ReraGenieLog inGet a buyer report

Home / Browse projects / Dakshina Kannada, Karnataka / SRI BALAJI PRIDE

Registration approved Residential/Group Housing project

SRI BALAJI PRIDE

By SRI BALAJI CONSTRUCTIONS

RG-KA-30267 · RERA PRM/KA/RERA/1257/334/PR/211117/004530 · Last updated on RERA Karnataka portal: 6 Nov 2021

Source: official RERA Karnataka filing

Red flags

  • 2 complaints at RERA Karnataka
  • Completion date moved by 24 months
  • 2 extensions taken

Clear

  • Separate project account declared
Apr 2025Possession promisedmoved 24 months from the original
2Complaints at RERA Karnatakaon this registration
Jump to the 69 documents Report an error

SRI BALAJI PRIDE is a Residential/Group Housing project by SRI BALAJI CONSTRUCTIONS in Dakshina Kannada, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1257/334/PR/211117/004530 on 17 Nov 2021. Possession is promised by 30 Apr 2025. The completion date has moved by 24 months from the original filing. 2 complaints are on record with the regulator.

At a glance

Project

  • NameSRI BALAJI PRIDE
  • TypeResidential/Group Housing
  • Location
    • Mangalore
    • Dakshina Kannada
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1257/334/PR/211117/004530
  • ReraGenie IDRG-KA-30267

Builder

  • NameSRI BALAJI CONSTRUCTIONS
  • Entity typeProprietorship Firm
  • Authorized SignatoryGuduru Srinivas
  • OthersGuduru Srinivas

Key dates

this monthRegisteredNov 2021First promiseApr 2023Revised toApr 2025

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on17 Nov 2021
  • Promised completion30 Apr 2025
  • Revised completionRevised to 30 Apr 2025 (originally 30 Apr 2023)
  • Buildings1 building record
  • Documents filed69 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Balaji Pride---30030

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 6 Nov 2021, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)Not applicable
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)Not applicable
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)Not applicable
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawingsNot applicable

Progress on shared amenities41

As on 6 Nov 2021, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsYes-
Sewage and Drainage SystemYes-
Parks & Tree plantingYes-
Street LightingYes-
Provision for community buildings and for treatment and disposal of sewage and sullage waterYes-
Solid waste management and disposalNoNot applicable
Water conservationNoNot applicable
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Education/Health/Other public amenitiesYes-
Electricity supply transformer and substationYes-
Emergency Evacuation servicesNoNot applicable
Storm water drainsYes-
Use of renewable energyNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseYes-
Community HallYes-
Outdoor Sports facilityYes-
Indoor Sports facilityYes-
Swimming PoolNoNot applicable
GymYes-
ParksYes-
Power BackupYes-
GasNoNot applicable
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsNoNot applicable
Staircases and Lift lobbies, corridor,lobbies, corridorNoNot applicable
Fire escapesNoNot applicable
Common entrance and exit for the building / common portico/foyer/verandahNoNot applicable
BasementNoNot applicable
TerraceNoNot applicable
Outer WallYes-
Open parking areas and common storage spacesYes-
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable

Land and ownership18

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area7,810 sq m
Named landowners18
LandownerVillageDistrict
Gulabi--
Vasantha--
Padmanabha--
Anitha--
Prema--
Prabhakar Shetty--
Ashok Bhandary--
Padmanabha Bhandary--
Narayana Rai--
Suvasini Shetty--
Asha Shekar Rai--
Kusuma Bhandary--
Usha P Shetty--
Vasanthi R Shetty--
Sunil Shetty--
Shakila Shetty @Shakeela--
Shobha Shetty--
Kumuda--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 10.50 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSatheesh Babu B
EngineerPraveen Shetty

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EX/PRM/KA/RERA/1257/334/PR/230922/004530Apr 2023 → Apr 2024

Reason as filed by the promoterothers

ExtensionApr 2024 → Apr 2025

No reason recorded in the filing

Complaints filed with RERA Karnataka2

Case no.ComplainantRespondentFiled
00097/2026-SRI BALAJI CONSTRUCTIONS09/02/2026
00614/2026-SRI BALAJI CONSTRUCTIONS29/05/2026

Documents filed69

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1257/334/PR/211117/004530 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Relinguishment DeedFile: Relinguishment deed Clarification.pdf6 Nov 2021
Balance Sheet with UDIN NumberFile: Balance Sheets with UDIN Number.pdf22 Oct 2021
Cheque BookFile: Cheque Book.pdf22 Oct 2021
LicenseFile: SBC Trade Licence.pdf22 Oct 2021
Form-B AffidavitFile: Form-B Affidavit.pdf22 Oct 2021
Approved plansFile: Approved Plans.pdf22 Oct 2021
Land Sketch about divisionFile: Land Sketch about division in 34 3.pdf22 Oct 2021
MCC Approval letterFile: MCC Aproval letter .pdf22 Oct 2021
SpecificationFile: Specification.pdf22 Oct 2021
STP Design and PlanFile: STP design and plan.pdf22 Oct 2021
Project Details-
Architect Certificate for Work Completion Schedule till DateFile: Architect Certificate for Work Completion.pdf-
Engineer Certificate for Work Completion Schedule till DateFile: Engineer Certificate for Work Completion.pdf-
CA Certificate for Funds UtilizationFile: CA Certificate for Funds Utilization.pdf-
Architect Certificate for Pending Work Completion Schedule.File: Architect Certificate for Pending Work.pdf-
Engineer Certificate for Pending Work Completion Schedule.File: Engineer Certificate for Pending Work.pdf-
CA Certificate for Funds required for Project CompletionFile: CA Certificate for Funds required.pdf-
AffidavitFile: AFFIDAVIT FORM EX 7.pdf-
Latest Encumbrance CertificateFile: EC.pdf-
Consent letter from 2/3rd of AllotteesFile: Consent Letters.pdf-
Details Of Sold/ Un-sold UnitsFile: Sold & Unsold Details.xlsx-
Document 1File: FORM B AFFIDAVIT.pdf-
Document 2File: Water Supply Noc.pdf-
Document 3File: Power Supply Noc.pdf-
Document 4File: KSPCB Noc.pdf-
Building License-
Approved plans-
Approved plans-
Grant Certificate with Court Order-
Approved plans-
Approved plans-
Upto date EC-
Sec 3(1) Non Violation Affidavit-
Joint Declaration Affidavit-
Khtha MR and RTC-
Joint Development Agreement-
General power of attorney-
Conversion-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
NOC Mescom-
NOC-Water-
NOC-PCB-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Approved plans-
Approved plans-
Unnamed document-
Balance Sheet 2018 - 2019File: IT return 2018-19.pdf-
Balance Sheet 2017 - 2018File: IT return 2017-18.pdf-
Cash Flow Statement 2018 - 2019File: Statement of Income 2018-19.pdf-
Form B Affidavitc-
Prospectus/BrochureFile: SRI BALAJI PRIDE BROCHURE_compressed.pdf-
Advertisement Copy 1File: IMG-20220210-WA0000.jpg-
Tower Excel SheetFile: PRMKARERA1257334PR211117004530.xlsx-

How this compares with Dakshina Kannada

30%of Dakshina Kannada projects moved their completion datethis one moved by 24 months
0%of Dakshina Kannada registrations are shown as withdrawn or revokedthis one is not

Computed across the 620+ Dakshina Kannada projects on ReraGenie, from their own filings.

Keep SRI BALAJI PRIDE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Dakshina Kannada620+ in Dakshina Kannada

Builder: SRI BALAJI CONSTRUCTIONS

SRI BALAJI CONSTRUCTIONS has 1 registration on RERA Karnataka, including SRI BALAJI PRIDE. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Dakshina Kannada district page.

Frequently asked questions

What are my rights if SRI BALAJI PRIDE is delayed beyond 30 Apr 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of SRI BALAJI PRIDE?

The registered promoter entity is SRI BALAJI CONSTRUCTIONS, a proprietorship firm as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in SRI BALAJI PRIDE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against SRI BALAJI PRIDE?

Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

Who certifies construction progress at SRI BALAJI PRIDE?

The professionals named in the filing: Architect: Satheesh Babu B; Engineer: Praveen Shetty. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SRI BALAJI PRIDE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SRI BALAJI PRIDE. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SRI BALAJI PRIDE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.