ReraGenieLog inGet a buyer report

Home / Browse projects / Ahmednagar, Maharashtra / STELLAR HEIGHTS

Registered No litigation declared Residential / Group Housing project

STELLAR HEIGHTS

By VISION GROUP

RG-MH-15495 · RERA P52200034632 · Last updated on MahaRERA portal: 23 Aug 2025

Source: official MahaRERA filing

Red flags

  • Rs 5.00 crore secured on the land, in favour of Vruddheshwar Multistate Credit Cooperative Society
  • The declared charge does not appear in the CERSAI report on the filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Ahmednagar registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
9 of 11Construction stages donefurthest along: Podiums (if any), 0%
28 of 28Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 76 documents Report an error

STELLAR HEIGHTS is a Residential / Group Housing project by VISION GROUP in Ahmednagar, Maharashtra, registered with MahaRERA as P52200034632 on 20 Apr 2022. Possession is promised by 31 Dec 2026. 0 of the 28 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete.

At a glance

Project

  • NameSTELLAR HEIGHTS
  • TypeResidential / Group Housing
  • Location
    • BURUDGAON ROAD
    • AT CHAHURANA
    • Ahmadnagar (M Corp.)
    • Nagar
    • Ahmednagar
    • 414001
  • Pincode414001
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52200034632
  • ReraGenie IDRG-MH-15495

Builder

  • NameVISION GROUP
  • Entity typePartnership
  • PartnersSANTOSH POPATLAL FIRODIYA, DILIP HARAKCHAND GUGLE, SAURABH NAMDEV SHINDE
  • Other registrations4 more →
  • Declared earlier projects1 →

Key dates

this monthRegisteredApr 2022PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on20 Apr 2022
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed76 files

Current status

0%0 of 28 units booked
70.5%Work done, per cost certificate

Figures as on 23 Aug 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
STELLAR HEIGHTSNA151528028

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 23 Aug 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

STELLAR HEIGHTS: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 23 Aug 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area1,533 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofVruddheshwar Multistate Credit Cooperative Society
Secured amountRs 5.00 crore
CERSAI search filedYes
Declared on22 Aug 2025

Approvals and building plan

Sanctioning authorityAhmednagar Muncipal Corporation
Permissible FSI1533.31
Proposed, not sanctioned1,533 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchJAMKHED BEED ROAD, JAMKHED, AHMEDNAGAR
Estimated costRs 12.00 cr
Cost incurredRs 8.46 cr
Work done70.5%
BuildingWingEstimatedIncurred
STELLAR HEIGHTSNARs 9.00 crRs 7.51 cr
-NARs 3.00 crRs 95.41 lakh

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMAYUR KOTHARI
ArchitectMAYUR VIJAY KOTHARI
EngineerKamlesh Pitale
EngineerARNAV CONSTRUCTION
Chartered AccountantPARAG P MUTHA
Chartered AccountantD K KALE AND COMPANY
Chartered AccountantPRAFULL P GAWALI
Chartered AccountantKANKIYA AND MEHTA ASSOCIATES
PartnerRole in project
VISION GROUP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 6 Apr 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 6 Apr 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 6 Apr 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Apr 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed76

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: form 1.pdf23 Aug 2025
Withdrawal Update Form 223 Aug 2025
Withdrawal Update Form 3File: 30 june 24-form 3.pdf23 Aug 2025
Form 5 (FY 2024-2025)File: Form 5 annual report.pdf23 Aug 2025
Form 1File: form 1.pdf22 Aug 2025
Form 2File: form 2.pdf22 Aug 2025
Form 3File: form 3.pdf22 Aug 2025
Disclosure of Sold and Booked InventoryFile: sold unsold.pdf22 Aug 2025
Form 1File: form 1.pdf22 Aug 2025
Form 2File: form 2.pdf22 Aug 2025
Form 3File: form 3.pdf22 Aug 2025
Disclosure of Sold and Booked InventoryFile: sold unsold.pdf22 Aug 2025
Form 1File: form 1.pdf22 Aug 2025
Form 2File: form 2.pdf22 Aug 2025
Form 3File: form 3.pdf22 Aug 2025
Disclosure of Sold and Booked InventoryFile: sold unsold.pdf22 Aug 2025
Form 2A (FY 2022-2023)File: Form 2A for FY 22-23.pdf22 Aug 2025
Form 2A (FY 2023-2024)File: Form 2A for FY 23-24.pdf22 Aug 2025
Form 2A (FY 2024-2025)File: Form 2A for FY 24-25.pdf22 Aug 2025
Form 1File: 30 june 22-form 1.pdf21 Aug 2025
Form 2File: 30 june 22-form 2.pdf21 Aug 2025
Form 3File: 30 june 22-form 3.pdf21 Aug 2025
Disclosure of Sold and Booked InventoryFile: 30 june 22-sold unsold.pdf21 Aug 2025
Form 1File: 30 sept 22-form 1.pdf21 Aug 2025
Form 2File: 30 sept 22-form 2.pdf21 Aug 2025
Form 3File: 30 sept 22-form 3.pdf21 Aug 2025
Disclosure of Sold and Booked InventoryFile: 30 sept 22-sold unsold.pdf21 Aug 2025
Form 1File: 31 dec 22-form 1.pdf21 Aug 2025
Form 2File: 31 dec 22-form 2.pdf21 Aug 2025
Form 3File: 31 dec 22-form 3.pdf21 Aug 2025
Disclosure of Sold and Booked InventoryFile: 31 dec 22 sold unsold.pdf21 Aug 2025
Form 1File: 31 mar 23-form 1.pdf21 Aug 2025
Form 2File: 31 mar 23-form 2.pdf21 Aug 2025
Form 3File: 31 mar 23-form 3.pdf21 Aug 2025
Disclosure of Sold and Booked InventoryFile: 31 mar 23-sold unsold.pdf21 Aug 2025
Form 1File: 30 june 23-form 1.pdf21 Aug 2025
Form 2File: 30 june 23-form 2.pdf21 Aug 2025
Form 3File: 30 june 23-form 3.pdf21 Aug 2025
Disclosure of Sold and Booked InventoryFile: 30 june 23-sold unsold.pdf21 Aug 2025
Form 1File: 30 sept 23-form 1.pdf21 Aug 2025
Form 2File: 30 sept 23-form 2.pdf21 Aug 2025
Form 3File: 30 sept 23-form 3.pdf21 Aug 2025
Disclosure of Sold and Booked InventoryFile: 30 sept 23-sold unsold.pdf21 Aug 2025
Form 1File: 31 dec 23-form 1.pdf21 Aug 2025
Form 2File: 31 dec 23-form 2.pdf21 Aug 2025
Form 3File: 31 dec 23-form 3.pdf21 Aug 2025
Disclosure of Sold and Booked InventoryFile: 31 dec 23-sold unsold.pdf21 Aug 2025
Form 1File: 31 mar 24-form 1.pdf21 Aug 2025
Form 2File: 31 mar 24-form 2.pdf21 Aug 2025
Form 3File: 31 mar 24-form 3.pdf21 Aug 2025
Disclosure of Sold and Booked InventoryFile: 31 mar 24-sold unsold.pdf21 Aug 2025
Form 1File: 30 june 24-form 1.pdf21 Aug 2025
Form 2File: 30 june 24-form 2.pdf21 Aug 2025
Form 3File: 30 june 24-form 3.pdf21 Aug 2025
Disclosure of Sold and Booked InventoryFile: 30 june 24-sold unsold.pdf21 Aug 2025
Form 5 (FY 2022-2023)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23) (1).pdf21 Aug 2025
Form 5 (FY 2023-2024)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24) (1).pdf21 Aug 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Vision Rera.pdf14 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Vision Group.pdf2 Mar 2024
Details of encumbrancesFile: encumbrance .pdf8 Apr 2022
Commencement Certificates / NA Order for plotted developmentFile: Building Approval n.pdf8 Apr 2022
Commencement Certificates / NA Order for plotted developmentFile: Building Approval n.pdf8 Apr 2022
Declaration about Commencement CertificateFile: Declaration about commencement certificate .pdf8 Apr 2022
Declaration in FORM BFile: Form B of vision group .pdf8 Apr 2022
CERSAI detailsFile: CERSAI_Search_Report_200234881112_For_Asset_Based_Search_08_04_2022_21_34_41_173.pdf8 Apr 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 vision group (1).pdf8 Apr 2022
Proforma of Allotment letterFile: agreement to sale stellar heights.pdf8 Apr 2022
Proforma of Allotment letterFile: allotment letter - vision group.pdf8 Apr 2022
Building plan approvalFile: Builing Plan 1.pdf6 Apr 2022
Building plan approvalFile: Builing Plan 2.pdf6 Apr 2022
Layout approvalFile: Layout.pdf6 Apr 2022
PAN CardFile: Vision Group pan card.pdf6 Apr 2022
Copy of the legal title reportFile: search report.pdf6 Apr 2022
Copy of Layout Approval (in case of layout)File: Layout.pdf6 Apr 2022
Building Plan Approval / NA Order for plotted developmentFile: Builing Plan 1.pdf6 Apr 2022
Building Plan Approval / NA Order for plotted developmentFile: Builing Plan 2.pdf6 Apr 2022

How this compares with Ahmednagar

0%of this project is bookeddistrict median 10%
7%of Ahmednagar projects moved their completion datethis one has not
28%of Ahmednagar registrations have lapsed or been cancelledthis one is on the register

Computed across the 490+ Ahmednagar projects on ReraGenie, from their own filings.

Keep STELLAR HEIGHTS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near AT CHAHURANA490+ in Ahmednagar

2 kmSTELLAR HEIGHTSCompleted 26Lapsed / revoked 11Other 12Dot size: filed unitsN

Filed coordinates, straight-line distance. 49 registered projects within 2 km.

Builder: VISION GROUP

VISION GROUP has 5 registrations on MahaRERA, including STELLAR HEIGHTS and VISION CITY. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Ahmednagar district page.

Frequently asked questions

What are my rights if STELLAR HEIGHTS is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of STELLAR HEIGHTS?

The registered promoter entity is VISION GROUP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in STELLAR HEIGHTS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for STELLAR HEIGHTS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at STELLAR HEIGHTS?

The professionals named in the filing: Architect: MAYUR KOTHARI; Architect: MAYUR VIJAY KOTHARI; Engineer: Kamlesh Pitale; Engineer: ARNAV CONSTRUCTION; Chartered Accountant: PARAG P MUTHA; Chartered Accountant: D K KALE AND COMPANY. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in STELLAR HEIGHTS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About STELLAR HEIGHTS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save STELLAR HEIGHTS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.