Home / Browse projects / Mumbai Suburban, Maharashtra / Sunteck Icon, Kolekalyan, CST Road, Kalina, Santacruz East, Mumbai
Sunteck Icon, Kolekalyan, CST Road, Kalina, Santacruz East, Mumbai
RG-MH-88768 · RERA P51800014845 · Last updated on MahaRERA portal: 7 Oct 2024
Source: official MahaRERA filing
Red flags
- Litigation declared, 5 cases
Clear
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Sunteck Icon, Kolekalyan, CST Road, Kalina, Santacruz East, Mumbai is a Commercial project by Sunteck Realty Limited in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800014845 on 8 Jan 2018. The registration is recorded completed; possession was promised by 30 Jun 2023. 0 of the 62 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete.
At a glance
Project
- NameSunteck Icon, Kolekalyan, CST Road, Kalina, Santacruz East, Mumbai
- TypeCommercial
- Location
- C S T Road
- Kalina
- Andheri
- Mumbai Suburban
- 400098
- Pincode400098
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800014845
- ReraGenie IDRG-MH-88768
Builder
- NameSunteck Realty Limited
- Entity typeCompany
- CINL32100MH1981PLC025346
- GSTIN27AAACI0336E1Z3
- GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
- Company SecretoryRachana Vipul Hingarajia
- Company SecretariesRachana Vipul Hingarajia, Rachana Vipul Hingarajia, Rachana Vipul Hingarajia, Rachana Vipul Hingarajia, Rachana Vipul Hingarajia
- Other registrations24 more →
- Completed10 of 25
- No longer live3 lapsed, de-registered or revoked
- Declared earlier projects6 →
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on8 Jan 2018
- Promised completion30 Jun 2023
- Revised completionNone
- Buildings1 building record
- Documents filed93 files
Current status
Figures as on 7 Oct 2024, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Sunteck Icon | NA | 14 | 0 | 0 | 62 | 62 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 7 Oct 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
9 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.
Sunteck Icon: 82% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 7 Oct 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed172
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Sunteck Icon | NA | Rs 54.82 cr | Rs 54.50 cr |
| - | NA | Rs 7.52 cr | Rs 7.52 cr |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Ar. Priyank Bhatt |
| Engineer | Dwijen Bhatt |
| Engineer | Jagdish Korgaonkar |
| Chartered Accountant | Jhanwar & Maheshwari |
| Chartered Accountant | Walker Chandiok & Co LLP |
| Partner | Role in project |
|---|---|
| Sunteck Realty Limited | - |
Litigation declared5
| Case | Court | Status |
|---|---|---|
| 1074/3082 of 1989/1989 | Small Causes Court | Closed |
| REVISION/100010/2019/2019 | Small Causes Court | Closed |
| 555 OF 2015/2015 | Small Causes Court | Closed |
| 202918 / 2014/2015 | City Civil Court | Ongoing |
| 202918 / 2014/2014 | City Civil Court | Ongoing |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 27 Dec 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 27 Dec 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 16 Aug 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 1 Feb 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 5 Mar 2024
Documents filed93
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 93 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Icon .pdf | 7 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Icon .pdf | 7 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-ENGINEER'S CERTIFICATE Icon_Mar-24.pdf | 25 Apr 2024 |
| Certificates of CA (Form 3)File: Form 3-CA CERTIFICATE Icon_Mar-24.pdf | 25 Apr 2024 |
| Details of encumbrancesFile: 2024 04 04 Encumbrance Certificate Final to upload .pdf | 16 Apr 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 2024 02 27 OCC Letter.pdf | 5 Mar 2024 |
| Architect’s Certificate on Completion of Project (Form 4)File: Annexure E-Form 4- Architect Certificate Sunteck Icon and OC.pdf | 5 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-ARCHITECT'S CERTIFICATE Icon_Jan-24 .pdf | 22 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-ENGINEER'S CERTIFICATE Icon_Jan-24.pdf | 22 Jan 2024 |
| Certificates of CA (Form 3)File: Form 3-CA CERTIFICATE Icon_Jan-24.pdf | 22 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-ARCHITECT'S CERTIFICATE Icon_Sep-23.pdf | 31 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-ENGINEER'S CERTIFICATE Icon_Sep-23.pdf | 31 Oct 2023 |
