Home / Browse projects / Mumbai Suburban, Maharashtra / Sunteck Pinnacle

Completed No litigation declared Commercial project

Sunteck Pinnacle

By Sunteck Realty Limited

RG-MH-29698 · RERA P51800028821 · Last updated on MahaRERA portal: 4 Oct 2023

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 24 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Sep 2023Possession promisedregistration recorded completed
9 of 11Construction stages donefurthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 72 documents Report an error

Sunteck Pinnacle is a Commercial project by Sunteck Realty Limited in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800028821 on 30 Mar 2021. The registration is recorded completed; possession was promised by 30 Sep 2023.

At a glance

Project

  • NameSunteck Pinnacle
  • TypeCommercial
  • Location
    • Ram Mandir Road
    • Borivali
    • Mumbai Suburban
    • 400104
  • Pincode400104
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800028821
  • ReraGenie IDRG-MH-29698

Builder

  • NameSunteck Realty Limited
  • Entity typeCompany
  • CINL32100MH1981PLC025346
  • CIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • DirectorRachana Hingarajia
  • Other registrations24 more →
  • Completed10 of 25
  • No longer live3 lapsed, de-registered or revoked
  • Declared earlier projects6 →

Key dates

this monthRegisteredMar 2021PromisedSep 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on30 Mar 2021
  • Promised completion30 Sep 2023
  • Revised completionNone
  • Buildings1 building record
  • Documents filed72 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Sunteck PinnacleNA70000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 4 Oct 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

Sunteck Pinnacle: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 4 Oct 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed90

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots90
Closed/Covered90

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,086 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI4211.0
Proposed, not sanctioned4,010 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMANEK SMRUTI, TPS II,NEHRU ROAD,VILE PARLE - EAST MUMBAI MAHARASHTRA-400 057

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSandeep Shikre & Associates
EngineerJagdish Korgaonkar
Chartered AccountantJHANWAR & MAHESHWARI
Chartered AccountantN. Somani & Company
PartnerRole in project
Sunteck Realty Limited-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Mar 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 Mar 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Mar 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 14 Apr 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 17 Apr 2023

Documents filed72

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5-CA CERTIFICATE ANNUAL REPORT Sunteck Pinnacle_2022-23.pdf4 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A Quality Assurance Certificate SPinnacle-06_Mar-23.pdf9 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-ARCHITECT'S CERTIFICATE Pinnacle_Mar-23.pdf28 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-ENGINEER'S CERTIFICATE Pinnacle_Mar-23.pdf28 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-CA CERTIFICATE Pinnacle_Mar-23.pdf28 Apr 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Part OC dated 21-03-2023.pdf17 Apr 2023
Architect’s Certificate on Completion of Project (Form 4)File: Annexure E-Form 4- Architect Certificate_Sunteck Pinnacle .pdf17 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-ARCHITECT'S CERTIFICATE Pinnacle_Jan-23.pdf20 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-ENGINEER'S CERTIFICATE Pinnacle_Jan-23.pdf20 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-CA CERTIFICATE Pinnacle_Jan-23.pdf20 Jan 2023
Declaration about Commencement CertificateFile: Format D-DECLARATION ABOUT COMMENCEMENT CERTIFICATE Pinnacle.pdf2 Dec 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-ARCHITECT'S CERTIFICATE Pinnacle_Oct-22.pdf13 Oct 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-ENGINEER'S CERTIFICATE Pinnacle_Oct-22.pdf13 Oct 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-CA CERTIFICATE Pinnacle_Oct-22.pdf13 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5-CA CERTIFICATE ANNUAL REPORT Sunteck Pinnacle_2021-22.pdf30 Sep 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate Sunteck Pinnacle_July-22.pdf8 Aug 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER'S CERTIFICATE Pinnacle_July-22.pdf8 Aug 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2022 07 Form 3-CA Certificate Pinnacle_July-22.pdf8 Aug 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2 ENGINEER'S CERTIFICATE Annex Aug-21.pdf3 Jun 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2 ENGINEER'S CERTIFICATE Annex Oct-21.pdf3 Jun 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Sunteck Pinnacle_Aug-21.pdf2 Jun 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2021 12 Form 3-CA Certificate Pinnacle_2021 12 06.pdf2 Jun 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2022 01 Form 3-CA Certificate Pinnacle_2022 01 07.pdf2 Jun 2022
Commencement Certificates / NA Order for plotted developmentFile: 2022 04 13 CC Above Plinth Pinacle.pdf14 Apr 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate Sunteck Pinnacle_Mar-22.pdf14 Apr 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER'S CERTIFICATE Pinnacle_Mar-22.pdf14 Apr 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A Quality Assurance Certificate SPinnacle-05_Mar-22.pdf14 Apr 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2022 04 Form 3-CA Certificate Pinnacle_2022 04 07.pdf14 Apr 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER'S CERTIFICATE Pinnacle_Jan-22.pdf10 Jan 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate Sunteck Pinnacle_Jan-22.pdf8 Jan 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A Quality Assurance Certificate SPinnacle-04_Dec-21.pdf8 Jan 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate Sunteck Pinnacle_Oct-21.pdf12 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5-Pinnacle-2020-21.pdf30 Sep 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A Quality Assurance Certificate Annex-03_Sep-21.pdf24 Sep 2021
Commencement Certificates / NA Order for plotted developmentFile: 2021 08 18 Annex CC till plinth Approval till 18th.pdf6 Sep 2021
Details of encumbrancesFile: CERSAI_Search_Report_Security_Interest_Id_Based_Search_05_12_2020_11_26_16_386.pdf23 Aug 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate Sunteck Pinnacle_Aug-21.pdf23 Aug 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate Sunteck Pinnacle_June-21.pdf22 Jun 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A Quality Assurance Certificate Annex_June-21.pdf22 Jun 2021
Layout approvalFile: Plan 01.pdf26 Mar 2021
Building plan approvalFile: Plan 02.pdf26 Mar 2021
Building plan approvalFile: Plan 03.pdf26 Mar 2021
Building plan approvalFile: Plan 04.pdf26 Mar 2021
Building plan approvalFile: Plan 05.pdf26 Mar 2021
Building plan approvalFile: Plan 06.pdf26 Mar 2021
Building plan approvalFile: Plan 07.pdf26 Mar 2021
Building plan approvalFile: Plan 08.pdf26 Mar 2021
Building plan approvalFile: Plan 09.pdf26 Mar 2021
Building plan approvalFile: Plan 10.pdf26 Mar 2021
Building plan approvalFile: Plan 11.pdf26 Mar 2021
Copy of the legal title reportFile: Title Certificate Skystar Buildcon 26032021.pdf26 Mar 2021
Copy of Layout Approval (in case of layout)File: Plan 01.pdf26 Mar 2021
Building Plan Approval / NA Order for plotted developmentFile: Plan 02.pdf26 Mar 2021
Building Plan Approval / NA Order for plotted developmentFile: Plan 03.pdf26 Mar 2021
Building Plan Approval / NA Order for plotted developmentFile: Plan 04.pdf26 Mar 2021
Building Plan Approval / NA Order for plotted developmentFile: Plan 05.pdf26 Mar 2021
Building Plan Approval / NA Order for plotted developmentFile: Plan 06.pdf26 Mar 2021
Building Plan Approval / NA Order for plotted developmentFile: Plan 07.pdf26 Mar 2021
Building Plan Approval / NA Order for plotted developmentFile: Plan 08.pdf26 Mar 2021
Building Plan Approval / NA Order for plotted developmentFile: Plan 09.pdf26 Mar 2021
Building Plan Approval / NA Order for plotted developmentFile: Plan 10.pdf26 Mar 2021
Building Plan Approval / NA Order for plotted developmentFile: Plan 11.pdf26 Mar 2021
Proforma of Allotment letterFile: Alloment Letter and Agreement Sunteck Pinnacle in Avenue 2 (Post regn).pdf26 Mar 2021
PAN CardFile: Skystar pancard [AANCS9331A].pdf25 Mar 2021
Details of encumbrancesFile: Encumbrance certificate with Sign and stamp.pdf25 Mar 2021
Commencement Certificates / NA Order for plotted developmentFile: CC 25032021.pdf25 Mar 2021
Declaration in FORM BFile: Form B Declaration.pdf25 Mar 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Architect's CertificateSunteck Pinnacle24032021.pdf25 Mar 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 ENGINEER'S CERTIFICATE Annex.pdf25 Mar 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A Quality Assurance Certificate Annex.pdf25 Mar 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Sunteck Pinnacle.pdf25 Mar 2021
OtherFile: Declaration for Proposed area sign and stamp.pdf25 Mar 2021

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Sunteck Pinnacle on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Ram Mandir Road6,700+ in Mumbai Suburban

2 kmSunteck PinnacleCompleted 154Lapsed / revoked 87Abeyance 1Other 152Dot size: filed unitsN

Filed coordinates, straight-line distance. 394 registered projects within 2 km.

Builder: Sunteck Realty Limited

Sunteck Realty Limited has 25 registrations on MahaRERA, including Sunteck City Avenue 1 and Sunteck City Avenue 2. Its filings disclose 6 earlier MahaRERA projects: declares 4 of 6 past projects completed on time. Litigation is declared on 12 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Sunteck Pinnacle is delayed beyond 30 Sep 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Sunteck Pinnacle?

The registered promoter entity is Sunteck Realty Limited, a company as per the filing. Its CIN L32100MH1981PLC025346 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Sunteck Pinnacle?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Sunteck Pinnacle?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Sunteck Pinnacle?

The professionals named in the filing: Architect: Sandeep Shikre & Associates; Engineer: Jagdish Korgaonkar; Chartered Accountant: JHANWAR & MAHESHWARI; Chartered Accountant: N. Somani & Company. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Sunteck Pinnacle?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Sunteck Pinnacle. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Sunteck Pinnacle to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.