TRIDENT
RG-MH-68779 · RERA P52100051240 · Last updated on MahaRERA portal: 14 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
TRIDENT is a Others project by Shamraj Constructions in Pune, Maharashtra, registered with MahaRERA as P52100051240 on 8 Jun 2023. Possession is promised by 31 Dec 2028. 82 of the 150 units on this registration are recorded sold or booked, and 18 of 33 construction stages are filed complete.
At a glance
Project
- NameTRIDENT
- TypeOthers
- Location
- Shri Shreedhar Cooperative Housing Society
- Near Taljai Mandir
- Dhankawadi
- Haveli
- Pune
- 411043
- Pincode411043
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100051240
- ReraGenie IDRG-MH-68779
Builder
- NameShamraj Constructions
- Entity typePartnership
- PartnersSham P Deshpande, Vinay R Kulkarni, Yatin S Kulkarni, Indrajit Kulkarni
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on8 Jun 2023
- Promised completion31 Dec 2028
- Revised completionNone
- Buildings3 building records
- Documents filed103 files
Current status
Figures as on 14 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Wing A | NA | 14 | 13 | 46 | 6 | 52 |
| Wing B | NA | 14 | 13 | 42 | 4 | 46 |
| Wing C | NA | 14 | 13 | 46 | 6 | 52 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 14 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
18 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 95%.
Wing A98%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 95% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 90% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 95% |
Wing B82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 95% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 90% |
| Sanitary Fittings within the flats / premises | 30% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 85% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 60% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 40% |
Wing C65%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 80% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 50% |
| Sanitary Fittings within the flats / premises | 5% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 60% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 25% |
Progress on shared amenities15
As on 14 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | Yes | 50% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 90% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 40% |
| Electrical meter room, sub-station, receiving station | Yes | 80% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed118
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| Wing A | 27 | 14 | 41 |
| Wing B | 25 | 10 | 35 |
| Wing C | 27 | 15 | 42 |
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Shri Sheedhar Cooperative Housing Society Ltd | Kothrud | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Wing C | NA | Rs 13.37 cr | Rs 10.79 cr |
| Wing A | NA | Rs 12.53 cr | Rs 12.53 cr |
| Wing B | NA | Rs 12.28 cr | Rs 11.19 cr |
| - | NA | Rs 3.48 cr | Rs 1.83 cr |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Mukta Kulkarni |
| Engineer | J W Consultants Umesh Joshi |
| Engineer | Shafik Pangarkar |
| Chartered Accountant | Jayant Kamat |
| Chartered Accountant | D V Jayade And Co |
| Partner | Role in project |
|---|---|
| Shamraj Constructions | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 30 May 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 2 Jun 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 2 Apr 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 2 Apr 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2028
Documents filed103
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 103 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1 Architects Certificate.pdf | 14 May 2026 |
| Withdrawal Update Form 2File: Form 2 Engineers certificate.pdf | 14 May 2026 |
| Withdrawal Update Form 3File: Form 3 upto 31032026.pdf | 14 May 2026 |
| Withdrawal Update Form 1File: TRIDENT Form 1 18012026.pdf | 29 Jan 2026 |
| Withdrawal Update Form 2File: Shamraj Form 2 19126.pdf | 29 Jan 2026 |
| Withdrawal Update Form 3File: Form 3 Shamraj Dec 25 200126.pdf | 29 Jan 2026 |
| Withdrawal Update Form 1File: Form 1 bw Signed.pdf | 20 Oct 2025 |
| Withdrawal Update Form 2File: Form 2 Q2 2025.pdf | 20 Oct 2025 |
| Withdrawal Update Form 3File: Form 3 30 09 25 Shamraj Constructions.pdf | 20 Oct 2025 |
| Form 1File: Form 1 ARCHITECT CERTIFICATE 14 July 25 Nineth.pdf | 10 Oct 2025 |
| Form 2File: Form 2 Engineers certificate July 25.pdf | 10 Oct 2025 |
| Form 3File: Form3RERA 3062025.pdf | 10 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: ONLY Sanctiond Disclosure of Sold booked inventory TRIDENT JUNE 25.pdf | 10 Oct 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - 20032025_compressed.pdf | 4 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Circular 29.pdf | 4 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A FY 2023-24.pdf | 4 Apr 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 FY 2023-24.pdf | 4 Apr 2025 |
| Building plan approvalFile: Sheet No1.pdf | 2 Apr 2025 |
| Building plan approvalFile: Sheet No2.pdf | 2 Apr 2025 |
| Building plan approvalFile: Sheet No3.pdf | 2 Apr 2025 |
| Building plan approvalFile: Sheet No4.pdf | 2 Apr 2025 |
| Building plan approvalFile: Sheet No5.pdf | 2 Apr 2025 |
| Building plan approvalFile: Sheet No6.pdf | 2 Apr 2025 |
| Building plan approvalFile: Sheet No7.pdf | 2 Apr 2025 |
| Building plan approvalFile: Sheet No8.pdf | 2 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 MArch 24 for updation.pdf | 2 Apr 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: CC.pdf | 2 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Sheet No1.pdf | 2 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Sheet No2.pdf | 2 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Sheet No3.pdf | 2 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Sheet No4.pdf | 2 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Sheet No5.pdf | 2 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Sheet No6.pdf | 2 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Sheet No7.pdf | 2 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Sheet No8.pdf | 2 Apr 2025 |
| Declaration about Commencement CertificateFile: Revised 2 Format D DECLARATION ABOUT COMMENCEMNT CERTIFICATE MAR 25.pdf | 2 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 AS 31122024 Shamraj Construction.pdf | 21 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer s Certificate Form 2 Dec 2024.pdf | 21 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 ARCHITECT CERTIFICATE 10 Jan 25 Eigth.pdf | 20 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: ONLY Sanctiond Disclosure of Sold booked inventory TRIDENT Dec 25.pdf | 20 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate 141024.pdf | 15 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 ARCHITECT CERTIFICATE 10 Oct 24 Seventh.pdf | 22 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 3092024 Shamraj Construction.pdf | 22 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: ONLY Sanctiond Disclosure of Sold booked inventory TRIDENT Sept 24.pdf | 22 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 ARCHITECT CERTIFICATE 5 JULY 24 Sixth.pdf | 26 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Shamraj Trident A Engineer Certificate JUN 24 Sixth.pdf | 26 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: ONLY Sanctiond Disclosure of Sold booked inventory TRIDENT JUN 24.pdf | 26 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 AS 3062024 Shamraj Construction.pdf | 26 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 ARCHITECT CERTIFICATE 5 APR 24 Fifth.pdf | 21 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 MMC Engineer Certificate MAR24.pdf | 21 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Shamraj Trident A Engineer Certificate Mar 24 Fifth.pdf | 21 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: ONLY Sanctiond Disclosure of Sold booked inventory TRIDENT MAR 24.pdf | 21 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 31 03 24 Shamraj Construction.pdf | 21 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Jan 2024 December quarter compressed.pdf | 19 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Shamraj Trident A Engineer Certificate Dec 23 Fourth.pdf | 19 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: ONLY Sanctiond Disclosure of Sold booked inventory TRIDENT Dec 23.pdf | 19 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 31 12 23 Shamraj Construction.pdf | 19 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Shamraj Form 1 compressed.pdf | 20 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Shamraj Trident A Engineer Certificate Sept 23 Third.pdf | 20 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: ONLY Sanctiond Disclosure of Sold booked inventory TRIDENT Sept 23.pdf | 20 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Upload Form3 30092023 Shamraj Construction compressed.pdf | 20 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 June 23 Trident Shamraj.pdf | 3 Aug 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 June 23 Trident Shamraj.pdf | 3 Aug 2023 |
| Disclosure of sold/ booked inventoryFile: ONLY Sanctiond Disclosure of Sold booked inventory TRIDENT June 23.pdf | 3 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3 June 23 Trident Shamraj.pdf | 3 Aug 2023 |
| Proforma of Agreement for saleFile: Upload with D eviation Final Draft Agreement 25723.pdf | 3 Aug 2023 |
| Deviation Report with respect to model copy of AgreementFile: DEVIATION REPORT Agreement 310723.pdf | 3 Aug 2023 |
| Building plan approvalFile: Sheet no 4.pdf | 2 Jun 2023 |
| Layout approvalFile: Sheet 1-7.pdf | 2 Jun 2023 |
| Building plan approvalFile: Sheet 2-7.pdf | 2 Jun 2023 |
| Building plan approvalFile: Sheet 3-7.pdf | 2 Jun 2023 |
| Building plan approvalFile: Sheet 5-7.pdf | 2 Jun 2023 |
| Building plan approvalFile: Sheet 6-7.pdf | 2 Jun 2023 |
| Building plan approvalFile: Sheet 7-7.pdf | 2 Jun 2023 |
| Building plan approvalFile: Sheet 4-7.pdf | 2 Jun 2023 |
| Details of encumbrances concerned to FinanceFile: Legal Encumberances Trident.pdf | 2 Jun 2023 |
| Details of encumbrances concerned to LegalFile: Legal Encumberances Trident.pdf | 2 Jun 2023 |
| Copy of Layout Approval (in case of layout)File: Sheet 1-7.pdf | 2 Jun 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Sheet 2-7.pdf | 2 Jun 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Sheet 3-7.pdf | 2 Jun 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 103 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep TRIDENT on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Near Taljai Mandir13,700+ in Pune
Filed coordinates, straight-line distance. 142 registered projects within 2 km.
4 Taljai Hills Phase 1
Shri Taljai Mata Associates LLP
CHANDRANGAN REVANTA
CHANDRANGAN BUILDCON LLP
PANORA
OM SAI DEVELOPERS
KADAM HERITAGE SURVEY NO.4/7/1 AND 4/7/2
D & T PROPERTIES
Bhargav Stella
Bhargav Shelters
SHIVALAY 21
SHREE GURUDATTA DEVELOPERS
Builder: Shamraj Constructions
Shamraj Constructions has 1 registration on MahaRERA, including TRIDENT. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if TRIDENT is delayed beyond 31 Dec 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of TRIDENT?
The registered promoter entity is Shamraj Constructions, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in TRIDENT?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for TRIDENT?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at TRIDENT?
The professionals named in the filing: Architect: Mukta Kulkarni; Engineer: J W Consultants Umesh Joshi; Engineer: Shafik Pangarkar; Chartered Accountant: Jayant Kamat; Chartered Accountant: D V Jayade And Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in TRIDENT?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback