Home / Browse projects / Palghar, Maharashtra / SUGANDHI VIHAR PHASE II

Registered No litigation declared Mixed project

SUGANDHI VIHAR PHASE II

By SAI VIHAR BUILDERS AND DEVELOPERS

RG-MH-95814 · RERA P99000004800 · Last updated on MahaRERA portal: 2 Apr 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 35 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Nov 2026Possession promisedmoved 35 months from the original
27 of 66Construction stages doneacross 7 buildings; furthest along: Installation of Lifts, 95%
0Complaints at MahaRERAon this registration
Jump to the 106 documents Report an error

SUGANDHI VIHAR PHASE II is a Mixed project by SAI VIHAR BUILDERS AND DEVELOPERS in Palghar, Maharashtra, registered with MahaRERA as P99000004800 on 9 Aug 2017. Possession is promised by 30 Nov 2026. The completion date has moved by 35 months from the original filing.

At a glance

Project

  • NameSUGANDHI VIHAR PHASE II
  • TypeMixed
  • Location
    • MAN
    • BOISAR
    • Palghar
    • 401501
  • Pincode401501
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000004800
  • ReraGenie IDRG-MH-95814

Builder

  • NameSAI VIHAR BUILDERS AND DEVELOPERS
  • Entity typePartnership
  • PartnersRAJESH MORESHWAR NAIK, UMASHANKAR RAMJI GUPTA, BADAL KAILASH NAREDI, SUDHA DEEPAK MISHRA, RAJKUMAR DALSINGAR TIWARI, JALESHWAR SINGH HUF

Key dates

this monthRegisteredAug 2017First promiseDec 2023Revised toNov 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on9 Aug 2017
  • Promised completion30 Nov 2026
  • Revised completionRevised to 30 Nov 2026 (originally 30 Dec 2023)
  • Buildings6 building records
  • Documents filed106 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING NO 1NA50000
NANA00000
NANA00000
BUILDING NO 4 A-WING AND B-WINGNA50000
BUILDING NO 5 A-WING AND B-WINGNA50000
BUILDING NO 6 A-WING AND B-WINGNA50000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building7

As on 2 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

27 of 66 construction stages are filed complete across 7 buildings. The stage furthest along is Installation of Lifts, at 95%.

BUILDING NO 190%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
NA0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
NA0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING NO 4 A-WING AND B-WING87%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
BUILDING NO 5 A-WING AND B-WING80%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises25%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
BUILDING NO 6 A-WING AND B-WING45%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
NA Plot Without StructureNot stated
ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities16

As on 2 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes50%
Water SupplyYes40%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes70%
Storm Water DrainsYes70%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes50%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%
Others Compound Wall Site Office GodownYes30%

Parking filed60

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots60
Open Space60
BuildingOpen SpaceTotal
BUILDING NO 11010
Not named1010
Not named1010
BUILDING NO 4 A-WING AND B-WING1010
BUILDING NO 5 A-WING AND B-WING1010
BUILDING NO 6 A-WING AND B-WING1010

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area14,850 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
RAJESH MORARJI CHHEDAMira-Bhayandar (M Corp.)Thane

Approvals and building plan

Sanctioning authorityZilla Parishad Thane
Permissible FSI17573.07
Proposed, not sanctioned13,352 sq m
Buildings approved6
Buildings sanctioned6

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchAGASHI ROAD VIRAR WEST

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectYASH MILIND NANSI
EngineerVyas Mishra
Chartered AccountantSankhala & Co
Chartered AccountantDesmond Fargoes
PartnerRole in project
SAI VIHAR BUILDERS AND DEVELOPERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT99000025350Dec 2023 → Nov 2026

Reason as filed by the promoterThe construction activities for the project were temporarily halted due to ongoing litigation with various Government Departments, which led to unavoidable interruptions in the project's progress. These legal proceedings necessitated compliance with procedural and regulatory requirements, thereby delaying the continuation of construction. Now that the issues have been addressed, the Developer has resumed construction activities in accordance with the sanctioned plans and approvals. Consequently, the delays in the project's completion timeline are directly attributable to these unforeseen legal

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 24 Jul 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Jul 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 28 Mar 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Nov 2026

Documents filed106

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 106 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1 - Architect Certificate- Sai Vihar March 25.pdf2 Apr 2026
Form 2File: Form 2 - Engineer Certificate- Sai Vihar March 25.pdf2 Apr 2026
Form 3File: Form 3 - Sai Vihar - March 25_compressed.pdf2 Apr 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory - Sai Vihar March 25.pdf2 Apr 2026
Form 1File: Form 1 Dec 24.pdf2 Apr 2026
Form 2File: Form 2 Dec 24.pdf2 Apr 2026
Form 3File: Form 3 Dec 25_compressed.pdf2 Apr 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory - Sai Vihar Dec - 24.pdf2 Apr 2026
Form 1File: Form 1 Sept 24.pdf2 Apr 2026
Form 2File: Form 2 Sept 24.pdf2 Apr 2026
Form 3File: Form 3 Sept 24 _compressed.pdf2 Apr 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory - Sai Vihar Sept - 24.pdf2 Apr 2026
Form 1File: Form 1 June 24.pdf2 Apr 2026
Form 2File: Form 2 June 24.pdf2 Apr 2026
Form 3File: Form 3 June 24_compressed.pdf2 Apr 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory - Sai Vihar June - 24.pdf2 Apr 2026
Form 1File: Form 1 March 24.pdf2 Apr 2026
Form 2File: Form 2 March 24.pdf2 Apr 2026
Form 3File: Form 3 - March 24.pdf2 Apr 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory - Sai Vihar March - 24.pdf2 Apr 2026
Form 5 (FY 2023-2024)File: Form 5 2023 - 2024.pdf2 Apr 2026
Form 5 (FY 2022-2023)File: Form 5 2022-2023.pdf2 Apr 2026
Form 5 (FY 2021-2022)File: Form 5 2021 -2022.pdf2 Apr 2026
Form 5 (FY 2020-2021)File: Form 5 2020-2021.pdf2 Apr 2026
Form 5 (FY 2019-2020)File: Form 5 2019 -2020.pdf2 Apr 2026
Form 5 (FY 2018-2019)File: Form 5 2018-2019.pdf2 Apr 2026
Form 5 (FY 2017-2018)File: Form 5 2017-2018.pdf2 Apr 2026
Declaration in FORM BFile: FORM B.pdf2 Apr 2025
Commencement Certificates / NA Order for plotted developmentFile: 8 Revised Commencement Certificate (CC).pdf28 Mar 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf27 Mar 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf27 Mar 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf27 Mar 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf27 Mar 2025
Certificates of CA (Form 3)File: Form 3 March 24_compressed.pdf27 Mar 2025
Certificates of CA (Form 3)File: Form 3_compressed.pdf27 Mar 2025
Certificates of CA (Form 3)File: Form 3_compressed.pdf27 Mar 2025
Certificates of CA (Form 3)File: Form 3_compressed.pdf27 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Form 5 2017-2018.pdf27 Mar 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf27 Mar 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf27 Mar 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf27 Mar 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf27 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 2018-2019.pdf27 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 2019 -2020.pdf27 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 2020-2021.pdf27 Mar 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory - Sai Vihar March - 24.pdf27 Mar 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory - Sai Vihar June - 24.pdf27 Mar 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory - Sai Vihar Sept - 24.pdf27 Mar 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory - Sai Vihar Dec - 24.pdf27 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 2021 -2022.pdf27 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 2022-2023.pdf27 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 2023 - 2024.pdf27 Mar 2025
CERSAI detailsFile: FINANCE.pdf6 Feb 2025
Disclosure for secured/unsecured finance availed for the projectFile: SEC.pdf6 Feb 2025
Details of encumbrances concerned to FinanceFile: 1 Legal Encumbrances certificate Sai Vihar.pdf10 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 3 Form 2A - Quality Certificate - Sai Vihar- March 2020.pdf10 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 3 Form 2A - Quality Certificate - Sai Vihar- March 2021.pdf10 Dec 2024
Declaration about Commencement CertificateFile: 2 Declaration about CC - Sai Vihar.pdf10 Dec 2024
CERSAI detailsFile: 4 CERSAI details -Sai Vihar- letter Head - Sai Vihar.pdf10 Dec 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: 9 Format A separate account - Sai Vihar.pdf10 Dec 2024
Deviation Report with respect to Allotment letterFile: 10 No Deviation With Respect to Allotment Letter - Sai Vihar.pdf10 Dec 2024
Details of encumbrances concerned to LegalFile: 1 Legal Encumbrances certificate Sai Vihar.pdf10 Dec 2024
Deviation Report with respect to model copy of AgreementFile: 10 No Deviation With Respect to Model Copy Of Agreement - Sai Vihar.pdf10 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 3 Form 2A - Quality Certificate - Sai Vihar- March 2022.pdf10 Dec 2024
Proforma of Agreement for saleFile: AFS.pdf10 Dec 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 6 Annexure A - Disclosure of Interest.pdf10 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 3 Form 2A - Quality Certificate - Sai Vihar- March 2023.pdf10 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 3 Form 2A - Quality Certificate - Sai Vihar- March 2024.pdf10 Dec 2024
Other - TechnicalFile: Sai Vihar RERA Upload.pdf7 Dec 2023
OtherFile: sai vihar complain letter rera.pdf18 Apr 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERT 2ND UPDATION.pdf29 Jul 2019
Layout approvalFile: SHEET NO1LAYOUT.pdf24 Jul 2019
Building plan approval or NA orderFile: SHEET NO2BLDGNO1 pdf.pdf24 Jul 2019
Building plan approval or NA orderFile: SHEET NO3BLDGNO2.pdf24 Jul 2019
Building plan approval or NA orderFile: SHEET NO3BLDGNO2.pdf24 Jul 2019
Building plan approval or NA orderFile: SHEET NO4BLDGNO3 TO 5.pdf24 Jul 2019
Building plan approval or NA orderFile: SHEET NO5BLDGNO6.pdf24 Jul 2019
Copy of Layout Approval (in case of layout)File: SHEET NO1LAYOUT.pdf24 Jul 2019
Building Plan Approval (IOD)File: SHEET NO2BLDGNO1 pdf.pdf24 Jul 2019
Building Plan Approval (IOD)File: SHEET NO3BLDGNO2.pdf24 Jul 2019

How this compares with Palghar

31%of Palghar projects moved their completion datethis one moved by 35 months
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SUGANDHI VIHAR PHASE II on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BOISAR3,200+ in Palghar

2 kmSUGANDHI VIHAR PHASE IICompleted 3Lapsed / revoked 12Other 21Dot size: filed unitsN

Filed coordinates, straight-line distance. 36 registered projects within 2 km.

Builder: SAI VIHAR BUILDERS AND DEVELOPERS

SAI VIHAR BUILDERS AND DEVELOPERS has 1 registration on MahaRERA, including SUGANDHI VIHAR PHASE II. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if SUGANDHI VIHAR PHASE II is delayed beyond 30 Nov 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SUGANDHI VIHAR PHASE II?

The registered promoter entity is SAI VIHAR BUILDERS AND DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SUGANDHI VIHAR PHASE II?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SUGANDHI VIHAR PHASE II?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SUGANDHI VIHAR PHASE II?

The professionals named in the filing: Architect: YASH MILIND NANSI; Engineer: Vyas Mishra; Chartered Accountant: Sankhala & Co; Chartered Accountant: Desmond Fargoes. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SUGANDHI VIHAR PHASE II?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SUGANDHI VIHAR PHASE II. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SUGANDHI VIHAR PHASE II to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.