| Certificates of CA (Form 3)File: Form 3-CA CERTIFICATE Icon_Sep-23.pdf | 31 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5-CA CERTIFICATE ANNUAL REPORT Sunteck Icon_2022-23.pdf | 30 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-ARCHITECT'S CERTIFICATE Icon_June-23.pdf | 27 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-ENGINEER'S CERTIFICATE Icon_June-23.pdf | 27 Jul 2023 |
| Certificates of CA (Form 3)File: Form 3-CA CERTIFICATE Icon_June-23.pdf | 27 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-ARCHITECT'S CERTIFICATE Icon_Mar-23.pdf | 27 Apr 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-ENGINEER'S CERTIFICATE Icon_Mar-23.pdf | 27 Apr 2023 |
| Certificates of CA (Form 3)File: Form 3-CA CERTIFICATE Icon_Mar-23.pdf | 27 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 18-19 Icon.pdf | 27 Mar 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: Full CC 06 01 23.pdf | 1 Feb 2023 |
| Declaration about Commencement CertificateFile: Format D DECLARATION ABOUT COMMENCEMENT CERTIFICATE Icon 06012023.pdf | 1 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-ARCHITECT'S CERTIFICATE Icon_Jan-23.pdf | 1 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-ENGINEER'S CERTIFICATE Icon_Jan-23.pdf | 23 Jan 2023 |
| Certificates of CA (Form 3)File: Form 3-CA CERTIFICATE Icon_Jan-23.pdf | 23 Jan 2023 |
| Declaration about Commencement CertificateFile: Format D-DECLARATION ABOUT COMMENCEMENT CERTIFICATE Icon.pdf | 2 Dec 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: FCC STAIRCASE AND LMR 26 08 22.pdf | 13 Oct 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-ARCHITECT'S CERTIFICATE Icon_Oct-22.pdf | 13 Oct 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-ENGINEER'S CERTIFICATE Icon_Oct-22.pdf | 13 Oct 2022 |
| Certificates of CA (Form 3)File: Form 3-CA CERTIFICATE Icon_Oct-22.pdf | 13 Oct 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5-CA CERTIFICATE ANNUAL REPORT Sunteck Icon_2021-22.pdf | 30 Sep 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Sunteck Icon_July-22.pdf | 19 Jul 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2 ENGINEER'S CERTIFICATE Icon_July-22 .pdf | 19 Jul 2022 |
| Certificates of CA (Form 3)File: Form 3-CA Certificate Sunteck Icon 2022 07 06_July-2022.pdf | 19 Jul 2022 |
| OtherFile: APPLICATION FOR CORRECTION UNDER PROJECT.pdf | 13 Jun 2022 |
| Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMENT CERTIFICATE.pdf | 4 Jun 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2 ENGINEER'S CERTIFICATE Icon 110422.pdf | 4 Jun 2022 |
| CERSAI detailsFile: CERSAI Search Report Asset Based Search.pdf | 4 Jun 2022 |
| Certificates of CA (Form 3)File: Form 3-CA Certificate Sunteck Icon_2022 04 07.pdf | 4 Jun 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Sunteck Icon_Mar-22.pdf | 20 Apr 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: CC 09 11 2021.pdf | 10 Nov 2021 |
| Details of encumbrancesFile: Sunteck Icon Encumbrances_Oct-21.pdf | 4 Oct 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5-Icon-2020-21.pdf | 30 Sep 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Sunteck Icon_Aug-2021.pdf | 23 Aug 2021 |
| Building plan approvalFile: 2021 08 14 IOD LETTER.pdf | 16 Aug 2021 |
| Building plan approvalFile: 2021 08 14 IOD Drawing.pdf | 16 Aug 2021 |
| Building Plan Approval (IOD)File: 2021 08 14 IOD LETTER.pdf | 16 Aug 2021 |
| Building Plan Approval (IOD)File: 2021 08 14 IOD Drawing.pdf | 16 Aug 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Sunteck Icon June 21.pdf | 22 Jun 2021 |
| Building plan approvalFile: Amended IOD letter 30 12 2020.pdf | 1 Feb 2021 |
| Building plan approvalFile: IOD Drawing 30 12 2020 to upload.pdf | 1 Feb 2021 |
| Building Plan Approval (IOD)File: Amended IOD letter 30 12 2020.pdf | 1 Feb 2021 |
| Building Plan Approval (IOD)File: IOD Drawing 30 12 2020 to upload.pdf | 1 Feb 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: Further CC 27 01 2021.pdf | 1 Feb 2021 |
| Building plan approvalFile: Amended IOD plans 280920 to upload.pdf | 23 Dec 2020 |
| Building Plan Approval (IOD)File: Amended IOD plans 280920 to upload.pdf | 23 Dec 2020 |
| Building plan approvalFile: Amended IOD Letter 280920.pdf | 22 Dec 2020 |
| Building Plan Approval (IOD)File: Amended IOD Letter 280920.pdf | 22 Dec 2020 |
| Commencement Certificates / NA Order for plotted developmentFile: Re FCC 3B G2nd 29 10 20.pdf | 22 Dec 2020 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Sunteck Icon Dec20.pdf | 22 Dec 2020 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: CA Certificate Icon 2020-final to upload.pdf | 1 Oct 2020 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Sunteck Icon_Sep-20 Revised Final to upload.pdf | 23 Sep 2020 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Sunteck IconJan2020.pdf | 13 Jan 2020 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate Sunteck Icon_ Sep-19.pdf | 5 Oct 2019 |
| Form 2AFile: 2019 09 FORM 2A Quality Assurance Certificate Icon.pdf | 1 Oct 2019 |
| Certificates of CA (Form 5)File: RERA Certificate Icon 2019 (1).pdf | 30 Sep 2019 |
| Form 2AFile: 2019 06 FORM 2A Quality Assurance Certificate Icon.pdf | 2 Jul 2019 |
| Form 2AFile: 02 FORM 2A Quality Assurance Certificate Icon.pdf | 2 Apr 2019 |
| Form 2AFile: FORM 2A Quality Assurance Certificate Icon.pdf | 16 Jan 2019 |
| Building plan approvalFile: 2018 07 07 IOD Letter.pdf | 1 Oct 2018 |
| Building plan approvalFile: 2018 07 07 IOD Drawing to upload.pdf | 1 Oct 2018 |
| Building Plan Approval (IOD)File: 2018 07 07 IOD Letter.pdf | 1 Oct 2018 |
| Building Plan Approval (IOD)File: 2018 07 07 IOD Drawing to upload.pdf | 1 Oct 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: 2192373_furthercc_signed.pdf | 1 Oct 2018 |
| Certificates of CA (Form 5)File: SUNTECK ICON 20180930061958.pdf | 30 Sep 2018 |
| Certificates of CA (Form 3)File: CA Cartificate Sunteck Icon.pdf | 3 Jan 2018 |
| Building plan approvalFile: 2065449 IOD signed.pdf | 27 Dec 2017 |
| Building plan approvalFile: IOD Drawing.pdf | 27 Dec 2017 |
| Layout approvalFile: 2065449 IOD signed.pdf | 27 Dec 2017 |
Promoter's earlier projects2
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Sunteck Grandeur | Sunteck Grandeur 42 S. V. Road near Andheri Subway Andheri West Mumbai 400 057 | 20 | Completed | Mar 2013 | Late, Jul 2014 |
| Sunteck Centre | Sunteck Centre 37-40 Subhash Road Vile Parle East Mumbai 400057 | 15 | Completed | Sep 2009 | Late, Dec 2009 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 24 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 93 filed documents as one ZIP, foldered, with a manifest
Keep Sunteck Icon, Kolekalyan, CST Road, Kalina, on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Kalina6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 222 registered projects within 2 km.
ALORA
KOLTE-PATIL DEVELOPERS LIMITED
GOLDEN VISTA
BLUE DIAMOND SPACES PRIVATE LIMITED
UNO
Transcon Bellaviu Private Limited
9 BKC
RESHAM SINGH DEVELOPERS LLP
Green Bay
Global Infraprojects SJ LLp
Courtyard
Royal Minerva Realty LLP
See every Mumbai Suburban project, with the district possession charts
Builder: Sunteck Realty Limited
Sunteck Realty Limited has 25 registrations on MahaRERA, including Sunteck City Avenue 1 and Sunteck City Avenue 2. Its filings disclose 6 earlier MahaRERA projects: declares 4 of 6 past projects completed on time. Litigation is declared on 12 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if Sunteck Icon, Kolekalyan, CST Road, Kalina, Santacruz East, Mumbai is delayed beyond 30 Jun 2023?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Sunteck Icon, Kolekalyan, CST Road, Kalina, Santacruz East, Mumbai?
The registered promoter entity is Sunteck Realty Limited, a company as per the filing. Its CIN L32100MH1981PLC025346 and GSTIN 27AAACI0336E1Z3 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Sunteck Icon, Kolekalyan, CST Road, Kalina, Santacruz East, Mumbai?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Sunteck Icon, Kolekalyan, CST Road, Kalina, Santacruz East, Mumbai?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Sunteck Icon, Kolekalyan, CST Road, Kalina, Santacruz East, Mumbai?
The professionals named in the filing: Architect: Ar. Priyank Bhatt; Engineer: Dwijen Bhatt; Engineer: Jagdish Korgaonkar; Chartered Accountant: Jhanwar & Maheshwari; Chartered Accountant: Walker Chandiok & Co LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Sunteck Icon, Kolekalyan, CST Road, Kalina, Santacruz East, Mumbai?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.