Home / Browse projects / Pune, Maharashtra / KADAM HERITAGE SURVEY NO.4/7/1 AND 4/7/2

Registered No litigation declared Others project

KADAM HERITAGE SURVEY NO.4/7/1 AND 4/7/2

By D & T PROPERTIES

RG-MH-67976 · RERA P52100054056 · Last updated on MahaRERA portal: 21 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 7 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
6 of 11Construction stages donefurthest along: Sanitary Fittings within the flats /..., 20%
75 of 163Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 103 documents Report an error

KADAM HERITAGE SURVEY NO.4/7/1 AND 4/7/2 is a Others project by D & T PROPERTIES in Pune, Maharashtra, registered with MahaRERA as P52100054056 on 27 Dec 2023. Possession is promised by 31 Dec 2027. 88 of the 163 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete.

At a glance

Project

  • NameKADAM HERITAGE SURVEY NO.4/7/1 AND 4/7/2
  • TypeOthers
  • Location
    • NEAR TALJAI HILL BUS STOP
    • DHANKAWADI
    • Haveli
    • Pune
    • 411043
  • Pincode411043
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100054056
  • ReraGenie IDRG-MH-67976

Builder

  • NameD & T PROPERTIES
  • Entity typePartnership
  • PartnersABHISHEK PRASAD DESHPANDE, VISHNU SAVLARAM TONDE, KARAN DEEPAK TAMBE, HINDURAO ISHWAR SHINDE
  • Other registrations7 more →
  • Completed2 of 8
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects6 →

Key dates

this monthRegisteredDec 2023PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on27 Dec 2023
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed103 files

Current status

54%88 of 163 units booked
74.0%Work done, per cost certificate

Figures as on 21 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
KADAM HERITAGE SURVEY NO 4/7/1 AND 4/7/2NA171513528163

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 21 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 20%.

KADAM HERITAGE SURVEY NO 4/7/1 AND 4/7/2: 57% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises20%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.10%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 21 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed419

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots419
Closed/Covered419

Land and ownership13

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,200 sq m
Land owned byThe promoter, with other names on the file
Named landowners13
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on3 Dec 2025
LandownerVillageDistrict
KRISHANA RAMBHAU KADAMChinchwadPune
DASHRATH RAMBHAU KADAMPune (M Corp.)Pune
MADHUKAR RAMBHAU KADAMPune (M Corp.)Pune
DIPAK KRISHNA KADAMChinchwadPune
SHUBHANGI MADHUSUDHAN JUGDARChinchwadPune
SUNDAR URF SUNDARABAI DASHRATH KADAMPune (M Corp.)Pune
HEMANT DASHRATH KADAMPune (M Corp.)Pune
VIJAYA SHANKAR KALASEHadapsarPune
MINAKSHI SANTOSH SABALEMundhawaPune
SAVITA RAJU JADHAVPune (M Corp.)Pune
ALKA MADHUKAR KADAMPune (M Corp.)Pune
NITIN MADHUKAR KADAMPune (M Corp.)Pune
SHAILA MADHUKAR KADAMPune (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPune Muncipal Corporation Pune
Permissible FSI7296.73
Proposed, not sanctioned7,297 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBIBEWADI BRANCH PUNE
Estimated costRs 47.97 cr
Cost incurredRs 35.47 cr
Work done73.95%
BuildingWingEstimatedIncurred
KADAM HERITAGE SURVEY NO 4/7/1 AND 4/7/2NARs 43.66 crRs 33.25 cr
-NARs 4.31 crRs 2.22 cr

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAR RUPESH JAMKHINDIKAR Kishor JAMKHINDIKAR
EngineerAJAY BHILARY Bhilare
Chartered AccountantMGSP AND ASSCOIATES
PartnerRole in project
D & T PROPERTIES Unit-2-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 9 Oct 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 Oct 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 9 Oct 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 9 Oct 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed103

