Sushrut Residency
RG-MH-70867 · RERA P52100049747 · Last updated on MahaRERA portal: 11 Jun 2026
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
- All 1 earlier projects delivered on promise
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Sushrut Residency is a Residential / Group Housing project by SHREE KAAMDHENU BUILDCON in Pune, Maharashtra, registered with MahaRERA as P52100049747 on 24 Feb 2023. The registration is recorded completed; possession was promised by 31 Dec 2026. 24 of the 25 units on this registration are recorded sold or booked, and 11 of 11 construction stages are filed complete.
At a glance
Project
- NameSushrut Residency
- TypeResidential / Group Housing
- Location
- Taljai Devi Mandir Road
- Dhanakwadi
- Dhankawadi
- Haveli
- Pune
- 411043
- Pincode411043
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100049747
- ReraGenie IDRG-MH-70867
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on24 Feb 2023
- Promised completion31 Dec 2026
- Revised completionNone
- Buildings1 building record
- Documents filed156 files
Current status
Figures as on 11 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Sushrut Residency | NA | 9 | 1 | 25 | 0 | 25 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 11 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
11 of 11 construction stages are filed complete.
Sushrut Residency: 100% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 11 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed66
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Sushrut Residency | NA | Rs 5.50 cr | Rs 5.50 cr |
| - | NA | Rs 25.00 lakh | Rs 25.00 lakh |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Sawankumar Chandak |
| Architect | Sahil Jaychand Khinvasara |
| Engineer | Pavan Dhamdhere |
| Engineer | Sandesh Patil |
| Chartered Accountant | Kishor Bhagwat |
| Chartered Accountant | CA Shailendra Dattatray Panse |
| Partner | Role in project |
|---|---|
| SHREE KAAMDHENU BUILDCON | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 9 Jan 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 3 Nov 2025 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 3 Nov 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 3 Nov 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 3 Nov 2025
Documents filed156
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 156 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2026-2027)File: Form 2A March 27.pdf | 11 Jun 2026 |
| Form 5 (FY 2022-2023)File: Audit Report 2022-23.pdf | 11 Jun 2026 |
| Form 5 (FY 2023-2024)File: Audit Report 2023-24.pdf | 11 Jun 2026 |
| Form 5 (FY 2024-2025)File: Audit Report 2024-25.pdf | 11 Jun 2026 |
| Occupational CertificateFile: Occupancy certificate and OC Confirmation Mail.pdf | 11 Jun 2026 |
| Withdrawal Update Form 1File: Withdrawal Application Form 1 Signed.pdf | 10 Jun 2026 |
| Withdrawal Update Form 1File: Withdrawal Application Form 1 Signed.pdf | 10 Jun 2026 |
| Withdrawal Update Form 2File: Withdrawal Application Form 2 Signed.pdf | 10 Jun 2026 |
| Withdrawal Update Form 2File: Withdrawal Application Form 2 Signed.pdf | 10 Jun 2026 |
| Withdrawal Update Form 3File: Latest CA Dec 25.pdf | 10 Jun 2026 |
| Withdrawal Update Form 3File: Latest CA Dec 25.pdf | 10 Jun 2026 |
| Form 2A (FY 2022-2023)File: Form 2A March 23.pdf | 10 Jun 2026 |
| Form 2A (FY 2023-2024)File: Form 2A March 24.pdf | 10 Jun 2026 |
| Form 2A (FY 2024-2025)File: Form 2A March 25.pdf | 10 Jun 2026 |
| Form 2A (FY 2025-2026)File: Form 2A March 26.pdf | 10 Jun 2026 |
| Declaration and undertaking (Annexure A)File: DECLARATION CUM UNDERTAKING 14 05 2026.pdf | 14 May 2026 |
| Withdrawal Update Form 1File: Withdrawal Application Form 1 Signed.pdf | 31 Mar 2026 |
| Withdrawal Update Form 2File: Withdrawal Application Form 2 Signed.pdf | 31 Mar 2026 |
| Withdrawal Update Form 3File: Withdrawal Application Form 3 Signed .pdf | 31 Mar 2026 |
| Withdrawal Update Form 1File: Withdrawal Application Form 1 Signed.pdf | 27 Feb 2026 |
| Withdrawal Update Form 2File: Withdrawal Application Form 2 Signed.pdf | 27 Feb 2026 |
| Withdrawal Update Form 3File: Withdrawal Application Form 3 Signed .pdf | 27 Feb 2026 |
| Withdrawal Update Form 1File: Withdrawal Application Form 1 Signed.pdf | 9 Feb 2026 |
| Withdrawal Update Form 2File: Withdrawal Application Form 2 Signed.pdf | 9 Feb 2026 |
| Withdrawal Update Form 3File: Form 3 CA Certificate 31 10 2025.pdf | 9 Feb 2026 |
| Occupational CertificateFile: FULL OCCUPANCY CERTIFICATE 15 10 2025.pdf | 4 Nov 2025 |
| Layout approvalFile: 1 Revised Sanction Plan 11 09 2025.pdf | 3 Nov 2025 |
| Building plan approvalFile: 2 Revised Sanction Plan 11 09 2025.pdf | 3 Nov 2025 |
| Building plan approvalFile: FULL OCCUPANCY CERTIFICATE 15 10 2025.pdf | 3 Nov 2025 |
| Building plan approvalFile: 1 Revised Sanction Plan 11 09 2025.pdf | 3 Nov 2025 |
| Building plan approvalFile: 2 Revised Sanction Plan 11 09 2025.pdf | 3 Nov 2025 |
| Commencement certificateFile: Commencement Certificate 2181 Dt 11 09 2025.pdf | 3 Nov 2025 |
| Withdrawal Update Form 1File: Form 1 Architect Certificate 30 09 2025.pdf | 3 Nov 2025 |
| Withdrawal Update Form 2File: Form 2 Engineers Certificate 30 09 2025.pdf | 3 Nov 2025 |
| Withdrawal Update Form 3File: Form 3 CA Certificate 31 10 2025.pdf | 3 Nov 2025 |
| Form 1File: Architect Form 1.pdf | 1 Nov 2025 |
| Form 2File: ENGINEER CERTIFICATE 18 01 2023.pdf | 1 Nov 2025 |
| Form 3File: Form 3 C A CERTIFICATE 07 02 2023.pdf | 1 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Undold Inventary 01 04 2023.pdf | 1 Nov 2025 |
| Form 2File: Form 2 Engineers Certificate 30 06 2023.pdf | 1 Nov 2025 |
| Form 3File: FORM 3 CA CERTIFICATE 30 06 2023.pdf | 1 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: sold unsold inventary 30 06 2023.pdf | 1 Nov 2025 |
| OthersFile: Quality Assurance Certificate June 2023.pdf | 1 Nov 2025 |
| Form 1File: Form 1 Architect Certificate 15 05 2023.pdf | 1 Nov 2025 |
| Form 1File: Form 1 Architect Certificate 30 09 2023.pdf | 1 Nov 2025 |
| Form 2File: Form 2 Engineers Certificate 30 09 2023.pdf | 1 Nov 2025 |
| Form 3File: FORM 3 CA CERTIFICATE 30 09 2023.pdf | 1 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD INVENTORY 06 09 2023.pdf | 1 Nov 2025 |
| Form 1File: Form 1 Architect Certificate 15 01 2024.PDF | 1 Nov 2025 |
| Form 2File: Form 2 Engineers Certificate 31-12-2023.pdf | 1 Nov 2025 |
| Form 3File: Form 3 C A Certificate 31-12-2023.pdf | 1 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventary 01-01-2024.pdf | 1 Nov 2025 |
| Form 1File: Form 1 Architect Certificate 31 03 2024.pdf | 1 Nov 2025 |
| Form 2File: Form 2 Engineers Certificate 31 03 2024.pdf | 1 Nov 2025 |
| Form 3File: Form 3 CA Certificate 31 03 2024.pdf | 1 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventary 31 03 2024.pdf | 1 Nov 2025 |
| Self-declaration of Quarterly ProgressFile: Quality Assurance Certificate 31 03 2024.pdf | 1 Nov 2025 |
