Home / Browse projects / Pune, Maharashtra / SWARGANDHAR PHASE 2 A1,A2,A3,B1,B2,B3,B4,B5,C1
SWARGANDHAR PHASE 2 A1,A2,A3,B1,B2,B3,B4,B5,C1
By VAIBHAV CLASSIC BUILDERS AND DEVELOPERS
RG-MH-11998 · RERA P52100004672 · Last updated on MahaRERA portal: 27 Nov 2025
Source: official MahaRERA filing
Red flags
- Completion date moved by 30 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SWARGANDHAR PHASE 2 A1,A2,A3,B1,B2,B3,B4,B5,C1 is a Residential / Group Housing project by VAIBHAV CLASSIC BUILDERS AND DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100004672 on 9 Aug 2017. The registration is recorded completed; possession was promised by 30 Jun 2022. The completion date has moved by 30 months from the original filing.
At a glance
Project
- NameSWARGANDHAR PHASE 2 A1,A2,A3,B1,B2,B3,B4,B5,C1
- TypeResidential / Group Housing
- Location
- Uruli Kanchan
- Haveli
- Pune
- 412202
- Pincode412202
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100004672
- ReraGenie IDRG-MH-11998
Builder
- NameVAIBHAV CLASSIC BUILDERS AND DEVELOPERS
- Entity typePartnership
- PartnersANIL GULABRAO PAWAR, SAHELI PROPERTIES LLP, VAIBHAV PRAKASH LONDHE, VIJAYA PRAKASH LONDHE, RAKESH SUNIL PAWAR, NISHAD ANIL PAWAR
- Other registrations2 more →
- Completed2 of 3
- No longer live1 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on9 Aug 2017
- Promised completion30 Jun 2022
- Revised completionRevised to 30 Jun 2022 (originally 31 Dec 2019)
- Buildings9 building records
- Documents filed142 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A1 | NA | 5 | 0 | 0 | 0 | 0 |
| A2 | NA | 5 | 0 | 0 | 0 | 0 |
| A3 | NA | 5 | 0 | 0 | 0 | 0 |
| B1 | NA | 5 | 0 | 0 | 0 | 0 |
| B2 | NA | 5 | 0 | 0 | 0 | 0 |
| B3 | NA | 5 | 0 | 0 | 0 | 0 |
| B4 | NA | 5 | 0 | 0 | 0 | 0 |
| B5 | NA | 5 | 0 | 0 | 0 | 0 |
| C1 | NA | 5 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building9
As on 27 Nov 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
44 of 99 construction stages are filed complete across 9 buildings. The stage furthest along is Basement (if any), at 50%.
A118%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 50% |
| Podiums (if any) | 0% |
| Plinth | 50% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
A227%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
A356%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 15% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
B164%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
B264%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
B364%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
B432%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 50% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
B532%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 50% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
C164%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 27 Nov 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 15% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 100% |
Land and ownership10
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| SANJAY NARAYAN DAREKAR | Uruli Kanchan | Pune |
| DATTATRAY BHAGWAN DAREKAR | Uruli Kanchan | Pune |
| POPAT BABURAO KANCHAN | Uruli Kanchan | Pune |
| DATTATRAY BABURAO KANCHAN | Uruli Kanchan | Pune |
| NARSINGH BABURAO KANCHAN | Uruli Kanchan | Pune |
| JAYSINGH BABURAO KANCHAN | Uruli Kanchan | Pune |
| RAJARAM BHOLU KANCHAN | Uruli Kanchan | Pune |
| SWARUP JANARDAN KANCHAN | Uruli Kanchan | Pune |
| AABASO BHAGWAN KANCHAN | Uruli Kanchan | Pune |
| BABURAO KONDIBA KANCHAN | Uruli Kanchan | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | RAJENDRA DAGDU HARALE |
| Engineer | GA BHILARE |
| Partner | Role in project |
|---|---|
| VAIBHAV CLASSIC BUILDERS AND DEVELOPERS | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterThe construction of the buildings are complete but due to shortage of labour in the months of November , December and January and subsequently due to pandemics and also as the project is being developed in three phases, Amenities such as the STP plant, Open Spaces and Rain Water Harvesting Systems were work in progress due to which partial completion certificate was not issued for Phase 1 of the said project "Swargandhar".
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 27 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 27 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 27 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 27 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 26 Mar 2024
Documents filed142
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 142 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: f1 sep 17.pdf | 27 Nov 2025 |
| Form 2File: SEP 17.pdf | 27 Nov 2025 |
| Form 3File: P2 SEP 17.pdf | 27 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: DISC P2 SEP 17.pdf | 27 Nov 2025 |
| Form 1File: F1 MAR 18 P2.pdf | 27 Nov 2025 |
| Form 2File: MAR 18.pdf | 27 Nov 2025 |
| Form 3File: P2 MAR 18.pdf | 27 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: DISC P2 MAR 18.pdf | 27 Nov 2025 |
| Form 1File: F1 JUNE 18 P2.pdf | 27 Nov 2025 |
| Form 2File: f2 JUNE 18.pdf | 27 Nov 2025 |
| Form 3File: P2 JUNE 18.pdf | 27 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: DISC P2 JUNE 18.pdf | 27 Nov 2025 |
| Form 1File: F1 SEP 18 P2.pdf | 27 Nov 2025 |
| Form 2File: F2 SEP 18.pdf | 27 Nov 2025 |
| Form 3File: F3 P2 SEP 18.pdf | 27 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: DISC P2 SEP 18.pdf | 27 Nov 2025 |
| Form 1File: F1 DEC18 P2.pdf | 27 Nov 2025 |
| Form 2File: F2 DEC 18.pdf | 27 Nov 2025 |
| Form 3File: P2 DEC 18.pdf | 27 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: DISC P2 DEC 18.pdf | 27 Nov 2025 |
| Form 1File: f1 mar 19 p2.pdf | 27 Nov 2025 |
| Form 2File: f2 MAR 19.pdf | 27 Nov 2025 |
| Form 3File: P2 MAR 19.pdf | 27 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: DISC P2 MAR 19.pdf | 27 Nov 2025 |
| Form 1File: F1 SEP 19 P2.pdf | 27 Nov 2025 |
| Form 2File: F2 SEP 19.pdf | 27 Nov 2025 |
| Form 3File: P2 SEP 19.pdf | 27 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: DISC P2 SEP 19.pdf | 27 Nov 2025 |
| Form 1File: F1 DEC 19 P2.pdf | 27 Nov 2025 |
| Form 2File: F2 DEC 19.pdf | 27 Nov 2025 |
| Form 3File: P2 DEC19.pdf | 27 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: DISCO P2 DEC 19.pdf | 27 Nov 2025 |
| Form 1File: f1 june 19 p2.pdf | 27 Nov 2025 |
| Form 2File: F2 JUNE 19.pdf | 27 Nov 2025 |
| Form 3File: F3 P2 JUNE 19.pdf | 27 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: DISC P2 JUNE 19.pdf | 27 Nov 2025 |
| Form 1File: F1 MAR 20 P2.pdf | 27 Nov 2025 |
| Form 2File: F2 MAR 20.pdf | 27 Nov 2025 |
| Form 3File: P2 MAR 20.pdf | 27 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: DISC P2 MAR 20.pdf | 27 Nov 2025 |
| Form 1File: F1 JUNE 20 P2.pdf | 27 Nov 2025 |
| Form 2File: F2 JUNE 20.pdf | 27 Nov 2025 |
| Form 3File: P2 JUNE 20.pdf | 27 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: DISC P2 JUNE 20.pdf | 27 Nov 2025 |
| Form 1File: F1 SEP 20 P2.pdf | 27 Nov 2025 |
| Form 2File: F2 SEP 20.pdf | 27 Nov 2025 |
| Form 3File: P2 SEP20.pdf | 27 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: DISC P2 SEP 20.pdf | 27 Nov 2025 |
| Form 1File: F1 DEC 20 P2.pdf | 27 Nov 2025 |
| Form 2File: F2 DEC 20.pdf | 27 Nov 2025 |
| Form 3File: P2 DEC 20.pdf | 27 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: DISC P2 DEC 20.pdf | 27 Nov 2025 |
| Form 1File: F1 MAR 21 P2.pdf | 27 Nov 2025 |
| Form 2File: F2 MAR 21.pdf | 27 Nov 2025 |
| Form 3File: P2 MAR21.pdf | 27 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: DISC P2 MAR 21.pdf | 27 Nov 2025 |
| Form 1File: F1 SEP 21 P2.pdf | 27 Nov 2025 |
| Form 2File: F2 SEP 21.pdf | 27 Nov 2025 |
| Form 3File: P2 SEP 21.pdf | 27 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: DISC P2 SEP 21.pdf | 27 Nov 2025 |
| Form 1File: F1 DEC 21 P2.pdf | 27 Nov 2025 |
| Form 2File: F2 DEC 21.pdf | 27 Nov 2025 |
| Form 3File: P2 DEC 21.pdf | 27 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: DISC P2 DEC 21.pdf | 27 Nov 2025 |
| Form 1File: F1 MAR 22 P2.pdf | 27 Nov 2025 |
| Form 2File: F2 MAR 22.pdf | 27 Nov 2025 |
| Form 3File: P2 MAR 22.pdf | 27 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: MAR 22 DISC.pdf | 27 Nov 2025 |
| Form 1File: F1 JUNE 22 P2.pdf | 27 Nov 2025 |
| Form 2File: JUNE 22.pdf | 27 Nov 2025 |
| Form 3File: P2 JUNE 22.pdf | 27 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: DISC JUNE 22.pdf | 27 Nov 2025 |
| Form 1File: F1 JUNE 21 P2.pdf | 27 Nov 2025 |
| Form 2File: F2 JUNE 21.pdf | 27 Nov 2025 |
| Form 3File: P2 JUNE 21.pdf | 27 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: DISC JUNE 21.pdf | 27 Nov 2025 |
| Form 1File: F1 DEC 17 P2.pdf | 26 Nov 2025 |
| Form 2File: F2 DEC 17.pdf | 26 Nov 2025 |
| Form 3File: P2 DEC 17.pdf | 26 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: DISC P2 DEC 17.pdf | 26 Nov 2025 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 2 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 142 filed documents as one ZIP, foldered, with a manifest
Keep SWARGANDHAR PHASE 2 A1,A2,A3,B1,B2,B3,B4,B5, on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Uruli Kanchan13,700+ in Pune
Filed coordinates, straight-line distance. 20 registered projects within 2 km.
Green Fantasy Phase-I
Shree Mangalmurti Associates Phase-I
24 KOREGAON GREENS
OBEROI INFRA CONSULTANT LLP
Chintamani Paradise
01/04/2017
Emerald City
Suresh kanchan & other 5
KANCHAN CITY
MR. SANJAY ABASAHEB KANCHAN AND OTHER - 1
GOKUL VILLA
GOKUL VILLA
Builder: VAIBHAV CLASSIC BUILDERS AND DEVELOPERS
VAIBHAV CLASSIC BUILDERS AND DEVELOPERS has 3 registrations on MahaRERA, including SWARGANDHAR PHASE 1 A4,A5,A6,A7,B6,B7 and SWARGANDHAR PHASE 2 A1,A2,A3,B1,B2,B3,B4,B5,C1. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if SWARGANDHAR PHASE 2 A1,A2,A3,B1,B2,B3,B4,B5,C1 is delayed beyond 30 Jun 2022?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SWARGANDHAR PHASE 2 A1,A2,A3,B1,B2,B3,B4,B5,C1?
The registered promoter entity is VAIBHAV CLASSIC BUILDERS AND DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SWARGANDHAR PHASE 2 A1,A2,A3,B1,B2,B3,B4,B5,C1?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SWARGANDHAR PHASE 2 A1,A2,A3,B1,B2,B3,B4,B5,C1?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SWARGANDHAR PHASE 2 A1,A2,A3,B1,B2,B3,B4,B5,C1?
The professionals named in the filing: Architect: RAJENDRA DAGDU HARALE; Engineer: GA BHILARE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SWARGANDHAR PHASE 2 A1,A2,A3,B1,B2,B3,B4,B5,C1?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.