Home / Browse projects / Nashik, Maharashtra / SUNRISE APARTMENTS

Registered No litigation declared Residential / Group Housing project

SUNRISE APARTMENTS

By MANIK CONSTRUCTIONS

RG-MH-15515 · RERA P51600034797 · Last updated on MahaRERA portal: 24 Jun 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 24 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Mar 2028Possession promisedmoved 24 months from the original
3 of 11Construction stages donefurthest along: Slabs of Super Structure, 90%
114 of 131Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 58 documents Report an error

SUNRISE APARTMENTS is a Residential / Group Housing project by MANIK CONSTRUCTIONS in Nashik, Maharashtra, registered with MahaRERA as P51600034797 on 28 Apr 2022. Possession is promised by 31 Mar 2028. The completion date has moved by 24 months from the original filing. 17 of the 131 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameSUNRISE APARTMENTS
  • TypeResidential / Group Housing
  • Location
    • SAMANGAON ROAD
    • NASHIK ROAD
    • Nashik
    • 422101
  • Pincode422101
  • RERA no.P51600034797
  • ReraGenie IDRG-MH-15515

Builder

  • NameMANIK CONSTRUCTIONS
  • Entity typePartnership
  • GSTIN27ABQFM2294P1ZB
  • PartnersMAINK NIVRUTTI SONAWANE, SAVITA MANIK SONAWANE

Key dates

this monthRegisteredApr 2022First promiseMar 2026Revised toMar 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on28 Apr 2022
  • Promised completion31 Mar 2028
  • Revised completionRevised to 31 Mar 2028 (originally 9 Mar 2026)
  • Buildings1 building record
  • Documents filed58 files

Current status

13%17 of 131 units booked
32.0%Work done, per cost certificate

Figures as on 24 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SUNRISE APARTMENTSNA8811615131

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 24 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 90%.

SUNRISE APARTMENTS: 45% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Sanitary Fittings within the flats / premises40%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 24 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed41

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots41
Closed/Covered14
Open Space27

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,650 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on9 Mar 2026
LandownerVillageDistrict
MANIK CONSTRUCTIONSNashikNashik

Approvals and building plan

Sanctioning authorityNashik Municipal Corporation
Permissible FSI7515.36
Proposed, not sanctioned7,515 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchHARDI COMPLEX, SAMRAT GROUP BUILDING, NASHIK PUNE ROAD, NASIK
Estimated costRs 12.50 cr
Cost incurredRs 4.00 cr
Work done32.03%
BuildingWingEstimatedIncurred
SUNRISE APARTMENTSNARs 12.50 crRs 4.00 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVIJAY K SANAP
EngineerVIJAY K SANAP
EngineerAnil Kadbhane
Chartered AccountantJIWAN B BEDMUTHA
Chartered AccountantR H Pothiwal & Associates
PartnerRole in project
MANIK CONSTRUCTIONS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA28032620423Mar 2026 → Mar 2028

Reason as filed by the promoterThere were liquidity issues and delays in funding. Labour and material shortages, along with disruptions in supply chains and workforce availability, are impacting construction timelines.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 14 Apr 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 14 Apr 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 14 Apr 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 14 Apr 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2028

Documents filed58

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1_Mar 2026.pdf24 Jun 2026
Withdrawal Update Form 2File: Form 2_Mar 2026.pdf24 Jun 2026
Withdrawal Update Form 3File: CA Certificate_Mar 26.pdf24 Jun 2026
Form 2A (FY 2024-2025)File: From 2A 2024-25.pdf30 Mar 2026
Form 5 (FY 2022-2023)File: RERA Audit Report_22-23.pdf30 Mar 2026
Form 5 (FY 2023-2024)File: RERA Audit Report_23-24.pdf30 Mar 2026
Form 5 (FY 2024-2025)File: RERA Audit Report_24-25.pdf30 Mar 2026
Form 1File: Architect Certificate Mar 23.pdf27 Mar 2026
Form 2File: Engineer Certificate Mar 23.pdf27 Mar 2026
Form 3File: CA Certificate_Manik Constructions_Mar 23.pdf27 Mar 2026
Disclosure of Sold and Booked InventoryFile: Disclosure Mar 23.pdf27 Mar 2026
Form 1File: Architect Certificate March 24.pdf27 Mar 2026
Form 2File: Engineer Certificate Mar 24.pdf27 Mar 2026
Form 3File: CA Certificate_Manik Constructions_Mar 24.pdf27 Mar 2026
Disclosure of Sold and Booked InventoryFile: Disclosure Mar 24.pdf27 Mar 2026
Form 1File: Architect Certificate Mar 25.pdf27 Mar 2026
Form 2File: Engineer Certificate Mar 25.pdf27 Mar 2026
Form 3File: CA Certificate_Manik Constructions Mar 25.pdf27 Mar 2026
Disclosure of Sold and Booked InventoryFile: Disclosure Mar 25.pdf27 Mar 2026
Withdrawal Update Form 1File: Architect Certificate June 25.pdf27 Mar 2026
Withdrawal Update Form 1File: Architect Certificate Sep 25.pdf27 Mar 2026
Withdrawal Update Form 1File: Architect Certificate Dec 25.pdf27 Mar 2026
Withdrawal Update Form 1File: Architect Certificate Dec 25.pdf27 Mar 2026
Withdrawal Update Form 2File: Engineer Certificate June 25.pdf27 Mar 2026
Withdrawal Update Form 2File: Engineer Certificate Sep 25.pdf27 Mar 2026
Withdrawal Update Form 2File: Engineer Certificate Sep 25.pdf27 Mar 2026
Withdrawal Update Form 2File: Enginee Certificate Dec 25.pdf27 Mar 2026
Withdrawal Update Form 3File: CA Certificate_Manik Constructions_Jun 25 - Copy.pdf27 Mar 2026
Withdrawal Update Form 3File: CA Certificate_Manik Constructions_Sep 25.pdf27 Mar 2026
Withdrawal Update Form 3File: CA Certificate_Manik Constructions_Dec 25.pdf27 Mar 2026
Withdrawal Update Form 3File: CA Certificate_Manik Constructions_Dec 25.pdf27 Mar 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Manik Consturction Architects Certificate.pdf22 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Manik Consturction Engineers Certificate.pdf22 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cert Form 3 updated.pdf26 Apr 2022
Declaration in FORM BFile: Adobe Scan Apr 20, 2022 (1)_compressed.pdf21 Apr 2022
Layout approvalFile: GROUND FLOOR PLAN_11zon (1).pdf14 Apr 2022
Building plan approvalFile: GROUND FLOOR PLAN_11zon (1).pdf14 Apr 2022
Building plan approvalFile: FRONT ELEVATION_11zon.pdf14 Apr 2022
Building plan approvalFile: 1ST FLOOR PLAN_11zon.pdf14 Apr 2022
Building plan approvalFile: 2ND FLOOR PLAN_11zon.pdf14 Apr 2022
Building plan approvalFile: 3RD to 7TH FLOOR PLAN_11zon.pdf14 Apr 2022
PAN CardFile: Manik Con PAN.pdf14 Apr 2022
Copy of the legal title reportFile: Legal Title Report_11zon.pdf14 Apr 2022
Details of encumbrancesFile: NIL Enc.PDF14 Apr 2022
Copy of Layout Approval (in case of layout)File: GROUND FLOOR PLAN_11zon (1).pdf14 Apr 2022
Building Plan Approval / NA Order for plotted developmentFile: GROUND FLOOR PLAN_11zon (1).pdf14 Apr 2022
Building Plan Approval / NA Order for plotted developmentFile: FRONT ELEVATION_11zon.pdf14 Apr 2022
Building Plan Approval / NA Order for plotted developmentFile: 1ST FLOOR PLAN_11zon.pdf14 Apr 2022
Building Plan Approval / NA Order for plotted developmentFile: 2ND FLOOR PLAN_11zon.pdf14 Apr 2022
Building Plan Approval / NA Order for plotted developmentFile: 3RD to 7TH FLOOR PLAN_11zon.pdf14 Apr 2022
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf14 Apr 2022
Declaration about Commencement CertificateFile: Format D.pdf14 Apr 2022
Declaration in FORM BFile: Form B Manik.pdf14 Apr 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form- 1 Arch Cert.pdf14 Apr 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Engineer Cert.pdf14 Apr 2022
CERSAI detailsFile: CERSAI_Search_Report_200235175127_For_Debtor_Based_Search_14_04_2022_11_57_16_428.pdf14 Apr 2022
Proforma of Allotment letterFile: Sample Flat_Agreement.pdf14 Apr 2022
Proforma of Allotment letterFile: Allotment Letter.pdf14 Apr 2022

How this compares with Nashik

13%of this project is bookeddistrict median 17%
10%of Nashik projects moved their completion datethis one moved by 24 months
19%of Nashik registrations have lapsed or been cancelledthis one is on the register

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SUNRISE APARTMENTS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NASHIK ROAD4,100+ in Nashik

Builder: MANIK CONSTRUCTIONS

MANIK CONSTRUCTIONS has 1 registration on MahaRERA, including SUNRISE APARTMENTS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What are my rights if SUNRISE APARTMENTS is delayed beyond 31 Mar 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SUNRISE APARTMENTS?

The registered promoter entity is MANIK CONSTRUCTIONS, a partnership as per the filing. Its GSTIN 27ABQFM2294P1ZB can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SUNRISE APARTMENTS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SUNRISE APARTMENTS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SUNRISE APARTMENTS?

The professionals named in the filing: Architect: VIJAY K SANAP; Engineer: VIJAY K SANAP; Engineer: Anil Kadbhane; Chartered Accountant: JIWAN B BEDMUTHA; Chartered Accountant: R H Pothiwal & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SUNRISE APARTMENTS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SUNRISE APARTMENTS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SUNRISE APARTMENTS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.