ReraGenieLog inGet a buyer report

Home / Browse projects / Raigarh, Maharashtra / Supriya

Completed No litigation declared Plotted project

Supriya

By Herrlich Developers Private Limited

RG-MH-09844 · RERA P52000000536 · Last updated on MahaRERA portal: 12 Dec 2024

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 3 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2021Possession promisedregistration recorded completed
8 of 19Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 86 documents Report an error

Supriya is a Plotted project by Herrlich Developers Private Limited in Raigarh, Maharashtra, registered with MahaRERA as P52000000536 on 18 Jul 2017. The registration is recorded completed; possession was promised by 30 Dec 2021. 11 of the 19 units on this registration are recorded sold or booked.

At a glance

Project

  • NameSupriya
  • TypePlotted
  • Location
    • Adoshi
    • Khalapur
    • Raigarh
    • 410203
  • Pincode410203
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000000536
  • ReraGenie IDRG-MH-09844

Builder

  • NameHerrlich Developers Private Limited
  • Entity typeCompany
  • Managing DirectorsAsha Laxman Bhatia, Cyrus Kekobad Pithawalla
  • Other registrations3 more →
  • Completed2 of 4

Key dates

this monthRegisteredJul 2017PromisedDec 2021Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on18 Jul 2017
  • Promised completion30 Dec 2021
  • Revised completionNone
  • BuildingsNot stated in filing
  • Documents filed86 files

Current status

58%11 of 19 units booked

Figures as on 12 Dec 2024, this project's latest MahaRERA filing.

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 12 Dec 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

NA Plot Without Structure:

ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 12 Dec 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyNoNot applicable
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area26,522 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI3095.0
Proposed, not sanctioned3,095 sq m

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchHiranandani Gardens Powai, Mumbai 400076

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSwaroop Revankar
PartnerRole in project
Herrlich Developers Private Limited-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 13 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Nov 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Nov 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Nov 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 12 Dec 2024

Documents filed86

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 86 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: ACR CER HERRLICH SECTOR 1 AND 2.pdf12 Dec 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: HERRLICH01033420241212163722.pdf12 Dec 2024
Architect’s Certificate on Completion of Project (Form 4)File: Supriya Certificate.pdf10 Dec 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Herrlich Letter to Tahasildar Sec 1 2-7.pdf10 Dec 2024
Disclosure of sold/ booked inventoryFile: DIS SO BO -Supriya.pdf9 Feb 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: FORM-4 Supriya.pdf9 Feb 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Supriya Certificate.pdf31 Jan 2023
Certificates of CA (Form 5)File: Herrlich Developers SUPRIYA.pdf5 Feb 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Herrlich Developers SUPRIYA.pdf5 Feb 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: Supriya_PDF.pdf9 Aug 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Supriya Arch Cer.pdf23 Mar 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Supriya Engg Cer.pdf23 Mar 2021
Certificates of CA (Form 3)File: Supriya Farms CA Cer.pdf23 Mar 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Supriya Arch Cft.pdf18 Nov 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Supriya Engr Cft.pdf18 Nov 2020
Certificates of CA (Form 3)File: Supriya CA Cert.pdf18 Nov 2020
Certificates of CA (Form 5)File: Supriya FORM V.pdf18 Nov 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Supriya FORM V.pdf18 Nov 2020
Details of Restarting of Construction work post lockdownFile: Supriya Farms Post lock down.pdf2 Jul 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SUPRIYA ARCHI CERTI.pdf21 Apr 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SUPRIYA ENGI CERTI.pdf21 Apr 2020
Certificates of CA (Form 3)File: RERA CA CERT Supriya.pdf21 Apr 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SUPRIYA ARCHI CERT.pdf18 Jan 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: JOY ENGI CERT.pdf18 Jan 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SUPRIYA ENGI CERT.pdf18 Jan 2020
Certificates of CA (Form 3)File: JOY CA CERT.pdf18 Jan 2020
Certificates of CA (Form 3)File: SUPRIYA CA CERT.pdf18 Jan 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SUPRIYA ARCHI CERTI.pdf20 Dec 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SUPRIYA ENGI CERTI.pdf20 Dec 2019
Certificates of CA (Form 3)File: SUPRIYA CA CERTI.pdf20 Dec 2019
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: SUPRIYA ANNUAL REPORT.pdf20 Dec 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SUPRIYA ARCHI CERTI.pdf5 Sep 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SUPRIYA ENGI CERTI.pdf5 Sep 2019
Certificates of CA (Form 3)File: SUPRIYA CA CERTI.pdf5 Sep 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SUPRIYA ARCHI CERTI.pdf14 Jun 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SUPRIYA ENGI CERTI.pdf14 Jun 2019
Certificates of CA (Form 3)File: SUPRIYA CA CERTI.pdf14 Jun 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SUPRIYA ARCHI CERTI.pdf12 Feb 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SUPRIYA ENGI CERTI.pdf12 Feb 2019
Certificates of CA (Form 3)File: SUPRIYA CA CERTI.pdf12 Feb 2019
Layout approvalFile: SUPRIYA DECLARATION.pdf30 Nov 2018
Layout approvalFile: Supriya Farms Layout 2018.pdf30 Nov 2018
Building plan approval or NA orderFile: Supriya Farms Layout 2018.pdf30 Nov 2018
Copy of Layout Approval (in case of layout)File: SUPRIYA DECLARATION.pdf30 Nov 2018
Copy of Layout Approval (in case of layout)File: Supriya Farms Layout 2018.pdf30 Nov 2018
Building Plan Approval (IOD)File: Supriya Farms Layout 2018.pdf30 Nov 2018
Commencement Certificates / NA Order for plotted developmentFile: N A Order Supriya Farms 2018.pdf30 Nov 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SUPRIYA ARCHI CERTI.pdf30 Nov 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SUPRIYA ARCHI CERTI.pdf30 Nov 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SUPRIYA ENGI CERTI.pdf30 Nov 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SUPRIYA ENGI CERTI.pdf30 Nov 2018
Certificates of CA (Form 3)File: SUPRIYA CA CERTI.pdf30 Nov 2018
Certificates of CA (Form 3)File: SUPRIYA CA CERTI.pdf30 Nov 2018
Certificates of CA (Form 5)File: SUPRIYA FORM 5.pdf19 Nov 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Supriya Farms Arch Certificate.pdf16 Apr 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Supriya Farms Engg Certificate.pdf16 Apr 2018
Certificates of CA (Form 3)File: Supriya Farms C A Certificate.pdf16 Apr 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Supriya Arch Cert.pdf15 Jan 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Supriya Engg Cert.pdf15 Jan 2018
Certificates of CA (Form 3)File: Supriya C A Certificate.pdf15 Jan 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Supriya Architect Certi.pdf16 Oct 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Supriya Engi Certi.pdf16 Oct 2017
Certificates of CA (Form 3)File: Supriya C A Certi.pdf16 Oct 2017
Layout approvalFile: SUPRIYA FARMS Plans.pdf15 Jul 2017
Building plan approval or NA orderFile: SUPRIYA FARMS Plans.pdf15 Jul 2017
Copy of Layout Approval (in case of layout)File: SUPRIYA FARMS Plans.pdf15 Jul 2017
Building Plan Approval (IOD)File: SUPRIYA FARMS Plans.pdf15 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: SUPRIYA FARMS Plans.pdf15 Jul 2017
Declaration in FORM BFile: SUPRIYA AFFI AND DECLARATION.pdf15 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eng certificate.pdf15 Jul 2017
Building plan approval or NA orderFile: SUPRIYA N A Order.pdf14 Jul 2017
Layout approvalFile: SUPRIYA N A Order.pdf14 Jul 2017
Copy of Layout Approval (in case of layout)File: SUPRIYA N A Order.pdf14 Jul 2017
Building Plan Approval (IOD)File: SUPRIYA N A Order.pdf14 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: SUPRIYA N A Order.pdf14 Jul 2017
Building plan approval or NA orderFile: SUPRIYA FARMS Plans.pdf13 Jul 2017
Layout approvalFile: Self DECLARATION.pdf13 Jul 2017
PAN CardFile: Pan Card.pdf13 Jul 2017
Copy of the legal title reportFile: TC of Supriya Farms.pdf13 Jul 2017
Details of encumbrancesFile: Supriya Farms Self Decla.pdf13 Jul 2017

How this compares with Raigarh

58%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is completed

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Supriya on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Adoshi5,900+ in Raigarh

2 kmSupriyaCompleted 18Dot size: filed unitsN

Filed coordinates, straight-line distance. 18 registered projects within 2 km.

Builder: Herrlich Developers Private Limited

Herrlich Developers Private Limited has 4 registrations on MahaRERA, including Supriya and SUP. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if Supriya is delayed beyond 30 Dec 2021?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Supriya?

The registered promoter entity is Herrlich Developers Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Supriya?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Supriya?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Supriya?

The professionals named in the filing: Architect: Swaroop Revankar. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Supriya?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Supriya. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Supriya to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.