Completed Litigation declared Others project

Stella Grand Central

By Fortune Infracreators Private Limited

RG-MH-12239 · RERA P51700001150 · Last updated on MahaRERA portal: 29 Apr 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 2 cases
  • 9 complaints at MahaRERA
  • Rs 357.45 crore secured on the land, in favour of Assets Care and Reconstruction Company Arc
  • The charge is held by Assets Care and Reconstruction Company Arc, a distressed-debt buyer or stressed-asset fund rather than an originating lender
  • The declared charge does not appear in the CERSAI report on the filing

Clear

  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedregistration recorded completed
7 of 11Construction stages donefurthest along: Internal walls, 99%
75 of 245Units unsoldnot recorded sold or booked
9Complaints at MahaRERAon this registration
Jump to the 102 documents Report an error

Stella Grand Central is a Others project by Fortune Infracreators Private Limited in Thane, Maharashtra, registered with MahaRERA as P51700001150 on 26 Jul 2017. The registration is recorded completed; possession was promised by 30 Dec 2026. 170 of the 245 units on this registration are recorded sold or booked, and 7 of 11 construction stages are filed complete. 9 complaints are on record with the regulator.

At a glance

Project

  • NameStella Grand Central
  • TypeOthers
  • Location
    • Vartak nagar
    • VARTAKNAGAR
    • Thane
    • 400606
  • Pincode400606
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700001150
  • ReraGenie IDRG-MH-12239

Builder

  • NameFortune Infracreators Private Limited
  • Entity typeCompany
  • CINU45400MH2012OTC232897
  • CIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • DirectorsShailesh Gopal Puranik, Yogesh Govind Puranik
  • Other registrations3 more →
  • Completed3 of 4

Key dates

this monthRegisteredJul 2017PromisedDec 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on26 Jul 2017
  • Promised completion30 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed102 files

Current status

69%170 of 245 units booked

Figures as on 29 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Stella Grand CentralNA332922421245

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 29 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 99%.

Stella Grand Central: 89% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises99%
Sanitary Fittings within the flats / premises83%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 29 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed210

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots210
Closed/Covered210

Land and ownership2

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area1,724 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared present
Charge in favour ofAssets Care and Reconstruction Company Arc
Secured amountRs 357.45 crore
CERSAI search filedYes
Declared on29 Apr 2026
LandownerVillageDistrict
Vasant Vihar Ch-op Hsg Soc LtdVARTAKNAGARThane
Chandrama Co-op Hsg Soc LtdVARTAKNAGARThane

Approvals and building plan

Sanctioning authorityThane Municipal Corporation
Permissible FSI8953.88
Proposed, not sanctioned7,766 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKapurbawadi Junction, Majiwade, GB Road Thane

Certifying professionals and partners9

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDesign Consortium Architects (I) Private Limited
ArchitectVastushilpa Associates
EngineerThornton and Tomasetti
EngineerSagar Abnave
EngineerKedar Yernarkar
Chartered AccountantVMD and Company
Chartered AccountantHDO & Associates
Chartered AccountantVMD & Co
Chartered AccountantChirag Sarvaiya and Co
PartnerRole in project
Fortune Infracreators Private Limited-

Litigation declared2

CaseCourtStatus
8856/2021Ordinary Original Civil Jurisdiction in its Commercial DivisionFor final hearing
8856/2021Ordinary Original Civil Jurisdiction in its Commercial DivisionOngoing

Complaints filed with MahaRERA9

Case no.ComplainantRespondentFiled
CC006000000078172Shailesh PunekarFortune Infracreators Pvt. Ltd.20/02/2019
CC006000000303472Ratnakar D ShettyM/s. Fortune Infra Creators Pvt. Ltd23/08/2023
CC006000000375300SANTOSH VAMAN PARTHEMr.Shailesh Puranik19/04/2023
CC006000000398083Rachna BagwePuraniks Builder04/11/2023
CC12400183SHRADDHA ISHWAR PATILINDIVIDUAL22/09/2024
CC12400444Shreepad Sudhir PawarFortune Infracreators Private Limited17/10/2024
CC12600159GAJENDRA CHAUDHARIFortune Infracreators Private Limited10/01/2026
CC12601116Anay Surendra MatkariFortune Infracreators Private Limited01/03/2026
CC12601203Shambhavi ShivganFortune Infracreators Private Limited05/03/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 22 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 22 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 22 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 16 Nov 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed102

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 102 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupational CertificateFile: OC - 13042026.pdf29 Apr 2026
Form 2A (FY 2024-2025)File: Form 2A Stella GC.pdf24 Apr 2026
Form 1File: FORM 1 Stella Grand Central.pdf20 Apr 2026
Form 2File: Form 2.pdf20 Apr 2026
Form 3File: Form 3.pdf20 Apr 2026
Disclosure of Sold and Booked InventoryFile: Sales Data.pdf20 Apr 2026
Form 1File: Stella Grand Central-FORM 1 - 31122025.pdf23 Jan 2026
Form 2File: Form 2 Engineers Certificate 27 28 31122025.pdf23 Jan 2026
Form 3File: VN 27- 28 CA Certificates 31122025.pdf23 Jan 2026
Disclosure of Sold and Booked InventoryFile: GC Stella_0001.pdf23 Jan 2026
Form 1File: Stella Grand Central-FORM 1 - 30092025.pdf16 Nov 2025
Form 2File: Form 2 Engineers Certificate Stella.pdf16 Nov 2025
Form 3File: VN 27 & 28 CA Certificates 30092025.pdf16 Nov 2025
Disclosure of Sold and Booked InventoryFile: GC Stella_0001.pdf16 Nov 2025
Form 5 (FY 2024-2025)File: Rera Form 5 - Stella - sign.pdf29 Sep 2025
Form 1File: Stella Grand Central-FORM 1 -30062025.pdf12 Aug 2025
Form 2File: Form 2 Engineers Certificate 27 28_300725.pdf12 Aug 2025
Form 3File: VN 27 & 28 CA Certificates.pdf12 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Inventory-Stella Grand Central -27&28.pdf12 Aug 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineers Certificate 27 28.pdf21 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FIPL STELLA GRAND CENTRAL - 31122024.pdf23 Jan 2025
Certificates of CA (Form 3)File: VN 27 28 CA Certificates_31122024-stella_REVISED.pdf23 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineers Certificate 2728_31122024.pdf23 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineers Certificate STELLA.pdf10 Dec 2024
Details of encumbrancesFile: Encumbrance Certificate 27 n 28 2024.pdf3 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: NEW STELLA-FORM 1 - 300924.pdf20 Oct 2024
Certificates of CA (Form 3)File: VN 27 - 28 CA Certificates 30092024.pdf20 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Stella Grand Central_Singed.pdf7 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 30062024 Architects Certificate FORM-1 NEW STELLA.pdf20 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineers Certificate VN - 2728 300624.pdf20 Jul 2024
Certificates of CA (Form 3)File: Stella Grand Central (VN 27 n 28).pdf20 Jul 2024
Disclosure of sold/ booked inventoryFile: Stella Grand Central 27-28.PDF24 Apr 2024
Disclosure of sold/ booked inventoryFile: Stella Grand Central -27-28.PDF24 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: NEW STELLA ARCHITECT CERTIFICATE.pdf23 Apr 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineers Certificate 27 28.pdf23 Apr 2024
Certificates of CA (Form 3)File: Stella.pdf23 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Stella Grand C - 1150.pdf20 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineers Certificate 27 28.pdf20 Jan 2024
Certificates of CA (Form 3)File: Stella.pdf20 Jan 2024
Disclosure of sold/ booked inventoryFile: Elito -19-20.PDF15 Dec 2023
Disclosure of sold/ booked inventoryFile: Stella-27-28.PDF15 Dec 2023
Disclosure of sold/ booked inventoryFile: Stella Grand Central-27-28.PDF15 Dec 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Stella - Ceritificate - 30092023.pdf3 Nov 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineers Certificate 2728 30092023.pdf3 Nov 2023
Certificates of CA (Form 3)File: Stella.pdf3 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Rera Form 5 Stella - sign.pdf30 Sep 2023
Details of encumbrancesFile: Encumbrance Certificate STELLA.pdf7 Sep 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineers Certificate 27 28 Stella 30062023.pdf11 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A- Stella 27 n 28.pdf11 Aug 2023
