Home / Browse projects / Mumbai Suburban, Maharashtra / Sunteck City Avenue 1- Phase 2
Sunteck City Avenue 1- Phase 2
RG-MH-59925 · RERA P51800034112 · Last updated on MahaRERA portal: 17 May 2023
Source: official MahaRERA filing
Red flags
- Registration revoked
- Possession 34 months past the filed date
- 7 complaints at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Sunteck City Avenue 1- Phase 2 is a Residential / Group Housing project by Sunteck Realty Limited in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800034112 on 24 Mar 2022. Possession was promised by 31 Dec 2023 and is now 34 months past that date. 7 complaints are on record with the regulator.
At a glance
Project
- NameSunteck City Avenue 1- Phase 2
- TypeResidential / Group Housing
- Location
- Ram Mandir Road
- Borivali
- Mumbai Suburban
- 400104
- Pincode400104
- RERA no.P51800034112
- ReraGenie IDRG-MH-59925
Builder
- NameSunteck Realty Limited
- Entity typeCompany
- CINL32100MH1981PLC025346
- CIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
- DirectorRachana Hingarajia
- Other registrations24 more →
- Completed10 of 25
- No longer live3 lapsed, de-registered or revoked
- Declared earlier projects6 →
Key dates
Key facts
Registration and timeline
- StatusRegistration revoked
- Registered on24 Mar 2022
- Promised completion31 Dec 2023
- Revised completionNone
- Buildings3 building records
- Documents filed58 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Wing A | NA | 13 | 0 | 0 | 0 | 0 |
| Wing B | NA | 10 | 0 | 0 | 0 | 0 |
| Wing C | NA | 8 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 17 May 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
15 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Slabs of Super Structure, at 75%.
Wing A56%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 75% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 37% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Wing B54%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 67% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 32% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Wing C52%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 67% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 7% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities16
As on 17 May 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
| Compound Wall | Yes | 98% |
Parking filed109
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| Wing A | 48 | 48 |
| Wing B | 37 | 37 |
| Wing C | 24 | 24 |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Mandviwala Qutub & Associates |
| Engineer | Jagdish Korgaonkar |
| Chartered Accountant | N Somani & Co. |
| Partner | Role in project |
|---|---|
| Sunteck Realty Limited | - |
Complaints filed with MahaRERA7
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000429160 | Priyanka Negi | SKYSTAR BUILDCON PVT LTD | 12/02/2024 |
| CC006000000591030 | Shruti Nair | Sunteck realty LTD | 21/07/2024 |
| CC12400528 | Pratik Prakash Vetkar | Sunteck Realty Limited | 22/10/2024 |
| CC12400638 | VIJAY PRABHAKAR SARKALE | Sunteck Realty Limited | 03/11/2024 |
| CC12600502 | Haroon Rashid | Sunteck Realty Limited | 29/01/2026 |
| CC12502514 | ASHRAF AHMED LASKAR | Sunteck Realty Limited | 21/07/2025 |
| CC12504056 | SANATH DINESH SHETTY | Sunteck Realty Limited | 17/11/2025 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 23 Mar 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 22 Mar 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 22 Mar 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 10 Aug 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed58
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Details of encumbrancesFile: 2023 02 15 Encumbrance Certificate Sunteck city Avenue 1 Phase 2.pdf | 17 May 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A-ENGINEER'S QUALITY CERTIFICATE Avn-1-Phase 2 -02_2023 04 01.pdf | 9 May 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-ARCHITECT'S CERTIFICATE Avn-1-Phase 2_Mar-23.pdf | 27 Apr 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-ENGINEER'S CERTIFICATE Avn-1-Phase 2_Mar-23.pdf | 27 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-CA CERTIFICATE Avn-1-Phase 2_Mar-23.pdf | 27 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-ARCHITECT'S CERTIFICATE Avn-1-Phase 2_Jan-23.pdf | 23 Jan 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-ENGINEER'S CERTIFICATE Avn-1-Phase 2_Jan-23.pdf | 23 Jan 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-CA CERTIFICATE Avn-1-Phase 2_Jan-23.pdf | 23 Jan 2023 |
| Declaration about Commencement CertificateFile: Format D-DECLARATION ABOUT COMMENCEMENT CERTIFICATE Avu-1 Phase 2.pdf | 2 Dec 2022 |
| Details of encumbrancesFile: 2022 07 18 Encumbrance Certificate Sunteck City 1 and 2.pdf | 31 Oct 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-ARCHITECT'S CERTIFICATE Avn-1-Phase 2_Oct-22.pdf | 13 Oct 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-ENGINEER'S CERTIFICATE Avn-1-Phase 2_Oct-22.pdf | 13 Oct 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-CA CERTIFICATE Avn-1-Phase 2_Oct-22.pdf | 13 Oct 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5-CA CERTIFICATE ANNUAL REPORT Sunteck City 1-Phase 2_2021-22.pdf | 30 Sep 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: 2022 04 21 Amended CC of Avenue-1.pdf | 10 Aug 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: 1.pdf | 10 Aug 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: 2.pdf | 10 Aug 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: 3.pdf | 10 Aug 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: 4.pdf | 10 Aug 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: 5.pdf | 10 Aug 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: 6.pdf | 10 Aug 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: 7.pdf | 10 Aug 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: 8.pdf | 10 Aug 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1 ARCHITECT'S CERTIFICATE Avenue 1 Phase 2_July-22.pdf | 10 Aug 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Sunteck City Avn 1- Phase 2_July-22.pdf | 10 Aug 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-CA Certificate Avn 1 Phase 2_2022 07 06.pdf | 10 Aug 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Sunteck City Avn 1- Phase II_Mar-22.pdf | 15 Apr 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 01_FORM 2A Quality Assurance Certificate Sunteck City 1 Phase 2_Mar-22.pdf | 15 Apr 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: doc06571720220415122631.pdf | 15 Apr 2022 |
| Copy of the legal title reportFile: Title report-Av1.pdf | 23 Mar 2022 |
| Layout approvalFile: Scan_0680-01.pdf | 22 Mar 2022 |
| Layout approvalFile: Scan_0680-02 .pdf | 22 Mar 2022 |
| Layout approvalFile: Scan_0680-03.pdf | 22 Mar 2022 |
| Layout approvalFile: Scan_0680-04.pdf | 22 Mar 2022 |
| Layout approvalFile: Scan_0680-05 (1).pdf | 22 Mar 2022 |
| Layout approvalFile: Scan_0680-06.pdf | 22 Mar 2022 |
| Layout approvalFile: Scan_0680-07.pdf | 22 Mar 2022 |
| Layout approvalFile: Scan_0680-08.pdf | 22 Mar 2022 |
| Building plan approvalFile: NA SANAD 112 A B 13 08 2019.pdf | 22 Mar 2022 |
| Copy of Layout Approval (in case of layout)File: Scan_0680-01.pdf | 22 Mar 2022 |
| Copy of Layout Approval (in case of layout)File: Scan_0680-02 .pdf | 22 Mar 2022 |
| Copy of Layout Approval (in case of layout)File: Scan_0680-03.pdf | 22 Mar 2022 |
| Copy of Layout Approval (in case of layout)File: Scan_0680-04.pdf | 22 Mar 2022 |
| Copy of Layout Approval (in case of layout)File: Scan_0680-05 (1).pdf | 22 Mar 2022 |
| Copy of Layout Approval (in case of layout)File: Scan_0680-06.pdf | 22 Mar 2022 |
| Copy of Layout Approval (in case of layout)File: Scan_0680-07.pdf | 22 Mar 2022 |
| Copy of Layout Approval (in case of layout)File: Scan_0680-08.pdf | 22 Mar 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: NA SANAD 112 A B 13 08 2019.pdf | 22 Mar 2022 |
| PAN CardFile: Skystar pancard [AANCS9331A].pdf | 21 Mar 2022 |
| Details of encumbrancesFile: Encumbrance.pdf | 21 Mar 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: CC dated 31 12 2021.pdf | 21 Mar 2022 |
| Declaration about Commencement CertificateFile: Declaration about CC.pdf | 21 Mar 2022 |
| Declaration in FORM BFile: Form B Declaration.pdf | 21 Mar 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate .pdf | 21 Mar 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate.pdf | 21 Mar 2022 |
| CERSAI detailsFile: CERSAI Search Report-Asset Based-21 March 2022.pdf | 21 Mar 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3-CA Certificate .pdf | 21 Mar 2022 |
| Proforma of Allotment letterFile: Alloment Letter and AFS Avenue 1 Phase 2.pdf | 21 Mar 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 24 other registrations, which the RERA portal never shows together
- All 58 filed documents as one ZIP, foldered, with a manifest
Keep Sunteck City Avenue 1- Phase 2 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Ram Mandir Road6,700+ in Mumbai Suburban
Opulence
ARIHA BUILDTECH LLP
SHEETAL KIARA
A & A Developers
4TH AVENUE Sunteck City, ODC, Goregaon West
Satguru Corporate Services Pvt. Ltd.
Narang Valora
Narang Realty Private Limited
VIVAN
GOREGAON ELECTRICAL INDUSTRIES LLP
Integrated Ramicon
Integrated Affordable Home Private Limited
See every Mumbai Suburban project, with the district possession charts
Builder: Sunteck Realty Limited
Sunteck Realty Limited has 25 registrations on MahaRERA, including Sunteck City Avenue 1 and Sunteck City Avenue 2. Its filings disclose 6 earlier MahaRERA projects: declares 4 of 6 past projects completed on time. Litigation is declared on 12 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What does it mean that Sunteck City Avenue 1- Phase 2 shows as registration revoked on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if Sunteck City Avenue 1- Phase 2 is delayed beyond 31 Dec 2023?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Sunteck City Avenue 1- Phase 2?
The registered promoter entity is Sunteck Realty Limited, a company as per the filing. Its CIN L32100MH1981PLC025346 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Sunteck City Avenue 1- Phase 2?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Sunteck City Avenue 1- Phase 2?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Sunteck City Avenue 1- Phase 2?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Sunteck City Avenue 1- Phase 2?
The professionals named in the filing: Architect: Mandviwala Qutub & Associates; Engineer: Jagdish Korgaonkar; Chartered Accountant: N Somani & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Sunteck City Avenue 1- Phase 2?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback