Home / Browse projects / Nashik, Maharashtra / SURAJ PARK
SURAJ PARK
RG-MH-50073 · RERA P51600052435 · Last updated on MahaRERA portal: 12 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SURAJ PARK is a Residential / Group Housing project by SEVA DEVELOPERS in Nashik, Maharashtra, registered with MahaRERA as P51600052435 on 25 Aug 2023. Possession is promised by 1 Jun 2027. 46 of the 116 units on this registration are recorded sold or booked, and 16 of 33 construction stages are filed complete.
At a glance
Project
- NameSURAJ PARK
- TypeResidential / Group Housing
- Location
- SATPUR SHIWAR
- NASHIK
- Satpur
- 422003
- Pincode422003
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51600052435
- ReraGenie IDRG-MH-50073
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on25 Aug 2023
- Promised completion1 Jun 2027
- Revised completionNone
- Buildings3 building records
- Documents filed65 files
Current status
Figures as on 12 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SURAJ PARK WING A | NA | 7 | 7 | 40 | 0 | 40 |
| SURAJ PARK WING B | NA | 15 | 7 | 42 | 9 | 51 |
| SURAJ PARK WING C | NA | 8 | 7 | 25 | 0 | 25 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 12 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
16 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Internal walls, at 98%.
SURAJ PARK WING A82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
SURAJ PARK WING B61%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 98% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 98% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 75% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
SURAJ PARK WING C41%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 79% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 73% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 12 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed125
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| SURAJ PARK WING A | 50 | 0 | 50 |
| SURAJ PARK WING B | 37 | 0 | 37 |
| SURAJ PARK WING C | 29 | 9 | 38 |
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| SEVA DEVELOPERS | Nashik (M Corp.) | Nashik |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| SURAJ PARK WING A | NA | Rs 16.52 cr | Rs 15.36 cr |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SATISH GAIKWAD |
| Architect | GAIKWAD ASSOCIATES |
| Engineer | JAYESH MAKWANA |
| Chartered Accountant | DVS AND COMPANY |
| Chartered Accountant | S.G KUNDANANI & CO |
| Partner | Role in project |
|---|---|
| SEVA DEVELOPERS | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 9 Aug 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 7 Jul 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 7 Jul 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 7 Jul 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 1 Jun 2027
Documents filed65
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: ARCHITECT FORM 1.pdf | 12 May 2026 |
| Withdrawal Update Form 2File: 2026-04-29_FOR RERA.pdf | 12 May 2026 |
| Withdrawal Update Form 3File: Kaagaz_20260508_141116506305_page-0007-compressed.pdf | 12 May 2026 |
| Withdrawal Update Form 1File: Architech Certificate.pdf | 14 Apr 2026 |
| Withdrawal Update Form 2File: engineer certificate.pdf | 14 Apr 2026 |
| Withdrawal Update Form 3File: CA certificate.pdf | 14 Apr 2026 |
| Form 5 (FY 2024-2025)File: RARA FORM 5 SEVA DEVLOPERS.pdf | 7 Jan 2026 |
| Withdrawal Update Form 1File: ARCHITECH FORM 1.pdf | 1 Nov 2025 |
| Withdrawal Update Form 1File: ARCHITECH FORM 1.pdf | 1 Nov 2025 |
| Withdrawal Update Form 1File: ARCHITECH FORM 1.pdf | 1 Nov 2025 |
| Withdrawal Update Form 1File: ARCHITECH FORM 1.pdf | 1 Nov 2025 |
| Withdrawal Update Form 2File: ENGINEER FORM 2.pdf | 1 Nov 2025 |
| Withdrawal Update Form 2File: ENGINEER FORM 2.pdf | 1 Nov 2025 |
| Withdrawal Update Form 2File: ENGINEER FORM Q2.pdf | 1 Nov 2025 |
| Withdrawal Update Form 2File: ENGINEER FORM Q2.pdf | 1 Nov 2025 |
| Withdrawal Update Form 3File: CA FORM 3.pdf | 1 Nov 2025 |
| Withdrawal Update Form 3File: CA FORM 3.pdf | 1 Nov 2025 |
| Withdrawal Update Form 3File: CA FORM 3.pdf | 1 Nov 2025 |
| Withdrawal Update Form 3File: CA FORM 3.pdf | 1 Nov 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA FORM 3 MARCH 25.pdf | 21 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: BOOKING.pdf | 21 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: DocScanner 11-Apr-2025 12-56 pm.pdf | 16 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2025-04-10_FOR RERA.pdf | 16 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: DocScanner 05-Mar-2025 3-39 pm (1).pdf | 11 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Kaagaz_20250227_194312384200 (1).pdf | 11 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2025-02-27_FOR RERA (1).pdf | 11 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Kaagaz_20241014_170535453420 (1).pdf | 25 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: engineer certificate.pdf | 25 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: DocScanner 08-Jul-2024 1-29 pm.pdf | 11 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE (2).pdf | 11 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate-compressed.pdf | 16 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate-compressed.pdf | 16 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate.pdf | 29 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ca certificate_.pdf | 29 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE.pdf | 19 Aug 2023 |
| Copy of the legal title reportFile: LEGAL TITLE REPORT.pdf | 9 Aug 2023 |
| Details of encumbrances concerned to FinanceFile: LEGAL ENCUMBRANCE.pdf | 26 Jul 2023 |
| Details of encumbrances concerned to LegalFile: LEGAL ENCUMBRANCE.pdf | 26 Jul 2023 |
| Declaration about Commencement CertificateFile: FORMAT D - COMMENCEMENT CERTIFICATE UPDATED.pdf | 26 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENG CERTIFICATE UPDATE.pdf | 26 Jul 2023 |
| Copy of the legal title reportFile: title report seva.pdf | 19 Jul 2023 |
| Building plan approvalFile: BUILDING PLAN WING A_compressed.pdf | 7 Jul 2023 |
| Building plan approvalFile: BUILDING PLAN WING b_compressed.pdf | 7 Jul 2023 |
| Building plan approvalFile: BUILDING PLAN WING C_compressed.pdf | 7 Jul 2023 |
| Layout approvalFile: LAYOUT.pdf | 7 Jul 2023 |
| Details of encumbrances concerned to FinanceFile: financial encumbrance.pdf | 7 Jul 2023 |
| Details of encumbrances concerned to LegalFile: financial encumbrance.pdf | 7 Jul 2023 |
| Copy of Layout Approval (in case of layout)File: LAYOUT.pdf | 7 Jul 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: BUILDING PLAN WING A_compressed.pdf | 7 Jul 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: BUILDING PLAN WING b_compressed.pdf | 7 Jul 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: BUILDING PLAN WING C_compressed.pdf | 7 Jul 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT_compressed.pdf | 7 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate.pdf | 7 Jul 2023 |
| CERSAI detailsFile: CERSAI_Search_Report_200273780835_For_Asset_Based_Search_07_07_2023_18_07_33_067.pdf | 7 Jul 2023 |
| Proforma of Agreement for saleFile: Agrement to sale -shop.pdf | 7 Jul 2023 |
| Proforma of Agreement for saleFile: Agrement to sale -residential.pdf | 7 Jul 2023 |
| Deviation Report with respect to model copy of AgreementFile: DEVIATION REPORT- AGREMENT TOSALE.pdf | 7 Jul 2023 |
| PAN CardFile: pan seva developers.pdf | 28 Jun 2023 |
| Copy of the legal title reportFile: Title Search RERASUNIL RAMBHAU SASLE.pdf | 28 Jun 2023 |
| Declaration about Commencement CertificateFile: commencement certificate.pdf | 28 Jun 2023 |
| Declaration in FORM BFile: affidavit cum declaration.pdf | 28 Jun 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: disclosure of interest in other real estate org.pdf | 28 Jun 2023 |
| Proforma of Allotment letterFile: allotment letter.pdf | 28 Jun 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: declaration about separate bank account.pdf | 28 Jun 2023 |
| Deviation Report with respect to Allotment letterFile: no deviation in allotment letter.pdf | 28 Jun 2023 |
Promoter's earlier projects2
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| YASH RESIDENCY | PLOT NO 40 45 SURVEY NO 53-2 | 1 | Completed | Mar 2019 | Nov 2018 |
| KANIKA APARTMENT | PLOT NO 13 | 7 | Completed | Oct 2013 | Late, Nov 2014 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nashik
Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.
Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 2 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 65 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SURAJ PARK on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near NASHIK4,100+ in Nashik
Filed coordinates, straight-line distance. 58 registered projects within 2 km.
THE PLATINUM MALL BY PARKSYDE
JAIKUMAR CONSTRUCTIONS LTD
AVADH UTOPIA
DHATRAK CONSTRUWELL
ROONGTA ELEGANTE APARTMENT
ROONGTA LANDMARKS LLP
Siddhivinayak Trade Center
Dhatrak Constructions
G SQUARE
GIRI ASSOCIATE CONSTRUCTION
SADGURU HOMES
SHREE SADGURU HOMES
See every Nashik project, with the district possession charts
Builder: SEVA DEVELOPERS
SEVA DEVELOPERS has 3 registrations on MahaRERA, including YASH REIDENCY and SURAJ PARK. Its filings disclose 2 earlier MahaRERA projects: declares 1 of 2 past projects completed on time. Read the full track record. See more projects on the Nashik district page.
Frequently asked questions
What are my rights if SURAJ PARK is delayed beyond 1 Jun 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SURAJ PARK?
The registered promoter entity is SEVA DEVELOPERS, a partnership as per the filing. Its GSTIN 27ACLFS3315H1Z1 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SURAJ PARK?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SURAJ PARK?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SURAJ PARK?
The professionals named in the filing: Architect: SATISH GAIKWAD; Architect: GAIKWAD ASSOCIATES; Engineer: JAYESH MAKWANA; Chartered Accountant: DVS AND COMPANY; Chartered Accountant: S.G KUNDANANI & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SURAJ PARK?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback