
PAN CardFile: firm pan.pdf29 Nov 2022
Copy of the legal title reportFile: legal search report.pdf29 Nov 2022
Copy of Layout Approval (in case of layout)File: dwg 02.pdf29 Nov 2022
Building Plan Approval / NA Order for plotted developmentFile: dwg.pdf29 Nov 2022
Commencement Certificates / NA Order for plotted developmentFile: building permission 1.pdf29 Nov 2022
Declaration about Commencement CertificateFile: declaration about commencement certificate.pdf29 Nov 2022
Declaration in FORM BFile: form b.pdf29 Nov 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate.pdf29 Nov 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf29 Nov 2022
CERSAI detailsFile: cersai report_compressed.pdf29 Nov 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: c a certificate.pdf29 Nov 2022
Proforma of Agreement for saleFile: agreement to sale.pdf29 Nov 2022
Proforma of Allotment letterFile: ALLOTMENT LATTER FINAL 1.pdf29 Nov 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: format a.pdf29 Nov 2022
Deviation Report with respect to Allotment letterFile: no deviation certificate allotment.pdf29 Nov 2022
Deviation Report with respect to model copy of AgreementFile: NO DEVIATION CERTIFICATE MODEL AGREEMENT.pdf29 Nov 2022

How this compares with Sangli

11%of Sangli projects moved their completion datethis one has not
29%of Sangli registrations have lapsed or been cancelledthis one is completed

Computed across the 790+ Sangli projects on ReraGenie, from their own filings.

Keep SWAYAMBHU JEWELS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near CHADANI CHOWK790+ in Sangli

2 kmSWAYAMBHU JEWELSCompleted 81Lapsed / revoked 51Other 31Dot size: filed unitsN

Filed coordinates, straight-line distance. 163 registered projects within 2 km.

Builder: SWAYAMBHU SIDDHI DEVELOPERS

SWAYAMBHU SIDDHI DEVELOPERS has 1 registration on MahaRERA, including SWAYAMBHU JEWELS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Sangli district page.

Frequently asked questions

What are my rights if SWAYAMBHU JEWELS is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SWAYAMBHU JEWELS?

The registered promoter entity is SWAYAMBHU SIDDHI DEVELOPERS, a partnership as per the filing. Its GSTIN 27AEFFS7562E1ZS can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SWAYAMBHU JEWELS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SWAYAMBHU JEWELS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SWAYAMBHU JEWELS?

The professionals named in the filing: Architect: AMBER SHINDE; Engineer: akshay sarjerao hakke; Chartered Accountant: AMIT ANIL SHENDE; Chartered Accountant: SHIVAM SANCHETI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SWAYAMBHU JEWELS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SWAYAMBHU JEWELS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SWAYAMBHU JEWELS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.