SWAMI HOMES

By S S DEVELOPERS

RG-MH-17455 · RERA P52100028945 · Last updated on MahaRERA portal: 15 Jun 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken
  • Rs 1.50 crore secured on the land, in favour of Bank of Maharashtra

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jan 2027Possession promisedmoved 12 months from the original
5 of 11Construction stages donefurthest along: Internal walls, 97%
20 of 44Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 111 documents Report an error

SWAMI HOMES is a Others project by S S DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100028945 on 15 Apr 2021. Possession is promised by 31 Jan 2027. The completion date has moved by 12 months from the original filing. 24 of the 44 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NameSWAMI HOMES
  • TypeOthers
  • Location
    • LONI KALBHOR
    • Loni-kalbhor
    • Haveli
    • Pune
    • 412201
  • Pincode412201
  • RERA no.P52100028945
  • ReraGenie IDRG-MH-17455

Builder

  • NameS S DEVELOPERS
  • Entity typePartnership
  • PartnersSUJATA SATISH SHELKE, SUREKHA RAJENDRA JAGTAP
  • Other registrations16 more →
  • Completed8 of 17
  • No longer live5 lapsed, de-registered or revoked
  • Declared earlier projects2 →

Key dates

this monthRegisteredApr 2021First promiseJan 2026Revised toJan 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on15 Apr 2021
  • Promised completion31 Jan 2027
  • Revised completionRevised to 31 Jan 2027 (originally 31 Jan 2026)
  • Buildings1 building record
  • Documents filed111 files

Current status

55%24 of 44 units booked
91.7%Work done, per cost certificate

Figures as on 15 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SWAMI HOMESNA55301444

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 15 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 97%.

SWAMI HOMES: 72% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises97%
Sanitary Fittings within the flats / premises97%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.97%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 15 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed42

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots42
Open Space42

Land and ownership7

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area855 sq m
Land owned byThe promoter, with other names on the file
Named landowners7
Encumbrance on the landDeclared present
Charge in favour ofBank of Maharashtra
Secured amountRs 1.50 crore
CERSAI search filedYes
Declared on18 Jul 2025
LandownerVillageDistrict
MOHAMMAD HANIF SHAIKH HUSAIN MUNDHELoni-kalbhorPune
GAURAV TANAJI KALBHORLoni-kalbhorPune
FARJANA MOHAMMAD HANIF SHAIKH MUNDHELoni-kalbhorPune
TOSIF AHMED M SHAIKH MUNDHE-Pune
AMRIN TOSIF SHAIKH MUNDHELoni-kalbhorPune
TOUHEEDALAM MDHANIF SHAIKH MUNDHELoni-kalbhorPune
NIQUAHAT AFRIN FARUK SHAIKH MUNDHEHadapsarPune

Approvals and building plan

Sanctioning authorityAssistant Director of Town Planning Br Pune
Permissible FSI1559.0
Proposed, not sanctioned1,559 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchDR GUGALE BLDG 1137/D, PUNE Nagar Road, YERAVADA,PUNE,411006
Estimated costRs 3.65 cr
Cost incurredRs 3.34 cr
Work done91.69%
BuildingWingEstimatedIncurred
SWAMI HOMESNARs 3.40 crRs 3.10 cr
-NARs 25.00 lakhRs 24.50 lakh

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPriti Chauragade
EngineerVinod D Pawar
EngineerSachin Maruti Yadav
Chartered AccountantAmol Totala
Chartered AccountantYogesh Pandurang Bhagat
PartnerRole in project
S S DEVELOPERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA25012619577Jan 2026 → Jan 2027

Reason as filed by the promoterThe Promoter has continuously made sincere efforts to complete the project within the declared timeline and has acted in a bona fide and transparent manner throughout. However, due to circumstances beyond the control of the Promoter, such as labour shortages, a slowdown in sales compared to projections, and other unforeseen factors, the project will not be complete within the originally declared period. The project is presently in the final stage of completion. The Promoter hereby declares and undertakes that the project will be completed within the requested extension period.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 7 Apr 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 7 Apr 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 7 Apr 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Apr 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Jan 2027

Documents filed111

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 111 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Mar 26.pdf15 Jun 2026
Withdrawal Update Form 2File: Form 2 - Mar 26.pdf15 Jun 2026
Withdrawal Update Form 3File: Form 3 - Mar 26.pdf15 Jun 2026
Form 5 (FY 2025-2026)File: Form 5 M26.pdf15 May 2026
Withdrawal Update Form 1File: Form 1 Mar 26.pdf14 May 2026
Withdrawal Update Form 2File: Form 2 Dec 25.pdf14 May 2026
Withdrawal Update Form 3File: Form 3 Dec 25.pdf14 May 2026
Form 2A (FY 2024-2025)File: Form 2A FY24-25 Signed.pdf14 May 2026
Form 2A (FY 2025-2026)File: Form 2A FY25-26.pdf14 May 2026
Form 5 (FY 2024-2025)File: Form 5 M25.pdf25 Jan 2026
Withdrawal Update Form 1File: FORM1 SEP 2025.pdf24 Jan 2026
Withdrawal Update Form 1File: FORM 1 DEC 2025.pdf24 Jan 2026
Withdrawal Update Form 2File: Form 2 Sep 25.pdf24 Jan 2026
Withdrawal Update Form 2File: Form 2 Dec 25.pdf24 Jan 2026
Withdrawal Update Form 3File: Form 3 Sep 25.pdf24 Jan 2026
Withdrawal Update Form 3File: Form 3 Dec 25.pdf24 Jan 2026
Declaration and undertaking (Annexure A)File: Annexure A Order 50 2024.pdf19 Jul 2025
Declaration and undertaking (Annexure A)File: Annexure A Order 50 2024.pdf19 Jul 2025
Form 1File: 03 Form 1 Architech Certificate1.pdf19 Jul 2025
Form 2File: Form 2 Engineer Certificate Loan.pdf19 Jul 2025
Form 3File: 06 CA Certificate Mar 25 - With Loan.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: 07 Sold Unsold 310320251.pdf19 Jul 2025
OthersFile: Form 2A Engineer Quality Assurance1.pdf19 Jul 2025
Form 1File: 05 Form 1 31-12-2024.pdf19 Jul 2025
Form 2File: 05 Form 2 31-12-2024.pdf19 Jul 2025
Form 3File: 06 Form 3 Dec 24.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Inventory Sign.pdf19 Jul 2025
Form 1File: 04 Form 1 30-9-2024.pdf19 Jul 2025
Form 2File: 04 Form 2 30-9-2024.pdf19 Jul 2025
Form 3File: 05 Form 3 Sep 24.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Inventory Sign.pdf19 Jul 2025
Form 1File: 03 Form 1 30-6-2024.pdf19 Jul 2025
Form 2File: 03 Form 2 30-6-2024.pdf19 Jul 2025
Form 3File: 04 Form 3 Jun 24.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Inventory Sign.pdf19 Jul 2025
OthersFile: Form 2A M24.pdf19 Jul 2025
Withdrawal Update Form 1File: 01 Form 1 Architect Certificate June 2025.pdf19 Jul 2025
Withdrawal Update Form 1File: 01 Form 1 Architect Certificate June 2025.pdf19 Jul 2025
Withdrawal Update Form 2File: 02 Form 2 Engineer Certificate June 2025.pdf19 Jul 2025
Withdrawal Update Form 2File: 02 Form 2 Engineer Certificate June 2025.pdf19 Jul 2025
Withdrawal Update Form 3File: 03 CA Certificate Jun 25 - With Loan.pdf19 Jul 2025
Withdrawal Update Form 3File: 03 CA Certificate Jun 25 - With Loan.pdf19 Jul 2025
Declaration about Commencement CertificateFile: 07 Format D - Commencement.pdf18 Mar 2025
CERSAI detailsFile: 08 CERSAI_Search_Report_200344077820.pdf18 Mar 2025
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 04 Format A.pdf18 Mar 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: 04 Format B-1.pdf18 Mar 2025
Disclosure for secured/unsecured finance availed for the projectFile: 06 Disclosure for Secured Loan.pdf18 Mar 2025
Details of encumbrances concerned to FinanceFile: 03 Legal Encumbrance.pdf13 Mar 2025
Details of encumbrances concerned to LegalFile: 03 Legal Encumbrance.pdf13 Mar 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: 05 Discl in Other Entity - Firm.pdf13 Mar 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: 05 Discl in Other Entity - Sujata.pdf13 Mar 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: 05 Discl in Other Entity - Surekha.pdf13 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 02 Form 1 2024.pdf8 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 03 Form 1 30-6-2024.pdf8 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 04 Form 1 30-9-2024.pdf8 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 05 Form 1 31-12-2024.pdf8 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 01 Form 1 2023.pdf8 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 01 Form 3 M 22.pdf8 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 02 Form 3 M 23.pdf8 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 03 Form 3 M 24.pdf8 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 04 Form 3 Jun 24.pdf8 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 05 Form 3 Sep 24.pdf8 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 06 Form 3 Dec 24.pdf8 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 01 Form 2 31-3-2023.pdf8 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 05 Form 2 31-12-2024.pdf8 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 04 Form 2 30-9-2024.pdf8 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 03 Form 2 30-6-2024.pdf8 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 02 Form 2 31-3-2024.pdf8 Mar 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory Sign.pdf8 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 M 22.pdf8 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A M22.pdf8 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A M23.pdf8 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 M 23.pdf8 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A M24.pdf8 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 M 24.pdf8 Mar 2025
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A.pdf4 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: June 2021.pdf7 Nov 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Sept 21.pdf7 Nov 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Sept 21.pdf7 Nov 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Dec 2021.pdf7 Nov 2022

How this compares with Pune

55%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 12 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SWAMI HOMES on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near LONI KALBHOR13,700+ in Pune

Builder: S S DEVELOPERS

S S DEVELOPERS has 17 registrations on MahaRERA, including S S PARK and S S PARK PHASE 2. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if SWAMI HOMES is delayed beyond 31 Jan 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SWAMI HOMES?

The registered promoter entity is S S DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SWAMI HOMES?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SWAMI HOMES?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SWAMI HOMES?

The professionals named in the filing: Architect: Priti Chauragade; Engineer: Vinod D Pawar; Engineer: Sachin Maruti Yadav; Chartered Accountant: Amol Totala; Chartered Accountant: Yogesh Pandurang Bhagat. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SWAMI HOMES?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SWAMI HOMES. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SWAMI HOMES to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.