Home / Browse projects / Satara, Maharashtra / SQUARE CASTLE

Registered No litigation declared Residential / Group Housing project

SQUARE CASTLE

By CREDENCE PROPERTIES

RG-MH-15221 · RERA P52700025373 · Last updated on MahaRERA portal: 31 Jul 2026

Source: official MahaRERA filing

Red flags

  • 2 complaints at MahaRERA
  • Completion date moved by 60 months
  • 4 extensions taken

Clear

  • No litigation declared
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Satara registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedmoved 60 months from the original
6 of 11Construction stages donefurthest along: Staircases, 70%
12 of 24Units unsoldnot recorded sold or booked
2Complaints at MahaRERAon this registration
Jump to the 65 documents Report an error

SQUARE CASTLE is a Residential / Group Housing project by CREDENCE PROPERTIES in Satara, Maharashtra, registered with MahaRERA as P52700025373 on 13 May 2020. Possession is promised by 31 Dec 2027. The completion date has moved by 60 months from the original filing. 12 of the 24 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete. 2 complaints are on record with the regulator.

At a glance

Project

  • NameSQUARE CASTLE
  • TypeResidential / Group Housing
  • Location
    • MALAKAPUR
    • MALKAPUR
    • Malkapur (NP)
    • Karad
    • Satara
    • 415539
  • Pincode415539
  • RERA no.P52700025373
  • ReraGenie IDRG-MH-15221

Builder

  • NameCREDENCE PROPERTIES
  • Entity typePartnership
  • PartnerMONALI BALASAEHB SHINDE

Key dates

this monthRegisteredMay 2020First promiseDec 2022Revised toDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on13 May 2020
  • Promised completion31 Dec 2027
  • Revised completionRevised to 31 Dec 2027 (originally 21 Dec 2022)
  • Buildings1 building record
  • Documents filed65 files

Current status

50%12 of 24 units booked

Figures as on 31 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SQUARE CASTLENA6424024

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 31 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 70%.

SQUARE CASTLE: 70% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises40%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks70%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%

Progress on shared amenities15

As on 31 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership5

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area600 sq m
Land owned byThe promoter, with other names on the file
Named landowners5
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on31 Jul 2026
LandownerVillageDistrict
DATTATRAY GANAPATRAO INGAWALEMalkapur (NP)Satara
AVADHUT VISHNU SURYAWANSHIMalkapur (NP)Satara
MONALI BALASAEHB SHINDEMalkapur (NP)Satara
DATTATRAY GANPATRAO INGAWALEMalkapur (NP)Satara
MONALI BALASAHEB SHINDEMalkapur (NP)Satara

Approvals and building plan

Sanctioning authoritySQUARE CASTLE
Permissible FSI936.0
Proposed, not sanctioned936 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch223 11 WANKAR BUILDING SHANIWAR PETH KARAD

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAMOL LOKARE
ArchitectDESAI ARCHITECTS AND INTERIOR DESIGNERS
EngineerS T SANNALE
Chartered AccountantNIKHI OSWAL
Chartered AccountantAshish A Gupta & Associates
PartnerRole in project
CREDENCE PROPERTIES-

Extensions applied for4

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52700013595Dec 2022 → Oct 2023

Reason as filed by the promoterDUE TO PANDEMIC SITUATION OF COVID, LABOUR AND MATERIAL SHORTAGE, PROJECT WORKS IS GET DELAYED, ,MOST OF WORK IS PENDING HENCE WE WANT TO GET EXTENTION OF OF OUR PROJECT .

EXT52700011524Dec 2022 → Dec 2022

Reason as filed by the promoterDURING THE PERIOD OF PANDEMIC SITUATION OIF COVID, WE HAVE SUFFRED FROM LABOUR AND MATERIAL SHORATAGE, HENCE OUR PROJECT WORK WAS DELAYED, MOST OF WORK IS PENDING AND AND WE ARE NOT ABLE TO COMPLETE OUR PROJECT IN GIVEN DATED I.E IS 21/03/2022

EXT52700025318Dec 2022 → Mar 2026

Reason as filed by the promoter• The real estate industry went through multiple challenges over the pandemic years with supply chain disruption, labour crisis, and budget crunch slowing down growth. • We have been grappled with shortage of labour and a demand slump challenges triggered by market volatility. Construction rates have shot up and the market has also witnessed the pressure of inflation. • Due to unavailability of skilled labour and labour migration issues, project is affected a lot. Even contractors are asking us to allow them more time due to labour issues. • The geopolitical tension around the globe has led to

EA31072621966Dec 2022 → Dec 2027

Reason as filed by the promoterThe Self declaration of Reason Uploaded in "Others" Tab.

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC12500084NATHURAM BALKRISHNA SATURECREDENCE PROPERTIES09/01/2025
CC12500135DIPALI DIPAK NALWADECREDENCE PROPERTIES14/01/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Nov 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Nov 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 1 Jul 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 1 Jul 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed65

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2024-2025)File: Form 2A FY 2024-25.pdf31 Jul 2026
Form 2A (FY 2025-2026)File: Form 2A FY 2025-26.pdf31 Jul 2026
Form 5 (FY 2024-2025)File: Form 5- Credence Properties- FY 2024-25.pdf31 Jul 2026
Form 1File: Form 1 Square Castle Q1 FY 25-26.pdf30 Jul 2026
Form 2File: Form - 2_Q1_FY 2025-26 Square Castle.pdf30 Jul 2026
Form 3File: FORM 3_ Square Castle Q1 FY 25-26 signed.pdf30 Jul 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold and Unsold units as on 30th June 2025.pdf30 Jul 2026
Form 1File: FORM 1 Square Castle Q2 FY 25-26.pdf30 Jul 2026
Form 2File: FORM 2 Square Castle Q2 FY 25-26.pdf30 Jul 2026
Form 3File: FORM 3 Square Castle Q2 FY 25-26 signed.pdf30 Jul 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold and Unsold Units as on 30th Sept 25.pdf30 Jul 2026
Form 1File: FORM 1 Square Castle Q3 FY 25-26.pdf30 Jul 2026
Form 2File: FORM 2 Square Castle Q3 FY 25-26.pdf30 Jul 2026
Form 3File: FORM 3 Square Castle Q3 FY 25-26 signed.pdf30 Jul 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold and Unsold Units as on 31st Dec 25.pdf30 Jul 2026
Form 1File: FORM 1 Square Castle Q4 FY 25-26.pdf30 Jul 2026
Form 2File: FORM 2 Square Castle Q4 FY 25-26.pdf30 Jul 2026
Form 3File: FORM 3 Square Castle Q4 FY 25-26 Signed.pdf30 Jul 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold and Unsold Units as on 31st March 26.pdf30 Jul 2026
Declaration in FORM BFile: Form B_500 Stamp Paper.pdf24 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 FY 2020-21.pdf24 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 FY 2021-22.pdf24 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 FY 2022-23.pdf24 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 FY 2023-24.pdf24 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 FY 2024-25.pdf24 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 FY 2025-26_Q1.pdf24 Jul 2025
Disclosure of sold/ booked inventoryFile: Annexure B-Draft of Disclosure of Sold or Unsold Inventory-31st Mar 24.pdf24 Jul 2025
CERSAI detailsFile: Cersai_Debtor based.pdf24 Jul 2025
CERSAI detailsFile: Cersai_Asset based.pdf24 Jul 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A-Declaration about seperate bank Ac.pdf24 Jul 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest_Nilesh Shinde.pdf24 Jul 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest_Monali Shinde.pdf24 Jul 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A FY 2022-23.pdf24 Jul 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A FY 2023-24.pdf24 Jul 2025
Building plan approvalFile: SQUARE CASTLE REVISE SANCTION PLAN.pdf1 Jul 2025
Building plan approvalFile: SQUARE CASTLE REVISE PLAN SANCTION LETTER.pdf1 Jul 2025
Building plan approvalFile: Square Castle Revise Building Plan.pdf1 Jul 2025
Commencement Certificates / NA Order for plotted developmentFile: Square Castle Revise Building Plan Letter.pdf1 Jul 2025
Building Plan Approval / NA Order for plotted developmentFile: SQUARE CASTLE REVISE SANCTION PLAN.pdf1 Jul 2025
Building Plan Approval / NA Order for plotted developmentFile: SQUARE CASTLE REVISE PLAN SANCTION LETTER.pdf1 Jul 2025
Building Plan Approval / NA Order for plotted developmentFile: Square Castle Revise Building Plan.pdf1 Jul 2025
Declaration about Commencement CertificateFile: FORM D.pdf22 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: S0T1000184_2304241157000.pdf22 May 2023
Disclosure of sold/ booked inventoryFile: Disclosure of sold booked inventory .pdf13 May 2023
Declaration about Commencement CertificateFile: S0T1000184_2211301158000.pdf12 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf12 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A.pdf3 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A.pdf3 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5-2021.pdf3 May 2023
Commencement Certificates / NA Order for plotted developmentFile: NA ORDER.PDF1 May 2020
OtherFile: DELOPEMENT 1 TO 10 PAGES.pdf1 Dec 2019
OtherFile: DEVELOPEMENT 10 TO 20_compressed.pdf1 Dec 2019
Layout approvalFile: LAYOUT_compressed.pdf30 Nov 2019
Building plan approvalFile: SANCTION PLAN_compressed.pdf30 Nov 2019
Building plan approvalFile: NA ORDER.PDF30 Nov 2019
PAN CardFile: PANCARD FRIM.pdf30 Nov 2019
Copy of the legal title reportFile: 1 SHODHA AHAVAL_compressed.pdf30 Nov 2019
Details of encumbrancesFile: DETAIF OF INCUMEBERNACE.pdf30 Nov 2019
Copy of Layout Approval (in case of layout)File: LAYOUT_compressed.pdf30 Nov 2019
Building Plan Approval / NA Order for plotted developmentFile: SANCTION PLAN_compressed.pdf30 Nov 2019
Building Plan Approval / NA Order for plotted developmentFile: NA ORDER.PDF30 Nov 2019
Declaration in FORM BFile: FROM B FORNT.pdf30 Nov 2019
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate.pdf30 Nov 2019
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERIFICATE_compressed.pdf30 Nov 2019
Proforma of Allotment letterFile: FORMAT OF SALE DEED.pdf30 Nov 2019

How this compares with Satara

50%of this project is bookeddistrict median 15%
16%of Satara projects moved their completion datethis one moved by 60 months
35%of Satara registrations have lapsed or been cancelledthis one is on the register

Computed across the 1,100+ Satara projects on ReraGenie, from their own filings.

Keep SQUARE CASTLE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MALKAPUR1,100+ in Satara

Builder: CREDENCE PROPERTIES

CREDENCE PROPERTIES has 1 registration on MahaRERA, including SQUARE CASTLE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Satara district page.

Frequently asked questions

What are my rights if SQUARE CASTLE is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SQUARE CASTLE?

The registered promoter entity is CREDENCE PROPERTIES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SQUARE CASTLE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against SQUARE CASTLE?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for SQUARE CASTLE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SQUARE CASTLE?

The professionals named in the filing: Architect: AMOL LOKARE; Architect: DESAI ARCHITECTS AND INTERIOR DESIGNERS; Engineer: S T SANNALE; Chartered Accountant: NIKHI OSWAL; Chartered Accountant: Ashish A Gupta & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SQUARE CASTLE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SQUARE CASTLE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SQUARE CASTLE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.