Certificates of CA (Form 3)File: Stella Grand Central.pdf11 Aug 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Stella 30062023.pdf31 Jul 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineers Certificate 27 28_310323.pdf5 May 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Stella Ceritificate 31032023.pdf24 Apr 2023
Disclosure of sold/ booked inventoryFile: Stella 27-28.PDF24 Apr 2023
Certificates of CA (Form 3)File: Stella grand central.pdf24 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Stella 31122022.PDF31 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineers Certificate 27 28 31122022.pdf31 Jan 2023
Certificates of CA (Form 3)File: Stella GC.PDF31 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: STELLA.pdf12 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: STELLA.pdf12 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: STELLA.pdf12 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineers Certificate 27 28.pdf12 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineers Certificate 27 28.pdf12 Jan 2023
Certificates of CA (Form 3)File: VN 27 28 CA Certificates 31032019.pdf12 Jan 2023
Certificates of CA (Form 3)File: VN 27 28 CA Certificates.pdf12 Jan 2023
Certificates of CA (Form 3)File: VN 27 28.pdf12 Jan 2023
Certificates of CA (Form 3)File: VN 27 28.pdf12 Jan 2023
Certificates of CA (Form 3)File: VN 27 28.pdf12 Jan 2023
Certificates of CA (Form 3)File: VN 27 28.pdf12 Jan 2023
Certificates of CA (Form 3)File: VN 2728.pdf12 Jan 2023
Certificates of CA (Form 3)File: VN 27 28.pdf12 Jan 2023
Certificates of CA (Form 3)File: VN 27 28.pdf12 Jan 2023
Certificates of CA (Form 3)File: VN 27 28.pdf12 Jan 2023
Certificates of CA (Form 3)File: VN 27 28.pdf12 Jan 2023
Certificates of CA (Form 3)File: VN 27 28.pdf12 Jan 2023
Certificates of CA (Form 3)File: VN 27 28 compressed.pdf12 Jan 2023
Certificates of CA (Form 3)File: VN 27 28 compressed.pdf12 Jan 2023
Certificates of CA (Form 3)File: STELLA GRAND CENTRAL - FIPL compressed.pdf12 Jan 2023
Certificates of CA (Form 3)File: Stella compressed.pdf12 Jan 2023
Commencement Certificates / NA Order for plotted developmentFile: Stella Amended Permission.pdf16 Nov 2022

How this compares with Thane

69%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Stella Grand Central on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Vartak Nagar7,600+ in Thane

2 kmStella Grand CentralCompleted 106Lapsed / revoked 55Other 132Dot size: filed unitsN

Filed coordinates, straight-line distance. 293 registered projects within 2 km.

Builder: Fortune Infracreators Private Limited

Fortune Infracreators Private Limited has 4 registrations on MahaRERA, including Tresora Grand Central and Elito Grand Central. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Stella Grand Central is delayed beyond 30 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Stella Grand Central?

The registered promoter entity is Fortune Infracreators Private Limited, a company as per the filing. Its CIN U45400MH2012OTC232897 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Stella Grand Central?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Stella Grand Central?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Stella Grand Central?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Stella Grand Central?

The professionals named in the filing: Architect: Design Consortium Architects (I) Private Limited; Architect: Vastushilpa Associates; Engineer: Thornton and Tomasetti; Engineer: Sagar Abnave; Engineer: Kedar Yernarkar; Chartered Accountant: VMD and Company. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Stella Grand Central?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Stella Grand Central. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Stella Grand Central to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.