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 103 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Kadam Heritage 31122025.pdf21 May 2026
Withdrawal Update Form 1File: Form 1 Kadam Heritage 31122025.pdf21 May 2026
Withdrawal Update Form 1File: Form 1 Kadam Heritage 31122025.pdf21 May 2026
Withdrawal Update Form 2File: KH Form 2 30092025.PDF21 May 2026
Withdrawal Update Form 2File: KH Form 2 30092025.PDF21 May 2026
Withdrawal Update Form 2File: KH Form 2 30092025.PDF21 May 2026
Withdrawal Update Form 3File: CA DOCUMENT20.pdf21 May 2026
Withdrawal Update Form 3File: Kadam Heritage-Form 2-31032026.pdf21 May 2026
Withdrawal Update Form 3File: Kadam Heritage-Form 2-31032026.pdf21 May 2026
Withdrawal Update Form 1File: KH Form 2 30092025.PDF3 Dec 2025
Withdrawal Update Form 1File: KH Form 2 30092025.PDF3 Dec 2025
Withdrawal Update Form 1File: RERA Form I 30092025.pdf3 Dec 2025
Withdrawal Update Form 1File: RERA Form I 30092025.pdf3 Dec 2025
Withdrawal Update Form 2File: KH Form 2 30092025.PDF3 Dec 2025
Withdrawal Update Form 2File: KH Form 2 30092025.PDF3 Dec 2025
Withdrawal Update Form 2File: KH Form 2 30092025.PDF3 Dec 2025
Withdrawal Update Form 2File: KH Form 2 30092025.PDF3 Dec 2025
Withdrawal Update Form 3File: CA DOCUMENT20.pdf3 Dec 2025
Withdrawal Update Form 3File: CA DOCUMENT20.pdf3 Dec 2025
Withdrawal Update Form 3File: CA DOCUMENT20.pdf3 Dec 2025
Withdrawal Update Form 3File: CA DOCUMENT20.pdf3 Dec 2025
Form 1File: Form 1.pdf1 Dec 2025
Form 2File: Engineer Certificate.pdf1 Dec 2025
Form 3File: KH CA FORM 2023.pdf1 Dec 2025
Disclosure of Sold and Booked InventoryFile: KH Sold Unsol.pdf1 Dec 2025
Withdrawal Update Form 1File: RERA Form I 30062025.pdf13 Sep 2025
Withdrawal Update Form 1File: RERA Form I 30062025.pdf13 Sep 2025
Withdrawal Update Form 1File: RERA Form I 30062025.pdf13 Sep 2025
Withdrawal Update Form 2File: Form 2 Kadam Heritage 30062025.PDF13 Sep 2025
Withdrawal Update Form 2File: Form 2 Kadam Heritage 30062025.PDF13 Sep 2025
Withdrawal Update Form 2File: Form 2 Kadam Heritage 30062025.PDF13 Sep 2025
Withdrawal Update Form 3File: CA DOCUMENT20.pdf13 Sep 2025
Withdrawal Update Form 3File: CA DOCUMENT20.pdf13 Sep 2025
Withdrawal Update Form 3File: CA DOCUMENT20.pdf13 Sep 2025
Form 1File: Form 1.pdf12 Jun 2025
Form 2File: Form 2.PDF12 Jun 2025
Form 3File: Form 3 31032025.PDF12 Jun 2025
Disclosure of Sold and Booked InventoryFile: DISCOLSURE OF SOLD 31032025.pdf12 Jun 2025
Form 1File: Form 1 31122024.pdf12 Jun 2025
Form 2File: Form 2 31122024.pdf12 Jun 2025
Form 3File: Form 3 31122024.PDF12 Jun 2025
Disclosure of Sold and Booked InventoryFile: DISCOLSURE OF SOLD 31122024.pdf12 Jun 2025
Form 1File: Form 1 30092024.pdf11 Jun 2025
Form 2File: Form 2 30092024.pdf11 Jun 2025
Form 3File: Form 3 -30092024.PDF11 Jun 2025
Disclosure of Sold and Booked InventoryFile: DISCOLSURE OF SOLD INVENTORY 30092024.pdf11 Jun 2025
Form 1File: Form 1 30062024.pdf11 Jun 2025
Form 2File: Form 2 30062024.pdf11 Jun 2025
Form 3File: Form 3 30062024.PDF11 Jun 2025
Disclosure of Sold and Booked InventoryFile: DISCOLSURE OF SOLD INVENTORY 30062024.pdf11 Jun 2025
Form 1File: Form 1 31032024.pdf11 Jun 2025
Form 2File: Form 2 31032024.pdf11 Jun 2025
Form 3File: Form 3 31032024.pdf11 Jun 2025
Disclosure of Sold and Booked InventoryFile: DISCOLSURE 31032024.pdf11 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA Form I Sep 2024.pdf20 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA Form I Jun 2024.pdf20 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Kadam Heritage 30092024.pdf20 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: KH_ENGG CERT SEP 2024.pdf20 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Kadam Engg Certificate jun2024.pdf20 Feb 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Form 3 Kadam Heritage 30062024.pdf20 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 30062024.pdf28 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 30092024.pdf28 Jan 2025
Disclosure of sold/ booked inventoryFile: DISCOLSURE OF SOLD INVENTORY 30062024.pdf28 Jan 2025
Disclosure of sold/ booked inventoryFile: DISCOLSURE OF SOLD INVENTORY 30092024.pdf28 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA Form I - 31032024.pdf26 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Dhankwadi 31032024 c.pdf26 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Kadam Heritage Engineers Certificate.pdf26 Oct 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold 31032024.pdf26 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Kadam Heritage Quality Assurance.pdf26 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: KH ENGG CERTIFICATE 30092024.pdf24 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Kadam Engg Certificate jun2024.pdf24 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA DOCUMENT20.pdf13 Dec 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Declaration.pdf13 Dec 2023
Declaration in FORM BFile: form b (2).pdf1 Nov 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Abhishek Deshpande.pdf1 Nov 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Hindurao Shinde.pdf1 Nov 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Karan Tambe.pdf1 Nov 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Vishnu Tonde.pdf1 Nov 2023
Layout approvalFile: Plan 01.pdf26 Oct 2023
Copy of Layout Approval (in case of layout)File: Plan 01.pdf26 Oct 2023

How this compares with Pune

54%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep KADAM HERITAGE SURVEY NO.4/7/1 AND 4/7/2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near DHANKAWADI13,700+ in Pune

2 kmKADAM HERITAGE SURVEY NOCompleted 62Lapsed / revoked 22Other 50Dot size: filed unitsN

Filed coordinates, straight-line distance. 134 registered projects within 2 km.

Builder: D & T PROPERTIES

D & T PROPERTIES has 8 registrations on MahaRERA, including GAYTRI APARTMENT and GEETANJALI NAMANA APARTMENT. Its filings disclose 6 earlier MahaRERA projects: declares 2 of 4 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if KADAM HERITAGE SURVEY NO.4/7/1 AND 4/7/2 is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of KADAM HERITAGE SURVEY NO.4/7/1 AND 4/7/2?

The registered promoter entity is D & T PROPERTIES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in KADAM HERITAGE SURVEY NO.4/7/1 AND 4/7/2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for KADAM HERITAGE SURVEY NO.4/7/1 AND 4/7/2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at KADAM HERITAGE SURVEY NO.4/7/1 AND 4/7/2?

The professionals named in the filing: Architect: AR RUPESH JAMKHINDIKAR Kishor JAMKHINDIKAR; Engineer: AJAY BHILARY Bhilare; Chartered Accountant: MGSP AND ASSCOIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in KADAM HERITAGE SURVEY NO.4/7/1 AND 4/7/2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About KADAM HERITAGE SURVEY NO.4/7/1 AND 4/7/2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save KADAM HERITAGE SURVEY NO.4/7/1 AND 4/7/2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.