Home / Browse projects / Nagpur, Maharashtra / Springfield 3

Registration lapsed No litigation declared Plotted project

Springfield 3

By Luxora Infrastructure Private Limited

RG-MH-53779 · RERA P50500018570 · Last updated on MahaRERA portal: 23 Jul 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 52 months past the filed date
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Jun 2022Possession promised52 months past this date
1 of 58Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 119 documents Report an error

Springfield 3 is a Plotted project by Luxora Infrastructure Private Limited in Nagpur, Maharashtra, registered with MahaRERA as P50500018570 on 13 Nov 2018. Possession was promised by 30 Jun 2022 and is now 52 months past that date. The completion date has moved by 12 months from the original filing. 57 of the 58 units on this registration are recorded sold or booked.

At a glance

Project

  • NameSpringfield 3
  • TypePlotted
  • Location
    • Basa Pipla Road
    • Mauza
    • Pipla
    • Nagpur (Rural)
    • Nagpur
    • 440034
  • Pincode440034
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500018570
  • ReraGenie IDRG-MH-53779

Builder

  • NameLuxora Infrastructure Private Limited
  • Entity typeCompany
  • CINU70100MH2007PTC166943
  • GSTIN27AABCL2854K2ZA
  • Other registrations22 more →
  • Completed8 of 23
  • No longer live4 lapsed, de-registered or revoked

Key dates

52 months past promisethis monthRegisteredNov 2018First promiseJun 2021Revised toJun 2022

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on13 Nov 2018
  • Promised completion30 Jun 2022
  • Revised completionRevised to 30 Jun 2022 (originally 30 Jun 2021)
  • BuildingsNot stated in filing
  • Documents filed119 files

Current status

98%57 of 58 units booked

Figures as on 23 Jul 2025, this project's latest MahaRERA filing.

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 23 Jul 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

NA Plot Without Structure:

ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 23 Jul 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area12,898 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityJoint Director Town Planning/Collectors Office Nagpur

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGeeta Bldg, Pandita Ramabai Rd, Mumbai 400007

Certifying professionals and partners

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

PartnerRole in project
Luxora Infrastructure Private Limited-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT50500010380Jun 2021 → Jun 2022

Reason as filed by the promoterDue to the fact that a new 18m wide DP road was proposed by NMC in the Regional Plan, which directly affected the project after the start of its construction, construction of the project was delayed until clarifications were successfully received on the same.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Oct 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 23 Oct 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 23 Oct 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 Oct 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 25 Nov 2024

Documents filed119

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 119 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of CA (Form 3)File: CA_Cert_Springfield 3_Jun_25.pdf23 Jul 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch_Cert_Springfield 3_Jun_25_Signed.pdf18 Jul 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg_Cert_Springfield 3_Jun_25_Signed.pdf18 Jul 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: QA_Cert_Springfield 3_Mar_25.pdf10 Jul 2025
Certificates of CA (Form 3)File: CA_Cert_Springfield 3_Mar_25.pdf6 May 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch_Cert_Springfield 3_Mar_2025.pdf15 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg_Cert_Springfield 3_Mar_25.pdf15 Apr 2025
Certificates of CA (Form 3)File: CA_Cert_Springfield 3_Dec_24.pdf3 Mar 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch_Cert_Springfield 3_DEc_24.pdf7 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg_Cert_Springfield 3_Dec_24.pdf7 Feb 2025
Certificates of CA (Form 3)File: CA_Cert_Springfield 3_Sep_24.pdf4 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Springfield 3_Form 5 (FY 23-24).pdf2 Dec 2024
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Springfield 3_signed.pdf25 Nov 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Springfield 3_Form 4_Application for Completion_Merged.pdf25 Nov 2024
Certificates of CA (Form 3)File: CA_Cert_Springfield 3_Jun_24.pdf16 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch_Cert_Springfield 3_Sep_24.pdf31 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg_Cert_Springfield 3_Sep_24.pdf31 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch_Cert_Springfield 3_Jun_24.pdf5 Aug 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg_Cert_Springfield 3_Jun_24.pdf5 Aug 2024
Certificates of CA (Form 3)File: CA_Cert_Springfield 3_Mar_24.pdf4 Jun 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg_Cert_Springfield 3_Mar_24.pdf27 May 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch_Cert_Springfield 3_Mar_24.pdf15 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: QA_Cert_Springfield 3_Mar_24.pdf15 May 2024
Certificates of CA (Form 3)File: CA_Cert_Springfield 3_Dec_20.pdf20 Mar 2024
Certificates of CA (Form 3)File: CA_Cert_SPRINGFIELD 3_Sep_23.pdf6 Mar 2024
Certificates of CA (Form 3)File: CA_Cert_Springfield 3 Dec 2023.pdf6 Mar 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Springfield 03_Sep_23.pdf28 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Springfield 03_Dec_23.pdf28 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg_Cert_Springfield 3_Jun_23.pdf28 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENG Springfield 03_Sep_23.pdf28 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENG Springfield 03_Dec_23.pdf28 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Springfield 3_Form 5 (FY 22-23).pdf5 Dec 2023
Certificates of CA (Form 3)File: CA_Cert_Springfield 3_Jun_23.pdf25 Nov 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch_Cert_SPRINGFIELD 03_Jun_23.pdf6 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Springfield-3_ FY 20-21.pdf3 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Springfeld_3_FY 21-22.pdf3 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg_Cert_Springfield 3_Sep_22.pdf29 Aug 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg_Cert_Springfield 3_Dec_22.pdf29 Aug 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENG Springfield 3_Mar_23.pdf29 Aug 2023
Certificates of CA (Form 3)File: CA_Cert_Springfield 3_Mar_23.pdf8 Aug 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARC Springfield 3_Mar_23.pdf21 Jun 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: QA_Cert_Springfield-03_Mar_22.pdf20 Jun 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: QA_Cert_Springfield 3_Mar_23.pdf20 Jun 2023
Certificates of CA (Form 3)File: CA_Cert_Springfield 3_Dec_22.pdf19 May 2023
Certificates of CA (Form 3)File: CA_Cert_Springfield 3_jun_22.pdf18 May 2023
Certificates of CA (Form 3)File: CA_Cert_SPRINGFIELD 3_Sep_22.pdf18 May 2023
Certificates of CA (Form 3)File: CA_Cert_Springfield 3_Dec_2019.pdf17 May 2023
Certificates of CA (Form 3)File: CA_Cert_Springfield 3_Sep_20.pdf17 May 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch cert_Sep 20_Springfield 3_compressed.pdf1 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Cert_Dec 20_Springfield 3_compressed.pdf1 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch_cert_Springfield-3_Jun_2021_compressed.pdf1 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Cert_Sep 20_Springfield 3_compressed.pdf1 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Cert_Dec 20_Springfield 3_compressed.pdf1 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg_Cert_Springfield-3_Jun_2021_compressed.pdf1 Apr 2023
Certificates of CA (Form 3)File: SPRINGFIELD_ 3_compressed_Jun20.pdf1 Apr 2023
Certificates of CA (Form 3)File: CA_Cert_SPRINGFIELD 3_Sep_22.pdf13 Mar 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg_Cert_Springfield 3_Jun_22.pdf7 Mar 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg_Cert_Springfield 3_Sep_22.pdf7 Mar 2023
Certificates of CA (Form 3)File: CA_Cert_Springfield_03(Revised)_compressed.pdf6 Mar 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Springfield-03.pdf1 Mar 2023
Certificates of CA (Form 3)File: CA_Cert_Springfield 3_Mar_22.pdf1 Mar 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Springfield 3.pdf21 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Cert_Springfield 03_Dec 21_compressed.pdf21 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch_Cert_Springfield 03_Mar_22.pdf21 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch_Cert_Springfield 3_Jun_22.pdf21 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch_Cert_Springfield_03_Sep_22.pdf21 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch_Cert_Springfield_03_Sep_22.pdf9 Nov 2022
Certificates of CA (Form 3)File: CA_Cert_Springfield 3_Final_signed.pdf4 Jul 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Cert_Springfield 3_Dec 21_compressed.pdf24 Jun 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch_Cert_Springfield 03_Mar_22.pdf18 May 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Cert Springfield 3 Sep 21_compressed.pdf10 Dec 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Springfield-3_compressed.pdf10 Dec 2021
Certificates of CA (Form 3)File: CA_Cert_Springfield3_Sep_21.pdf10 Dec 2021
Certificates of CA (Form 3)File: Springfield 03 _CA_cert_Jun_21_Revised.PDF14 Sep 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 Springfield-3 ( FY 18-19).pdf10 Sep 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 SPRINGFILED-3 ( FY 19-20).pdf10 Sep 2021
Declaration about Commencement CertificateFile: Declaration Certificate Springfield 3.pdf8 Jul 2021
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Springfield 3.pdf8 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Springfield 3 (Sep-19)_compressed.pdf5 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Springfield 3 (Mar-20)_compressed.pdf5 Jul 2021

How this compares with Nagpur

98%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one moved by 12 months
22%of Nagpur registrations have lapsed or been cancelledthis one is among them

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Springfield 3 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mauza2,800+ in Nagpur

2 kmSpringfield 3Completed 3Lapsed / revoked 2Dot size: filed unitsN

Filed coordinates, straight-line distance. 5 registered projects within 2 km.

Builder: Luxora Infrastructure Private Limited

Luxora Infrastructure Private Limited has 23 registrations on MahaRERA, including Treeline 5 and Vista 3B. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What does it mean that Springfield 3 shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Springfield 3 is delayed beyond 30 Jun 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Springfield 3?

The registered promoter entity is Luxora Infrastructure Private Limited, a company as per the filing. Its CIN U70100MH2007PTC166943 and GSTIN 27AABCL2854K2ZA can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Springfield 3?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Springfield 3?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

What should I check before booking in Springfield 3?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Springfield 3. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Springfield 3 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.