Home / Browse projects / Pune, Maharashtra / TRIDENT

Registered No litigation declared Others project

TRIDENT

By Shamraj Constructions

RG-MH-68779 · RERA P52100051240 · Last updated on MahaRERA portal: 14 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
18 of 33Construction stages doneacross 3 buildings; furthest along: Sanitary Fittings within the flats /..., 95%
68 of 150Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 103 documents Report an error

TRIDENT is a Others project by Shamraj Constructions in Pune, Maharashtra, registered with MahaRERA as P52100051240 on 8 Jun 2023. Possession is promised by 31 Dec 2028. 82 of the 150 units on this registration are recorded sold or booked, and 18 of 33 construction stages are filed complete.

At a glance

Project

  • NameTRIDENT
  • TypeOthers
  • Location
    • Shri Shreedhar Cooperative Housing Society
    • Near Taljai Mandir
    • Dhankawadi
    • Haveli
    • Pune
    • 411043
  • Pincode411043
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100051240
  • ReraGenie IDRG-MH-68779

Builder

  • NameShamraj Constructions
  • Entity typePartnership
  • PartnersSham P Deshpande, Vinay R Kulkarni, Yatin S Kulkarni, Indrajit Kulkarni

Key dates

this monthRegisteredJun 2023PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on8 Jun 2023
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings3 building records
  • Documents filed103 files

Current status

55%82 of 150 units booked
87.2%Work done, per cost certificate

Figures as on 14 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing ANA141346652
Wing BNA141342446
Wing CNA141346652

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 14 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

18 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 95%.

Wing A98%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
Wing B82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure95%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises30%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks85%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.60%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.40%
Wing C65%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises5%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks60%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.25%

Progress on shared amenities15

As on 14 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingYes50%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes90%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes40%
Electrical meter room, sub-station, receiving stationYes80%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed118

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots118
Closed/Covered79
Open Space39
BuildingClosed/CoveredOpen SpaceTotal
Wing A271441
Wing B251035
Wing C271542

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,440 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on16 Oct 2025
LandownerVillageDistrict
Shri Sheedhar Cooperative Housing Society LtdKothrudPune

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI14077.0
Proposed, not sanctioned13,830 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchTilak Rd
Estimated costRs 41.66 cr
Cost incurredRs 36.34 cr
Work done87.23%
BuildingWingEstimatedIncurred
Wing CNARs 13.37 crRs 10.79 cr
Wing ANARs 12.53 crRs 12.53 cr
Wing BNARs 12.28 crRs 11.19 cr
-NARs 3.48 crRs 1.83 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMukta Kulkarni
EngineerJ W Consultants Umesh Joshi
EngineerShafik Pangarkar
Chartered AccountantJayant Kamat
Chartered AccountantD V Jayade And Co
PartnerRole in project
Shamraj Constructions-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 May 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 Jun 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 2 Apr 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 2 Apr 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed103

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 103 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Architects Certificate.pdf14 May 2026
Withdrawal Update Form 2File: Form 2 Engineers certificate.pdf14 May 2026
Withdrawal Update Form 3File: Form 3 upto 31032026.pdf14 May 2026
Withdrawal Update Form 1File: TRIDENT Form 1 18012026.pdf29 Jan 2026
Withdrawal Update Form 2File: Shamraj Form 2 19126.pdf29 Jan 2026
Withdrawal Update Form 3File: Form 3 Shamraj Dec 25 200126.pdf29 Jan 2026
Withdrawal Update Form 1File: Form 1 bw Signed.pdf20 Oct 2025
Withdrawal Update Form 2File: Form 2 Q2 2025.pdf20 Oct 2025
Withdrawal Update Form 3File: Form 3 30 09 25 Shamraj Constructions.pdf20 Oct 2025
Form 1File: Form 1 ARCHITECT CERTIFICATE 14 July 25 Nineth.pdf10 Oct 2025
Form 2File: Form 2 Engineers certificate July 25.pdf10 Oct 2025
Form 3File: Form3RERA 3062025.pdf10 Oct 2025
Disclosure of Sold and Booked InventoryFile: ONLY Sanctiond Disclosure of Sold booked inventory TRIDENT JUNE 25.pdf10 Oct 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - 20032025_compressed.pdf4 Apr 2025
Disclosure of sold/ booked inventoryFile: Circular 29.pdf4 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A FY 2023-24.pdf4 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 FY 2023-24.pdf4 Apr 2025
Building plan approvalFile: Sheet No1.pdf2 Apr 2025
Building plan approvalFile: Sheet No2.pdf2 Apr 2025
Building plan approvalFile: Sheet No3.pdf2 Apr 2025
Building plan approvalFile: Sheet No4.pdf2 Apr 2025
Building plan approvalFile: Sheet No5.pdf2 Apr 2025
Building plan approvalFile: Sheet No6.pdf2 Apr 2025
Building plan approvalFile: Sheet No7.pdf2 Apr 2025
Building plan approvalFile: Sheet No8.pdf2 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 MArch 24 for updation.pdf2 Apr 2025
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf2 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: Sheet No1.pdf2 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: Sheet No2.pdf2 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: Sheet No3.pdf2 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: Sheet No4.pdf2 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: Sheet No5.pdf2 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: Sheet No6.pdf2 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: Sheet No7.pdf2 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: Sheet No8.pdf2 Apr 2025
Declaration about Commencement CertificateFile: Revised 2 Format D DECLARATION ABOUT COMMENCEMNT CERTIFICATE MAR 25.pdf2 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 AS 31122024 Shamraj Construction.pdf21 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer s Certificate Form 2 Dec 2024.pdf21 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 ARCHITECT CERTIFICATE 10 Jan 25 Eigth.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: ONLY Sanctiond Disclosure of Sold booked inventory TRIDENT Dec 25.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate 141024.pdf15 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 ARCHITECT CERTIFICATE 10 Oct 24 Seventh.pdf22 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 3092024 Shamraj Construction.pdf22 Oct 2024
Disclosure of sold/ booked inventoryFile: ONLY Sanctiond Disclosure of Sold booked inventory TRIDENT Sept 24.pdf22 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 ARCHITECT CERTIFICATE 5 JULY 24 Sixth.pdf26 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Shamraj Trident A Engineer Certificate JUN 24 Sixth.pdf26 Jul 2024
Disclosure of sold/ booked inventoryFile: ONLY Sanctiond Disclosure of Sold booked inventory TRIDENT JUN 24.pdf26 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 AS 3062024 Shamraj Construction.pdf26 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 ARCHITECT CERTIFICATE 5 APR 24 Fifth.pdf21 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 MMC Engineer Certificate MAR24.pdf21 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Shamraj Trident A Engineer Certificate Mar 24 Fifth.pdf21 Apr 2024
Disclosure of sold/ booked inventoryFile: ONLY Sanctiond Disclosure of Sold booked inventory TRIDENT MAR 24.pdf21 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 31 03 24 Shamraj Construction.pdf21 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Jan 2024 December quarter compressed.pdf19 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Shamraj Trident A Engineer Certificate Dec 23 Fourth.pdf19 Jan 2024
Disclosure of sold/ booked inventoryFile: ONLY Sanctiond Disclosure of Sold booked inventory TRIDENT Dec 23.pdf19 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 31 12 23 Shamraj Construction.pdf19 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Shamraj Form 1 compressed.pdf20 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Shamraj Trident A Engineer Certificate Sept 23 Third.pdf20 Oct 2023
Disclosure of sold/ booked inventoryFile: ONLY Sanctiond Disclosure of Sold booked inventory TRIDENT Sept 23.pdf20 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Upload Form3 30092023 Shamraj Construction compressed.pdf20 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 June 23 Trident Shamraj.pdf3 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 June 23 Trident Shamraj.pdf3 Aug 2023
Disclosure of sold/ booked inventoryFile: ONLY Sanctiond Disclosure of Sold booked inventory TRIDENT June 23.pdf3 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3 June 23 Trident Shamraj.pdf3 Aug 2023
Proforma of Agreement for saleFile: Upload with D eviation Final Draft Agreement 25723.pdf3 Aug 2023
Deviation Report with respect to model copy of AgreementFile: DEVIATION REPORT Agreement 310723.pdf3 Aug 2023
Building plan approvalFile: Sheet no 4.pdf2 Jun 2023
Layout approvalFile: Sheet 1-7.pdf2 Jun 2023
Building plan approvalFile: Sheet 2-7.pdf2 Jun 2023
Building plan approvalFile: Sheet 3-7.pdf2 Jun 2023
Building plan approvalFile: Sheet 5-7.pdf2 Jun 2023
Building plan approvalFile: Sheet 6-7.pdf2 Jun 2023
Building plan approvalFile: Sheet 7-7.pdf2 Jun 2023
Building plan approvalFile: Sheet 4-7.pdf2 Jun 2023
Details of encumbrances concerned to FinanceFile: Legal Encumberances Trident.pdf2 Jun 2023
Details of encumbrances concerned to LegalFile: Legal Encumberances Trident.pdf2 Jun 2023
Copy of Layout Approval (in case of layout)File: Sheet 1-7.pdf2 Jun 2023
Building Plan Approval / NA Order for plotted developmentFile: Sheet 2-7.pdf2 Jun 2023
Building Plan Approval / NA Order for plotted developmentFile: Sheet 3-7.pdf2 Jun 2023

How this compares with Pune

55%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep TRIDENT on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Near Taljai Mandir13,700+ in Pune

2 kmTRIDENTCompleted 38Lapsed / revoked 34Other 70Dot size: filed unitsN

Filed coordinates, straight-line distance. 142 registered projects within 2 km.

Builder: Shamraj Constructions

Shamraj Constructions has 1 registration on MahaRERA, including TRIDENT. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if TRIDENT is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of TRIDENT?

The registered promoter entity is Shamraj Constructions, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in TRIDENT?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for TRIDENT?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at TRIDENT?

The professionals named in the filing: Architect: Mukta Kulkarni; Engineer: J W Consultants Umesh Joshi; Engineer: Shafik Pangarkar; Chartered Accountant: Jayant Kamat; Chartered Accountant: D V Jayade And Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in TRIDENT?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About TRIDENT. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save TRIDENT to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.