Home / Browse projects / Nagpur, Maharashtra / Swapna-Niketan by NMC

Completed No litigation declared Residential / Group Housing project

Swapna-Niketan by NMC

By SANDEEP DWELLERS PVT. LTD.

RG-MH-67556 · RERA P50500050570 · Last updated on MahaRERA portal: 20 Jun 2025

Source: official MahaRERA filing

Red flags

  • 2 complaints at MahaRERA
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Mar 2026Possession promisedregistration recorded completed
48 of 88Construction stages doneacross 8 buildings; furthest along: External plumbing and external plaster, 95%
2Complaints at MahaRERAon this registration
Jump to the 79 documents Report an error

Swapna-Niketan by NMC is a Residential / Group Housing project by SANDEEP DWELLERS PVT. LTD. in Nagpur, Maharashtra, registered with MahaRERA as P50500050570 on 21 Apr 2023. The registration is recorded completed; possession was promised by 30 Mar 2026. The completion date has moved by 12 months from the original filing. 2 complaints are on record with the regulator.

At a glance

Project

  • NameSwapna-Niketan by NMC
  • TypeResidential / Group Housing
  • Location
    • Kamptee Road
    • Wanjara
    • Nagpur (Rural)
    • Nagpur
    • 440026
  • Pincode440026
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500050570
  • ReraGenie IDRG-MH-67556

Builder

  • NameSANDEEP DWELLERS PVT. LTD.
  • Entity typeCompany
  • CINU45200MH1990PTC058101
  • GSTIN27AACCS0133P1Z9
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • Managing DirectorASHOK SUBHASKUMAR AGARWALA
  • Other registrations26 more →
  • Completed13 of 27
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects5 →

Key dates

this monthRegisteredApr 2023First promiseMar 2025Revised toMar 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on21 Apr 2023
  • Promised completion30 Mar 2026
  • Revised completionRevised to 30 Mar 2026 (originally 31 Mar 2025)
  • Buildings8 building records
  • Documents filed79 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A1NA80000
A2NA80000
A3NA80000
A4NA80000
A5NA80000
A6NA80000
A7NA80000
A8NA80000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building8

As on 20 Jun 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

48 of 88 construction stages are filed complete across 8 buildings. The stage furthest along is External plumbing and external plaster, at 95%.

A182%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
A277%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises75%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks85%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.85%
A373%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises93%
Sanitary Fittings within the flats / premises65%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%
A482%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
A566%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.75%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%
A667%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises93%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.93%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%
A777%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.75%
A871%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises75%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks75%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%

Progress on shared amenities15

As on 20 Jun 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes80%
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes75%
Storm Water DrainsYes50%
Landscaping & Tree PlantingYes0%
Street LightingYes30%
Community BuildingsYes75%
Treatment And Disposal Of Sewage And Sullage WaterYes60%
Solid Waste Management And DisposalYes20%
Water conservation /Rain water harvestingYes50%
Energy managemcntYes50%
Fire protection and fire safety requirementsYes35%
Electrical meter room, sub-station, receiving stationYes65%
Aggregate area of recreational Open SpaceYes50%
Open ParkingYes50%

Parking filed1008

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1,008
Closed/Covered192
Open Space816
BuildingClosed/CoveredOpen SpaceTotal
A124102126
A224102126
A324102126
A424102126
A524102126
A624102126
A724102126
A824102126

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area12,913 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
The Nagpur Slum Rehabilitation AuthorityNagpur (M Corp.)Nagpur

Approvals and building plan

Sanctioning authorityNagpur Municipal Corporation
Permissible FSI19179.13
Proposed, not sanctioned19,085 sq m
Buildings approved8
Buildings sanctioned8

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchCivil Lines Nagpur

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRahul Agarwala
ArchitectAr. Dinesh Warade
EngineerAman Kumar Singh
EngineerAshish Shiwarkar
Chartered AccountantParesh Tank
Chartered AccountantBC BHARTIA
PartnerRole in project
SANDEEP DWELLERS PVT. LTD.-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT50500028075Mar 2025 → Mar 2026

Reason as filed by the promoterWe had been allotted the Work Order by Slum Rehabilitation Authority (Of Nagpur Municipal Corporation), for the Construction Development and Sale of 480 EWS DU’s including the required basic infrastructure of roads, utilities, social amenities etc. under AHP Pradhan Mantri Awas Yojana in Nagpur. The tenure of the work contract was for a period of 24 months. We were able to start work on 6 out of 8 building in the month of April 2023 but works of 2 buildings could not be started before June 2023 due to change in layout of the overall project as per site condition. In spite of this we have been

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC12603792SANDEEP DWELLERS PVT. LTD.Ajay Dahake19/06/2026
CC12603762SANDEEP DWELLERS PVT. LTD.Shubham Takarkhede18/06/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Mar 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 1 Apr 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Aug 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 24 Aug 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed79

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupational CertificateFile: AHP WANJARA OCCUPANCY CERTIFICATE.pdf20 Jun 2025
Declaration in FORM BFile: Form B - Apr 25.pdf26 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect - Swapnaniketan - 31 March 25.pdf26 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - SNW.pdf26 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - SNW.pdf26 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold unsold - SNW - Mar 25.pdf26 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Supervisor - Swapnaniketan - 31 March 25.pdf26 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - Swapnaniketan - Mar 25.pdf26 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Swapnaniketan- Architect - Mar 25.pdf16 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Swapnaniketan - CA - Mar 25-compressed.pdf16 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SwapnaNiketan- Engineer - Mar 25.pdf16 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Swapna Niketan- CA - Dec 24.pdf13 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Swapna Nikletan- Architect - Dec 24.pdf11 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Swapna Niketan- Engineer - Dec 24.pdf11 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Swapnaniketan-compressed.pdf18 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Swapnaniketan-compressed.pdf18 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Swapnaniketan_compressed.pdf22 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Swapna Niketan_compressed.pdf17 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Swapna Niketan_compressed.pdf17 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Swapnaniketan - Supervisor - 2024.pdf14 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Swapna Niketan_compressed.pdf15 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SwapnaNiketan - Architect - 30Jun24.pdf13 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Swapna Niketan - Engineer - 30Jun24.pdf13 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SWAPNA NIKETAN - CA Certificate - 31Mar24.pdf22 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Swapna Niketan - NMC_compressed.pdf10 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Swapna - Niketan_compressed.pdf10 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect - Swapnaniketan - Dec 23.pdf13 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer - NMC- Swapnaniketan- Dec23.pdf13 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA - Swapna- niketan ( NMC)- Dec23.pdf13 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Swapna - Niketan_compressed.pdf14 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect- Swapnaniketan- 30Sep23.pdf12 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer - Swapna Niketan - Sep 23.pdf12 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Swapna Niketan.pdf26 Sep 2023
Building plan approvalFile: SNW Revised Sanction 1.pdf24 Aug 2023
Building plan approvalFile: SNW Revised Sanction 2.pdf24 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: SNW Revised Sanction 1.pdf24 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: SNW Revised Sanction 2.pdf24 Aug 2023
Commencement Certificates / NA Order for plotted developmentFile: Revised CC Wanjara Project.pdf24 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect- Swapnaniketan- 30Jun23.pdf13 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer - Swapnaniketan - 30Jun23_compressed.pdf13 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Swapna niketan_compressed.pdf13 Jul 2023
Deviation Report with respect to model copy of AgreementFile: Deviation agreement - swapnaniketan.pdf13 Apr 2023
Other - TechnicalFile: RERA clarification letter - SNW - 2.pdf13 Apr 2023
Details of encumbrances concerned to FinanceFile: Encumbrances - SNW.pdf12 Apr 2023
Details of encumbrances concerned to LegalFile: Encumbrances - SNW.pdf12 Apr 2023
CERSAI detailsFile: Cersai - SNW.pdf12 Apr 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank account declaration - SNW.pdf12 Apr 2023
Other - TechnicalFile: RFP 3rd Call_compressed.pdf12 Apr 2023
Other - TechnicalFile: Clarification letter - SNW_merged.pdf12 Apr 2023
Proforma of Allotment letterFile: Allotment letter.pdf7 Apr 2023
Proforma of Agreement for saleFile: Sample Agreement - Swapna Niketan.pdf7 Apr 2023
Deviation Report with respect to Allotment letterFile: Deviation - allotment letter.pdf7 Apr 2023
Layout approvalFile: SANCTIONED WANJRA PROJECT DRAWING-Page 1.pdf1 Apr 2023
Building plan approvalFile: SANCTIONED WANJRA PROJECT DRAWING-Page 2.pdf1 Apr 2023
Building plan approvalFile: SANCTIONED WANJRA PROJECT DRAWING-Page 3.pdf1 Apr 2023
Building plan approvalFile: SANCTIONED WANJRA PROJECT DRAWING-Page 4.pdf1 Apr 2023
Building plan approvalFile: SANCTIONED WANJRA PROJECT DRAWING-Page 5.pdf1 Apr 2023
Building plan approvalFile: SANCTIONED WANJRA PROJECT DRAWING-Page 5.pdf1 Apr 2023
Building plan approvalFile: SANCTIONED WANJRA PROJECT DRAWING-Page 6.pdf1 Apr 2023
Building plan approvalFile: SANCTIONED WANJRA PROJECT DRAWING-Page 7.pdf1 Apr 2023
Building plan approvalFile: SANCTIONED WANJRA PROJECT DRAWING-Page 8.pdf1 Apr 2023
Building plan approvalFile: SANCTIONED WANJRA PROJECT DRAWING-Page 9.pdf1 Apr 2023
Copy of Layout Approval (in case of layout)File: SANCTIONED WANJRA PROJECT DRAWING-Page 1.pdf1 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: SANCTIONED WANJRA PROJECT DRAWING-Page 2.pdf1 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: SANCTIONED WANJRA PROJECT DRAWING-Page 3.pdf1 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: SANCTIONED WANJRA PROJECT DRAWING-Page 4.pdf1 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: SANCTIONED WANJRA PROJECT DRAWING-Page 5.pdf1 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: SANCTIONED WANJRA PROJECT DRAWING-Page 5.pdf1 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: SANCTIONED WANJRA PROJECT DRAWING-Page 6.pdf1 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: SANCTIONED WANJRA PROJECT DRAWING-Page 7.pdf1 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: SANCTIONED WANJRA PROJECT DRAWING-Page 8.pdf1 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: SANCTIONED WANJRA PROJECT DRAWING-Page 9.pdf1 Apr 2023
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE - Swapnaniketan.pdf1 Apr 2023
PAN CardFile: PAN Card- SDPL - Copy signed.pdf30 Mar 2023
Copy of the legal title reportFile: Title Certificate Swapna Niketan.pdf30 Mar 2023
Declaration about Commencement CertificateFile: Commencement Declaration - sdpl.pdf30 Mar 2023
Declaration in FORM BFile: Form B - SDPL.pdf30 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate - Swapna Niketan_compressed.pdf30 Mar 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Promoter declaration.pdf30 Mar 2023

Promoter's earlier projects5

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise3 delivered late
ProjectLocationFlatsStatusPromisedDelivered
SDPL ClassicPlot no 35 Kh. No. 302 Chinchbhuvan Wardha Road Near Khapri Nagpur 44002543CompletedJun 2017Apr 2017
SDPL Greens Wing B and D and Convenience ShoppingKh No. 13-15 Opp. Star Motors Kamptee Road Nagpur 440026131CompletedMay 2017Nov 2016
SDPL Paradise Wing A and BBehind Water Tank Dabha Nagpur 44002372CompletedSep 2016Late, Oct 2016
Shree Swaminarayan EnclaveNext to Sadashiv Nagar Near Swaminarayan Temple Wathoda Nagpur 44000898CompletedDec 2014Late, Feb 2015
NILGIRIOpp. Transport Plaza Automotive Chowk Kamptee Road Nagpur 44002655CompletedSep 2014Late, Dec 2014

How this compares with Nagpur

13%of Nagpur projects moved their completion datethis one moved by 12 months
22%of Nagpur registrations have lapsed or been cancelledthis one is completed

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Swapna-Niketan by NMC on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Wanjara2,800+ in Nagpur

2 kmSwapna-Niketan by NMCCompleted 6Lapsed / revoked 8Other 25Dot size: filed unitsN

Filed coordinates, straight-line distance. 39 registered projects within 2 km.

Builder: SANDEEP DWELLERS PVT. LTD.

SANDEEP DWELLERS PVT. LTD. has 27 registrations on MahaRERA, including SDPL Aashray Dabha and SDPL Paradise II. Its filings disclose 5 earlier MahaRERA projects: declares 2 of 5 past projects completed on time. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if Swapna-Niketan by NMC is delayed beyond 30 Mar 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Swapna-Niketan by NMC?

The registered promoter entity is SANDEEP DWELLERS PVT. LTD., a company as per the filing. Its CIN U45200MH1990PTC058101 and GSTIN 27AACCS0133P1Z9 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Swapna-Niketan by NMC?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Swapna-Niketan by NMC?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Swapna-Niketan by NMC?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Swapna-Niketan by NMC?

The professionals named in the filing: Architect: Rahul Agarwala; Architect: Ar. Dinesh Warade; Engineer: Aman Kumar Singh; Engineer: Ashish Shiwarkar; Chartered Accountant: Paresh Tank; Chartered Accountant: BC BHARTIA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Swapna-Niketan by NMC?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Swapna-Niketan by NMC. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Swapna-Niketan by NMC to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.