Registered No litigation declared Residential / Group Housing project

SURAJ PARK

By SEVA DEVELOPERS

RG-MH-50073 · RERA P51600052435 · Last updated on MahaRERA portal: 12 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Jun 2027Possession promisedno revision filed
16 of 33Construction stages doneacross 3 buildings; furthest along: Internal walls, 98%
70 of 116Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 65 documents Report an error

SURAJ PARK is a Residential / Group Housing project by SEVA DEVELOPERS in Nashik, Maharashtra, registered with MahaRERA as P51600052435 on 25 Aug 2023. Possession is promised by 1 Jun 2027. 46 of the 116 units on this registration are recorded sold or booked, and 16 of 33 construction stages are filed complete.

At a glance

Project

  • NameSURAJ PARK
  • TypeResidential / Group Housing
  • Location
    • SATPUR SHIWAR
    • NASHIK
    • Satpur
    • 422003
  • Pincode422003
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51600052435
  • ReraGenie IDRG-MH-50073

Builder

  • NameSEVA DEVELOPERS
  • Entity typePartnership
  • GSTIN27ACLFS3315H1Z1
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnerPRAKASH CHANDUMAL GOKLANI
  • Other registrations2 more →
  • Completed1 of 3
  • Declared earlier projects2 →

Key dates

this monthRegisteredAug 2023PromisedJun 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on25 Aug 2023
  • Promised completion1 Jun 2027
  • Revised completionNone
  • Buildings3 building records
  • Documents filed65 files

Current status

40%46 of 116 units booked
93.0%Work done, per cost certificate

Figures as on 12 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SURAJ PARK WING ANA7740040
SURAJ PARK WING BNA15742951
SURAJ PARK WING CNA8725025

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 12 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

16 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Internal walls, at 98%.

SURAJ PARK WING A82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
SURAJ PARK WING B61%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises98%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks98%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.75%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
SURAJ PARK WING C41%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure79%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks73%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 12 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed125

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots125
Closed/Covered116
Open Space9
BuildingClosed/CoveredOpen SpaceTotal
SURAJ PARK WING A50050
SURAJ PARK WING B37037
SURAJ PARK WING C29938

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,259 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on12 May 2026
LandownerVillageDistrict
SEVA DEVELOPERSNashik (M Corp.)Nashik

Approvals and building plan

Sanctioning authorityTOWN PLANNING NASHIK MUNCIPAL CORPORATION
Permissible FSI7227.0
Proposed, not sanctioned7,227 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchASHOK NAGAR BRANCH RAJDEEP CHATE COACHING CLASSES NASHIK
Estimated costRs 16.52 cr
Cost incurredRs 15.36 cr
Work done93.0%
BuildingWingEstimatedIncurred
SURAJ PARK WING ANARs 16.52 crRs 15.36 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSATISH GAIKWAD
ArchitectGAIKWAD ASSOCIATES
EngineerJAYESH MAKWANA
Chartered AccountantDVS AND COMPANY
Chartered AccountantS.G KUNDANANI & CO
PartnerRole in project
SEVA DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 9 Aug 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 7 Jul 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 7 Jul 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 7 Jul 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 1 Jun 2027

Documents filed65

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: ARCHITECT FORM 1.pdf12 May 2026
Withdrawal Update Form 2File: 2026-04-29_FOR RERA.pdf12 May 2026
Withdrawal Update Form 3File: Kaagaz_20260508_141116506305_page-0007-compressed.pdf12 May 2026
Withdrawal Update Form 1File: Architech Certificate.pdf14 Apr 2026
Withdrawal Update Form 2File: engineer certificate.pdf14 Apr 2026
Withdrawal Update Form 3File: CA certificate.pdf14 Apr 2026
Form 5 (FY 2024-2025)File: RARA FORM 5 SEVA DEVLOPERS.pdf7 Jan 2026
Withdrawal Update Form 1File: ARCHITECH FORM 1.pdf1 Nov 2025
Withdrawal Update Form 1File: ARCHITECH FORM 1.pdf1 Nov 2025
Withdrawal Update Form 1File: ARCHITECH FORM 1.pdf1 Nov 2025
Withdrawal Update Form 1File: ARCHITECH FORM 1.pdf1 Nov 2025
Withdrawal Update Form 2File: ENGINEER FORM 2.pdf1 Nov 2025
Withdrawal Update Form 2File: ENGINEER FORM 2.pdf1 Nov 2025
Withdrawal Update Form 2File: ENGINEER FORM Q2.pdf1 Nov 2025
Withdrawal Update Form 2File: ENGINEER FORM Q2.pdf1 Nov 2025
Withdrawal Update Form 3File: CA FORM 3.pdf1 Nov 2025
Withdrawal Update Form 3File: CA FORM 3.pdf1 Nov 2025
Withdrawal Update Form 3File: CA FORM 3.pdf1 Nov 2025
Withdrawal Update Form 3File: CA FORM 3.pdf1 Nov 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA FORM 3 MARCH 25.pdf21 Apr 2025
Disclosure of sold/ booked inventoryFile: BOOKING.pdf21 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: DocScanner 11-Apr-2025 12-56 pm.pdf16 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2025-04-10_FOR RERA.pdf16 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: DocScanner 05-Mar-2025 3-39 pm (1).pdf11 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Kaagaz_20250227_194312384200 (1).pdf11 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2025-02-27_FOR RERA (1).pdf11 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Kaagaz_20241014_170535453420 (1).pdf25 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: engineer certificate.pdf25 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: DocScanner 08-Jul-2024 1-29 pm.pdf11 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE (2).pdf11 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate-compressed.pdf16 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate-compressed.pdf16 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate.pdf29 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ca certificate_.pdf29 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE.pdf19 Aug 2023
Copy of the legal title reportFile: LEGAL TITLE REPORT.pdf9 Aug 2023
Details of encumbrances concerned to FinanceFile: LEGAL ENCUMBRANCE.pdf26 Jul 2023
Details of encumbrances concerned to LegalFile: LEGAL ENCUMBRANCE.pdf26 Jul 2023
Declaration about Commencement CertificateFile: FORMAT D - COMMENCEMENT CERTIFICATE UPDATED.pdf26 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENG CERTIFICATE UPDATE.pdf26 Jul 2023
Copy of the legal title reportFile: title report seva.pdf19 Jul 2023
Building plan approvalFile: BUILDING PLAN WING A_compressed.pdf7 Jul 2023
Building plan approvalFile: BUILDING PLAN WING b_compressed.pdf7 Jul 2023
Building plan approvalFile: BUILDING PLAN WING C_compressed.pdf7 Jul 2023
Layout approvalFile: LAYOUT.pdf7 Jul 2023
Details of encumbrances concerned to FinanceFile: financial encumbrance.pdf7 Jul 2023
Details of encumbrances concerned to LegalFile: financial encumbrance.pdf7 Jul 2023
Copy of Layout Approval (in case of layout)File: LAYOUT.pdf7 Jul 2023
Building Plan Approval / NA Order for plotted developmentFile: BUILDING PLAN WING A_compressed.pdf7 Jul 2023
Building Plan Approval / NA Order for plotted developmentFile: BUILDING PLAN WING b_compressed.pdf7 Jul 2023
Building Plan Approval / NA Order for plotted developmentFile: BUILDING PLAN WING C_compressed.pdf7 Jul 2023
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT_compressed.pdf7 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate.pdf7 Jul 2023
CERSAI detailsFile: CERSAI_Search_Report_200273780835_For_Asset_Based_Search_07_07_2023_18_07_33_067.pdf7 Jul 2023
Proforma of Agreement for saleFile: Agrement to sale -shop.pdf7 Jul 2023
Proforma of Agreement for saleFile: Agrement to sale -residential.pdf7 Jul 2023
Deviation Report with respect to model copy of AgreementFile: DEVIATION REPORT- AGREMENT TOSALE.pdf7 Jul 2023
PAN CardFile: pan seva developers.pdf28 Jun 2023
Copy of the legal title reportFile: Title Search RERASUNIL RAMBHAU SASLE.pdf28 Jun 2023
Declaration about Commencement CertificateFile: commencement certificate.pdf28 Jun 2023
Declaration in FORM BFile: affidavit cum declaration.pdf28 Jun 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: disclosure of interest in other real estate org.pdf28 Jun 2023
Proforma of Allotment letterFile: allotment letter.pdf28 Jun 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: declaration about separate bank account.pdf28 Jun 2023
Deviation Report with respect to Allotment letterFile: no deviation in allotment letter.pdf28 Jun 2023

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
YASH RESIDENCYPLOT NO 40 45 SURVEY NO 53-21CompletedMar 2019Nov 2018
KANIKA APARTMENTPLOT NO 137CompletedOct 2013Late, Nov 2014

How this compares with Nashik

40%of this project is bookeddistrict median 17%
10%of Nashik projects moved their completion datethis one has not
19%of Nashik registrations have lapsed or been cancelledthis one is on the register

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SURAJ PARK on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NASHIK4,100+ in Nashik

2 kmSURAJ PARKCompleted 28Lapsed / revoked 12Other 18Dot size: filed unitsN

Filed coordinates, straight-line distance. 58 registered projects within 2 km.

Builder: SEVA DEVELOPERS

SEVA DEVELOPERS has 3 registrations on MahaRERA, including YASH REIDENCY and SURAJ PARK. Its filings disclose 2 earlier MahaRERA projects: declares 1 of 2 past projects completed on time. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What are my rights if SURAJ PARK is delayed beyond 1 Jun 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SURAJ PARK?

The registered promoter entity is SEVA DEVELOPERS, a partnership as per the filing. Its GSTIN 27ACLFS3315H1Z1 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SURAJ PARK?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SURAJ PARK?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SURAJ PARK?

The professionals named in the filing: Architect: SATISH GAIKWAD; Architect: GAIKWAD ASSOCIATES; Engineer: JAYESH MAKWANA; Chartered Accountant: DVS AND COMPANY; Chartered Accountant: S.G KUNDANANI & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SURAJ PARK?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SURAJ PARK. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SURAJ PARK to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.