Completed No litigation declared Plotted project

Springfield

By Luxora Infrastructure Private Limited

RG-MH-02667 · RERA P50500013193 · Last updated on MahaRERA portal: 25 Mar 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 78 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Mar 2026Possession promisedregistration recorded completed
9 of 143Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 276 documents Report an error

Springfield is a Plotted project by Luxora Infrastructure Private Limited in Nagpur, Maharashtra, registered with MahaRERA as P50500013193 on 18 Sep 2017. The registration is recorded completed; possession was promised by 31 Mar 2026. The completion date has moved by 78 months from the original filing. 134 of the 143 units on this registration are recorded sold or booked. 1 complaint is on record with the regulator.

At a glance

Project

  • NameSpringfield
  • TypePlotted
  • Location
    • Kharsoli Road
    • Mauza
    • Pipla
    • Nagpur (Rural)
    • Nagpur
    • 440034
  • Pincode440034
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500013193
  • ReraGenie IDRG-MH-02667

Builder

  • NameLuxora Infrastructure Private Limited
  • Entity typeCompany
  • CINU70100MH2007PTC166943
  • GSTIN27AABCL2854K2ZA
  • DirectorsDeepak Mahadeo Vasandani, Tarun Hundalani
  • Other registrations22 more →
  • Completed8 of 23
  • No longer live4 lapsed, de-registered or revoked

Key dates

this monthRegisteredSep 2017First promiseSep 2019Revised toMar 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on18 Sep 2017
  • Promised completion31 Mar 2026
  • Revised completionRevised to 31 Mar 2026 (originally 30 Sep 2019)
  • BuildingsNot stated in filing
  • Documents filed276 files

Current status

94%134 of 143 units booked

Figures as on 25 Mar 2026, this project's latest MahaRERA filing.

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 25 Mar 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

NA Plot Without Structure:

ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 25 Mar 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes80%
Street LightingYes50%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area47,874 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on17 Jun 2025

Approvals and building plan

Sanctioning authorityJoint Director Town Planning/Collectors Office Nagpur

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGeeta Bldg, Pandita Ramabai Road, Mumbai 400007

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectStudio Eleven
EngineerJeevan Ramkrishna Kute
Chartered AccountantJain Nirmal Kumar & Associates
Chartered AccountantNeha Joshi
PartnerRole in project
Luxora Infrastructure Private Limited-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT50500003968Sep 2019 → Sep 2020

Reason as filed by the promoterDue to the fact that a new 18 m wide DP road was proposed by NMC in the Regional Plan which directly affected the project after the start of its construction, construction of the project was delayed until clarifications were successfully received on the same.

EA18062501666Sep 2019 → Mar 2026

Reason as filed by the promoterTo, The Hon’ble Authority, Maharashtra Real Estate Regulatory Authority (MahaRERA), Mumbai, Maharashtra Subject: Application for Extension of Completion Date - Springfield, MahaRERA Reg. No. P50500013193 Respected Sir/Madam, We, Luxora Infrastructure Private Limited, the promoter of the project “Springfield” bearing MahaRERA Registration No. P50500013193, hereby apply for an extension of the project completion date under the applicable provisions of the RERA Act. • Original Completion Date: 29/03/2021 • Proposed Revised Completion Date: 31/03/2026 Reason for Extension: The delay in completion

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12500141Payal Arvind BagadeLuxora Infrastructure Private Limited15/01/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 5 Sep 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 4 Sep 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 4 Sep 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 5 Jun 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 25 Mar 2026

Documents filed276

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 276 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: FORM 1 SPRINGFIELD DEC 2019.pdf25 Mar 2026
Form 2File: FORM 2 SPRINGFIELD DEC 2019.pdf25 Mar 2026
Form 3File: FORM 3 SPRINGFIELD DEC 2019.pdf25 Mar 2026
Disclosure of Sold and Booked InventoryFile: FORM 3 SPRINGFIELD DEC 2019.pdf25 Mar 2026
Form 1File: FORM 1 Springfield march 2020.pdf25 Mar 2026
Form 2File: FORM 2 Springfield march 2020.pdf25 Mar 2026
Form 3File: FORM 3 Springfield march 2020.pdf25 Mar 2026
Disclosure of Sold and Booked InventoryFile: FORM 3 Springfield march 2020.pdf25 Mar 2026
Form 1File: FORM 1 SPRINGFIELD JUNE 2020.pdf25 Mar 2026
Form 2File: FORM 2 SPRINGFIELD JUNE 2020.pdf25 Mar 2026
Form 3File: FORM 3 SPRINGFIELD JUNE 2020.pdf25 Mar 2026
Disclosure of Sold and Booked InventoryFile: FORM 3 SPRINGFIELD JUNE 2020.pdf25 Mar 2026
Form 1File: FORM 1 SPRINGFIELD SEP 2020.pdf25 Mar 2026
Form 2File: FORM 2 SPRINGFIELD SEP 2020.pdf25 Mar 2026
Form 3File: FORM 3 SPRINGFIELD SEP 2020.pdf25 Mar 2026
Disclosure of Sold and Booked InventoryFile: FORM 3 SPRINGFIELD SEP 2020.pdf25 Mar 2026
Form 1File: FORM 1 SPRINGFIELD DEC 2020.pdf25 Mar 2026
Form 2File: FORM 2 SPRINGFIELD DEC 2020.pdf25 Mar 2026
Form 3File: FORM 3 SPRINGFIELD DEC 2020.pdf25 Mar 2026
Disclosure of Sold and Booked InventoryFile: FORM 3 SPRINGFIELD DEC 2020.pdf25 Mar 2026
Form 1File: FORM 1 Springfield march 2021.pdf25 Mar 2026
Form 2File: FORM 2 Springfield march 2021.pdf25 Mar 2026
Form 3File: FORM 3 Springfield march 2021.pdf25 Mar 2026
Disclosure of Sold and Booked InventoryFile: FORM 3 Springfield march 2021.pdf25 Mar 2026
Form 1File: FORM 1 SPRINGFIELD JUNE 2021.pdf25 Mar 2026
Form 2File: FORM 2 SPRINGFIELD JUNE 2021.pdf25 Mar 2026
Form 3File: FORM 3 SPRINGFIELD JUNE 2021.pdf25 Mar 2026
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD JUNE 2021.pdf25 Mar 2026
Form 1File: FORM 1 SPRINGFIELD SEP 2021.pdf25 Mar 2026
Form 2File: FORM 2 SPRINGFIELD SEP 2021.pdf25 Mar 2026
Form 3File: FORM 3 SPRINGFIELD SEP 2021.pdf25 Mar 2026
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD.pdf25 Mar 2026
Form 1File: FORM 1 SPRINGFIELD DEC 2021.pdf25 Mar 2026
Form 2File: FORM 2 SPRINGFIELD DEC 2021.pdf25 Mar 2026
Form 3File: FORM 3 SPRINGFIELD DEC 2021.pdf25 Mar 2026
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD DEC 2021.pdf25 Mar 2026
Form 1File: FORM 1 SPRINGFIELD MARCH 2022.pdf25 Mar 2026
Form 2File: FORM 2 SPRINGFIELD MARCH 2022.pdf25 Mar 2026
Form 3File: FORM 3 SPRINGFIELD MARCH 2022.pdf25 Mar 2026
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD 2022.pdf25 Mar 2026
Form 1File: FORM 1 SPRINGFIELD JUNE 2022.pdf25 Mar 2026
Form 2File: FORM 2 SPRINGFIELD JUNE 2022.pdf25 Mar 2026
Form 3File: FORM 3 SPRINGFIELD JUNE 2022.pdf25 Mar 2026
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD JUNE 2022.pdf25 Mar 2026
Form 1File: FORM 1 SPRINGFIELD SEP 2022.pdf25 Mar 2026
Form 2File: FORM 2 SPRINGFIELD SEP 2022.pdf25 Mar 2026
Form 3File: FORM 3 SPRINGFIELD SEP 2022.pdf25 Mar 2026
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD SEP 2022.pdf25 Mar 2026
Form 1File: FORM 1 SEPRINGFIELD DEC 2022.pdf25 Mar 2026
Form 2File: FORM 2 SEPRINGFIELD DEC 2022.pdf25 Mar 2026
Form 3File: FORM 3 SEPRINGFIELD DEC 2022.pdf25 Mar 2026
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD DEC 2022.pdf25 Mar 2026
Form 1File: FORM 1 SEPRINGFIELD MAR 2023.pdf25 Mar 2026
Form 2File: FORM 2 SEPRINGFIELD MAR 2023.pdf25 Mar 2026
Form 3File: FORM 3 SEPRINGFIELD MAR 2023.pdf25 Mar 2026
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD MAR 2023.pdf25 Mar 2026
Form 1File: FORM 1 SPRINGFIELD JUNE 2023.pdf25 Mar 2026
Form 2File: FORM 2 SPRINGFIELD JUNE 2023.pdf25 Mar 2026
Form 3File: FORM 3 SPRINGFIELD JUNE 2023.pdf25 Mar 2026
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD JUNE 2023.pdf25 Mar 2026
Form 1File: FORM 1 SPRINGFIELD SEP 2023.pdf25 Mar 2026
Form 2File: FORM 2 SPRINGFIELD SEP 2023.pdf25 Mar 2026
Form 3File: FORM 3 SPRINGFIELD SEP 2023.pdf25 Mar 2026
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD SEP 2023.pdf25 Mar 2026
Form 1File: FORM 1 SPRINGFIELD DEC 2023.pdf25 Mar 2026
Form 2File: FORM 2 SPRINGFIELD DEC 2023.pdf25 Mar 2026
Form 3File: FORM 3 SPRINGFIELD DEC 2023.pdf25 Mar 2026
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD DEC 2023.pdf25 Mar 2026
Form 1File: FORM 1 SPRINGFIELD MARCH 2024.pdf25 Mar 2026
Form 2File: FORM 2 SPRINGFIELD MARCH 2024.pdf25 Mar 2026
Form 3File: FORM 3 SPRINGFIELD MARCH 2024.pdf25 Mar 2026
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD MARCH 2024.pdf25 Mar 2026
Form 1File: FORM 1 SPRINGFIELD JUNE 2024.pdf25 Mar 2026
Form 2File: FORM 2 SPRINGFIELD JUNE 2024.pdf25 Mar 2026
Form 3File: FORM 3 SPRINGFIELD JUNE 2024.pdf25 Mar 2026
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD JUNE 2024.pdf25 Mar 2026
Form 1File: FORM 1 SPRINGFIELD SEP 2024.pdf25 Mar 2026
Form 2File: FORM 2 SPRINGFIELD SEP 2024.pdf25 Mar 2026
Form 3File: FORM 3 SPRINGFIELD SEP 2024.pdf25 Mar 2026
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD SEP 2024.pdf25 Mar 2026

How this compares with Nagpur

94%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one moved by 78 months
22%of Nagpur registrations have lapsed or been cancelledthis one is completed

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Springfield on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mauza2,800+ in Nagpur

2 kmSpringfieldCompleted 19Lapsed / revoked 8Other 24Dot size: filed unitsN

Filed coordinates, straight-line distance. 51 registered projects within 2 km.

Builder: Luxora Infrastructure Private Limited

Luxora Infrastructure Private Limited has 23 registrations on MahaRERA, including Treeline 5 and Vista 3B. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if Springfield is delayed beyond 31 Mar 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Springfield?

The registered promoter entity is Luxora Infrastructure Private Limited, a company as per the filing. Its CIN U70100MH2007PTC166943 and GSTIN 27AABCL2854K2ZA can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Springfield?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Springfield?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Springfield?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Springfield?

The professionals named in the filing: Architect: Studio Eleven; Engineer: Jeevan Ramkrishna Kute; Chartered Accountant: Jain Nirmal Kumar & Associates; Chartered Accountant: Neha Joshi. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Springfield?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Springfield. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Springfield to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.