| OthersFile: 22 23 C A Form 5 Dt 08 03 2024.pdf | 1 Nov 2025 |
| Form 1File: Form 1 Architect Certificate 30 06 2024.PDF | 1 Nov 2025 |
| Form 2File: Form 2 Engineers Certificate 01 07 2024.pdf | 1 Nov 2025 |
| Form 3File: Form 3 C A Certificate 20 07 2024.pdf | 1 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventary 11 07 2024.pdf | 1 Nov 2025 |
| Form 1File: Form 1 Architect Certificate 30 09 2024.pdf | 1 Nov 2025 |
| Form 2File: Form 2 Engineer Certificate 01 10 2024.pdf | 1 Nov 2025 |
| Form 3File: Form 3 C A Certificate 21 10 2024.pdf | 1 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventary 01 10 2024.pdf | 1 Nov 2025 |
| Form 1File: Form 1 Architect Certificate 31 12 2024.pdf | 1 Nov 2025 |
| Form 2File: Form 2 Engineer Certificate 31 12 2024.pdf | 1 Nov 2025 |
| Form 3File: Form 3 C A Certificate 31 12 2024.pdf | 1 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory 31 12 2024.pdf | 1 Nov 2025 |
| Form 1File: Form 1 Architect Certificate 31 03 2025.pdf | 1 Nov 2025 |
| Form 2File: Form 2 Engineer Certificate 31 03 2025.pdf | 1 Nov 2025 |
| Form 3File: Form 3 C A Certificate 05 05 2025.pdf | 1 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD INVENTORY 31 03 2025.pdf | 1 Nov 2025 |
| Self-declaration of Quarterly ProgressFile: QUALITY ASSURANCE CERTIFICATE 31 03 2025.pdf | 1 Nov 2025 |
| Form 1File: Form 1 Architect Certificate 30 06 2025.pdf | 25 Jul 2025 |
| Form 2File: Form 2 Engineers Certificate 30 06 2025.pdf | 25 Jul 2025 |
| Form 3File: Form 3 C A Certificate 25 07 2025.pdf | 25 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD INVENTORY 30 06 2025.pdf | 25 Jul 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 C A Certificate 05 05 2025.pdf | 6 May 2025 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Sunrut Residency | Vivekanand society Dhanakwadi Pune 411043 | 33 | Completed | Jun 2022 | Sep 2021 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 156 filed documents as one ZIP, foldered, with a manifest
Keep Sushrut Residency on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Dhanakwadi13,700+ in Pune
Filed coordinates, straight-line distance. 132 registered projects within 2 km.
4 Taljai Hills Phase 1
Shri Taljai Mata Associates LLP
CHANDRANGAN REVANTA
CHANDRANGAN BUILDCON LLP
PANORA
OM SAI DEVELOPERS
KADAM HERITAGE SURVEY NO.4/7/1 AND 4/7/2
D & T PROPERTIES
TRIDENT
Shamraj Constructions
Bhargav Stella
Bhargav Shelters
Builder: SHREE KAAMDHENU BUILDCON
Shree Kaamdhenu Buildcon has 2 registrations on MahaRERA, including Sunrut Residency and Sushrut Residency. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Sushrut Residency is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Sushrut Residency?
The registered promoter entity is SHREE KAAMDHENU BUILDCON, a partnership as per the filing. Its GSTIN 27ACXFS7599F1ZZ can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Sushrut Residency?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Sushrut Residency?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Sushrut Residency?
The professionals named in the filing: Architect: Sawankumar Chandak; Architect: Sahil Jaychand Khinvasara; Engineer: Pavan Dhamdhere; Engineer: Sandesh Patil; Chartered Accountant: Kishor Bhagwat; Chartered Accountant: CA Shailendra Dattatray Panse. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Sushrut Residency?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback