SQUARE CASTLE
RG-MH-15221 · RERA P52700025373 · Last updated on MahaRERA portal: 31 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 2 complaints at MahaRERA
- Completion date moved by 60 months
- 4 extensions taken
Clear
- No litigation declared
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Satara registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SQUARE CASTLE is a Residential / Group Housing project by CREDENCE PROPERTIES in Satara, Maharashtra, registered with MahaRERA as P52700025373 on 13 May 2020. Possession is promised by 31 Dec 2027. The completion date has moved by 60 months from the original filing. 12 of the 24 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete. 2 complaints are on record with the regulator.
At a glance
Project
- NameSQUARE CASTLE
- TypeResidential / Group Housing
- Location
- MALAKAPUR
- MALKAPUR
- Malkapur (NP)
- Karad
- Satara
- 415539
- Pincode415539
- RERA no.P52700025373
- ReraGenie IDRG-MH-15221
Builder
- NameCREDENCE PROPERTIES
- Entity typePartnership
- PartnerMONALI BALASAEHB SHINDE
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on13 May 2020
- Promised completion31 Dec 2027
- Revised completionRevised to 31 Dec 2027 (originally 21 Dec 2022)
- Buildings1 building record
- Documents filed65 files
Current status
Figures as on 31 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SQUARE CASTLE | NA | 6 | 4 | 24 | 0 | 24 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 31 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
6 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 70%.
SQUARE CASTLE: 70% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 40% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 70% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 50% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 10% |
Progress on shared amenities15
As on 31 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 50% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Land and ownership5
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| DATTATRAY GANAPATRAO INGAWALE | Malkapur (NP) | Satara |
| AVADHUT VISHNU SURYAWANSHI | Malkapur (NP) | Satara |
| MONALI BALASAEHB SHINDE | Malkapur (NP) | Satara |
| DATTATRAY GANPATRAO INGAWALE | Malkapur (NP) | Satara |
| MONALI BALASAHEB SHINDE | Malkapur (NP) | Satara |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | AMOL LOKARE |
| Architect | DESAI ARCHITECTS AND INTERIOR DESIGNERS |
| Engineer | S T SANNALE |
| Chartered Accountant | NIKHI OSWAL |
| Chartered Accountant | Ashish A Gupta & Associates |
| Partner | Role in project |
|---|---|
| CREDENCE PROPERTIES | - |
Extensions applied for4
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterDUE TO PANDEMIC SITUATION OF COVID, LABOUR AND MATERIAL SHORTAGE, PROJECT WORKS IS GET DELAYED, ,MOST OF WORK IS PENDING HENCE WE WANT TO GET EXTENTION OF OF OUR PROJECT .
Reason as filed by the promoterDURING THE PERIOD OF PANDEMIC SITUATION OIF COVID, WE HAVE SUFFRED FROM LABOUR AND MATERIAL SHORATAGE, HENCE OUR PROJECT WORK WAS DELAYED, MOST OF WORK IS PENDING AND AND WE ARE NOT ABLE TO COMPLETE OUR PROJECT IN GIVEN DATED I.E IS 21/03/2022
Reason as filed by the promoter• The real estate industry went through multiple challenges over the pandemic years with supply chain disruption, labour crisis, and budget crunch slowing down growth. • We have been grappled with shortage of labour and a demand slump challenges triggered by market volatility. Construction rates have shot up and the market has also witnessed the pressure of inflation. • Due to unavailability of skilled labour and labour migration issues, project is affected a lot. Even contractors are asking us to allow them more time due to labour issues. • The geopolitical tension around the globe has led to
Reason as filed by the promoterThe Self declaration of Reason Uploaded in "Others" Tab.
Complaints filed with MahaRERA2
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12500084 | NATHURAM BALKRISHNA SATURE | CREDENCE PROPERTIES | 09/01/2025 |
| CC12500135 | DIPALI DIPAK NALWADE | CREDENCE PROPERTIES | 14/01/2025 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 30 Nov 2019 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 30 Nov 2019 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 1 Jul 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 1 Jul 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2027
Documents filed65
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2024-2025)File: Form 2A FY 2024-25.pdf | 31 Jul 2026 |
| Form 2A (FY 2025-2026)File: Form 2A FY 2025-26.pdf | 31 Jul 2026 |
| Form 5 (FY 2024-2025)File: Form 5- Credence Properties- FY 2024-25.pdf | 31 Jul 2026 |
| Form 1File: Form 1 Square Castle Q1 FY 25-26.pdf | 30 Jul 2026 |
| Form 2File: Form - 2_Q1_FY 2025-26 Square Castle.pdf | 30 Jul 2026 |
| Form 3File: FORM 3_ Square Castle Q1 FY 25-26 signed.pdf | 30 Jul 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold and Unsold units as on 30th June 2025.pdf | 30 Jul 2026 |
| Form 1File: FORM 1 Square Castle Q2 FY 25-26.pdf | 30 Jul 2026 |
| Form 2File: FORM 2 Square Castle Q2 FY 25-26.pdf | 30 Jul 2026 |
| Form 3File: FORM 3 Square Castle Q2 FY 25-26 signed.pdf | 30 Jul 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold and Unsold Units as on 30th Sept 25.pdf | 30 Jul 2026 |
| Form 1File: FORM 1 Square Castle Q3 FY 25-26.pdf | 30 Jul 2026 |
| Form 2File: FORM 2 Square Castle Q3 FY 25-26.pdf | 30 Jul 2026 |
| Form 3File: FORM 3 Square Castle Q3 FY 25-26 signed.pdf | 30 Jul 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold and Unsold Units as on 31st Dec 25.pdf | 30 Jul 2026 |
| Form 1File: FORM 1 Square Castle Q4 FY 25-26.pdf | 30 Jul 2026 |
| Form 2File: FORM 2 Square Castle Q4 FY 25-26.pdf | 30 Jul 2026 |
| Form 3File: FORM 3 Square Castle Q4 FY 25-26 Signed.pdf | 30 Jul 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold and Unsold Units as on 31st March 26.pdf | 30 Jul 2026 |
| Declaration in FORM BFile: Form B_500 Stamp Paper.pdf | 24 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 FY 2020-21.pdf | 24 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 FY 2021-22.pdf | 24 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 FY 2022-23.pdf | 24 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 FY 2023-24.pdf | 24 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 FY 2024-25.pdf | 24 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 FY 2025-26_Q1.pdf | 24 Jul 2025 |
| Disclosure of sold/ booked inventoryFile: Annexure B-Draft of Disclosure of Sold or Unsold Inventory-31st Mar 24.pdf | 24 Jul 2025 |
| CERSAI detailsFile: Cersai_Debtor based.pdf | 24 Jul 2025 |
| CERSAI detailsFile: Cersai_Asset based.pdf | 24 Jul 2025 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: Format A-Declaration about seperate bank Ac.pdf | 24 Jul 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest_Nilesh Shinde.pdf | 24 Jul 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest_Monali Shinde.pdf | 24 Jul 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A FY 2022-23.pdf | 24 Jul 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A FY 2023-24.pdf | 24 Jul 2025 |
| Building plan approvalFile: SQUARE CASTLE REVISE SANCTION PLAN.pdf | 1 Jul 2025 |
| Building plan approvalFile: SQUARE CASTLE REVISE PLAN SANCTION LETTER.pdf | 1 Jul 2025 |
| Building plan approvalFile: Square Castle Revise Building Plan.pdf | 1 Jul 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: Square Castle Revise Building Plan Letter.pdf | 1 Jul 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: SQUARE CASTLE REVISE SANCTION PLAN.pdf | 1 Jul 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: SQUARE CASTLE REVISE PLAN SANCTION LETTER.pdf | 1 Jul 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Square Castle Revise Building Plan.pdf | 1 Jul 2025 |
| Declaration about Commencement CertificateFile: FORM D.pdf | 22 May 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: S0T1000184_2304241157000.pdf | 22 May 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold booked inventory .pdf | 13 May 2023 |
| Declaration about Commencement CertificateFile: S0T1000184_2211301158000.pdf | 12 May 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf | 12 May 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A.pdf | 3 May 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A.pdf | 3 May 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5-2021.pdf | 3 May 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: NA ORDER.PDF | 1 May 2020 |
| OtherFile: DELOPEMENT 1 TO 10 PAGES.pdf | 1 Dec 2019 |
| OtherFile: DEVELOPEMENT 10 TO 20_compressed.pdf | 1 Dec 2019 |
| Layout approvalFile: LAYOUT_compressed.pdf | 30 Nov 2019 |
| Building plan approvalFile: SANCTION PLAN_compressed.pdf | 30 Nov 2019 |
| Building plan approvalFile: NA ORDER.PDF | 30 Nov 2019 |
| PAN CardFile: PANCARD FRIM.pdf | 30 Nov 2019 |
| Copy of the legal title reportFile: 1 SHODHA AHAVAL_compressed.pdf | 30 Nov 2019 |
| Details of encumbrancesFile: DETAIF OF INCUMEBERNACE.pdf | 30 Nov 2019 |
| Copy of Layout Approval (in case of layout)File: LAYOUT_compressed.pdf | 30 Nov 2019 |
| Building Plan Approval / NA Order for plotted developmentFile: SANCTION PLAN_compressed.pdf | 30 Nov 2019 |
| Building Plan Approval / NA Order for plotted developmentFile: NA ORDER.PDF | 30 Nov 2019 |
| Declaration in FORM BFile: FROM B FORNT.pdf | 30 Nov 2019 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate.pdf | 30 Nov 2019 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERIFICATE_compressed.pdf | 30 Nov 2019 |
| Proforma of Allotment letterFile: FORMAT OF SALE DEED.pdf | 30 Nov 2019 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Satara
Computed across the 1,100+ Satara projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- All 65 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SQUARE CASTLE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near MALKAPUR1,100+ in Satara
KST CENTRAL PARK
KST CONSTRUCTIONS
Smaark one
Devashree Garden LLP
SHIVSAMRUDDHI TOWERS
SHIVSRUSHTI BUILDCON
VRUNDAVAN CITY PHASE 5
KALYANI INFRA
DWARKA CITY
HERAMB INFRA
AATISH CENTRAL HUB
IRA EARTHCON PVT LTD
See every Satara project, with the district possession charts
Builder: CREDENCE PROPERTIES
CREDENCE PROPERTIES has 1 registration on MahaRERA, including SQUARE CASTLE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Satara district page.
Frequently asked questions
What are my rights if SQUARE CASTLE is delayed beyond 31 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SQUARE CASTLE?
The registered promoter entity is CREDENCE PROPERTIES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SQUARE CASTLE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against SQUARE CASTLE?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for SQUARE CASTLE?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SQUARE CASTLE?
The professionals named in the filing: Architect: AMOL LOKARE; Architect: DESAI ARCHITECTS AND INTERIOR DESIGNERS; Engineer: S T SANNALE; Chartered Accountant: NIKHI OSWAL; Chartered Accountant: Ashish A Gupta & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SQUARE CASTLE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback