Home / Browse projects / Nagpur, Maharashtra / Springfield 3
Springfield 3
By Luxora Infrastructure Private Limited
RG-MH-53779 · RERA P50500018570 · Last updated on MahaRERA portal: 23 Jul 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 52 months past the filed date
- Completion date moved by 12 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Springfield 3 is a Plotted project by Luxora Infrastructure Private Limited in Nagpur, Maharashtra, registered with MahaRERA as P50500018570 on 13 Nov 2018. Possession was promised by 30 Jun 2022 and is now 52 months past that date. The completion date has moved by 12 months from the original filing. 57 of the 58 units on this registration are recorded sold or booked.
At a glance
Project
- NameSpringfield 3
- TypePlotted
- Location
- Basa Pipla Road
- Mauza
- Pipla
- Nagpur (Rural)
- Nagpur
- 440034
- Pincode440034
- MapView location on Google Maps (as filed on RERA)
- RERA no.P50500018570
- ReraGenie IDRG-MH-53779
Builder
- NameLuxora Infrastructure Private Limited
- Entity typeCompany
- CINU70100MH2007PTC166943
- GSTIN27AABCL2854K2ZA
- Other registrations22 more →
- Completed8 of 23
- No longer live4 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on13 Nov 2018
- Promised completion30 Jun 2022
- Revised completionRevised to 30 Jun 2022 (originally 30 Jun 2021)
- BuildingsNot stated in filing
- Documents filed119 files
Current status
Figures as on 23 Jul 2025, this project's latest MahaRERA filing.
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 23 Jul 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
NA Plot Without Structure:
| Activity | Progress |
|---|---|
| Excavation | Not applicable |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | Not applicable |
| Sanitary Fittings within the flats / premises | Not applicable |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | Not applicable |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | Not applicable |
Progress on shared amenities15
As on 23 Jul 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Partner | Role in project |
|---|---|
| Luxora Infrastructure Private Limited | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterDue to the fact that a new 18m wide DP road was proposed by NMC in the Regional Plan, which directly affected the project after the start of its construction, construction of the project was delayed until clarifications were successfully received on the same.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 26 Oct 2018 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 23 Oct 2018 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 23 Oct 2018 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 23 Oct 2018Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 25 Nov 2024
Documents filed119
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 119 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Certificates of CA (Form 3)File: CA_Cert_Springfield 3_Jun_25.pdf | 23 Jul 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch_Cert_Springfield 3_Jun_25_Signed.pdf | 18 Jul 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg_Cert_Springfield 3_Jun_25_Signed.pdf | 18 Jul 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: QA_Cert_Springfield 3_Mar_25.pdf | 10 Jul 2025 |
| Certificates of CA (Form 3)File: CA_Cert_Springfield 3_Mar_25.pdf | 6 May 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch_Cert_Springfield 3_Mar_2025.pdf | 15 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg_Cert_Springfield 3_Mar_25.pdf | 15 Apr 2025 |
| Certificates of CA (Form 3)File: CA_Cert_Springfield 3_Dec_24.pdf | 3 Mar 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch_Cert_Springfield 3_DEc_24.pdf | 7 Feb 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg_Cert_Springfield 3_Dec_24.pdf | 7 Feb 2025 |
| Certificates of CA (Form 3)File: CA_Cert_Springfield 3_Sep_24.pdf | 4 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Springfield 3_Form 5 (FY 23-24).pdf | 2 Dec 2024 |
| Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Springfield 3_signed.pdf | 25 Nov 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Springfield 3_Form 4_Application for Completion_Merged.pdf | 25 Nov 2024 |
| Certificates of CA (Form 3)File: CA_Cert_Springfield 3_Jun_24.pdf | 16 Nov 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch_Cert_Springfield 3_Sep_24.pdf | 31 Oct 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg_Cert_Springfield 3_Sep_24.pdf | 31 Oct 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch_Cert_Springfield 3_Jun_24.pdf | 5 Aug 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg_Cert_Springfield 3_Jun_24.pdf | 5 Aug 2024 |
| Certificates of CA (Form 3)File: CA_Cert_Springfield 3_Mar_24.pdf | 4 Jun 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg_Cert_Springfield 3_Mar_24.pdf | 27 May 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch_Cert_Springfield 3_Mar_24.pdf | 15 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: QA_Cert_Springfield 3_Mar_24.pdf | 15 May 2024 |
| Certificates of CA (Form 3)File: CA_Cert_Springfield 3_Dec_20.pdf | 20 Mar 2024 |
| Certificates of CA (Form 3)File: CA_Cert_SPRINGFIELD 3_Sep_23.pdf | 6 Mar 2024 |
| Certificates of CA (Form 3)File: CA_Cert_Springfield 3 Dec 2023.pdf | 6 Mar 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Springfield 03_Sep_23.pdf | 28 Feb 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Springfield 03_Dec_23.pdf | 28 Feb 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg_Cert_Springfield 3_Jun_23.pdf | 28 Feb 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENG Springfield 03_Sep_23.pdf | 28 Feb 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENG Springfield 03_Dec_23.pdf | 28 Feb 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Springfield 3_Form 5 (FY 22-23).pdf | 5 Dec 2023 |
| Certificates of CA (Form 3)File: CA_Cert_Springfield 3_Jun_23.pdf | 25 Nov 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch_Cert_SPRINGFIELD 03_Jun_23.pdf | 6 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Springfield-3_ FY 20-21.pdf | 3 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Springfeld_3_FY 21-22.pdf | 3 Oct 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg_Cert_Springfield 3_Sep_22.pdf | 29 Aug 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg_Cert_Springfield 3_Dec_22.pdf | 29 Aug 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENG Springfield 3_Mar_23.pdf | 29 Aug 2023 |
| Certificates of CA (Form 3)File: CA_Cert_Springfield 3_Mar_23.pdf | 8 Aug 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARC Springfield 3_Mar_23.pdf | 21 Jun 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: QA_Cert_Springfield-03_Mar_22.pdf | 20 Jun 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: QA_Cert_Springfield 3_Mar_23.pdf | 20 Jun 2023 |
| Certificates of CA (Form 3)File: CA_Cert_Springfield 3_Dec_22.pdf | 19 May 2023 |
| Certificates of CA (Form 3)File: CA_Cert_Springfield 3_jun_22.pdf | 18 May 2023 |
| Certificates of CA (Form 3)File: CA_Cert_SPRINGFIELD 3_Sep_22.pdf | 18 May 2023 |
| Certificates of CA (Form 3)File: CA_Cert_Springfield 3_Dec_2019.pdf | 17 May 2023 |
| Certificates of CA (Form 3)File: CA_Cert_Springfield 3_Sep_20.pdf | 17 May 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch cert_Sep 20_Springfield 3_compressed.pdf | 1 Apr 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Cert_Dec 20_Springfield 3_compressed.pdf | 1 Apr 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch_cert_Springfield-3_Jun_2021_compressed.pdf | 1 Apr 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Cert_Sep 20_Springfield 3_compressed.pdf | 1 Apr 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Cert_Dec 20_Springfield 3_compressed.pdf | 1 Apr 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg_Cert_Springfield-3_Jun_2021_compressed.pdf | 1 Apr 2023 |
| Certificates of CA (Form 3)File: SPRINGFIELD_ 3_compressed_Jun20.pdf | 1 Apr 2023 |
| Certificates of CA (Form 3)File: CA_Cert_SPRINGFIELD 3_Sep_22.pdf | 13 Mar 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg_Cert_Springfield 3_Jun_22.pdf | 7 Mar 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg_Cert_Springfield 3_Sep_22.pdf | 7 Mar 2023 |
| Certificates of CA (Form 3)File: CA_Cert_Springfield_03(Revised)_compressed.pdf | 6 Mar 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Springfield-03.pdf | 1 Mar 2023 |
| Certificates of CA (Form 3)File: CA_Cert_Springfield 3_Mar_22.pdf | 1 Mar 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Springfield 3.pdf | 21 Feb 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Cert_Springfield 03_Dec 21_compressed.pdf | 21 Jan 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch_Cert_Springfield 03_Mar_22.pdf | 21 Jan 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch_Cert_Springfield 3_Jun_22.pdf | 21 Jan 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch_Cert_Springfield_03_Sep_22.pdf | 21 Jan 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch_Cert_Springfield_03_Sep_22.pdf | 9 Nov 2022 |
| Certificates of CA (Form 3)File: CA_Cert_Springfield 3_Final_signed.pdf | 4 Jul 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Cert_Springfield 3_Dec 21_compressed.pdf | 24 Jun 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch_Cert_Springfield 03_Mar_22.pdf | 18 May 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Cert Springfield 3 Sep 21_compressed.pdf | 10 Dec 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Springfield-3_compressed.pdf | 10 Dec 2021 |
| Certificates of CA (Form 3)File: CA_Cert_Springfield3_Sep_21.pdf | 10 Dec 2021 |
| Certificates of CA (Form 3)File: Springfield 03 _CA_cert_Jun_21_Revised.PDF | 14 Sep 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 Springfield-3 ( FY 18-19).pdf | 10 Sep 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 SPRINGFILED-3 ( FY 19-20).pdf | 10 Sep 2021 |
| Declaration about Commencement CertificateFile: Declaration Certificate Springfield 3.pdf | 8 Jul 2021 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Springfield 3.pdf | 8 Jul 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Springfield 3 (Sep-19)_compressed.pdf | 5 Jul 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Springfield 3 (Mar-20)_compressed.pdf | 5 Jul 2021 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nagpur
Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.
Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 22 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 119 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep Springfield 3 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Mauza2,800+ in Nagpur
Filed coordinates, straight-line distance. 5 registered projects within 2 km.
BHEDE NAGARI -CHARITON
DILIP GANPATRAO BHEDE
Godrej Orchard Estate
Godrej Properties Limited
MELBOURNE CITY
M/S 4 PILLARS REALTY
GARDEN HOMES ATHARVA NAGARI VII
ATHARVA INFRASTRUCTURES
ROYAL EMPIRE
M B INFRA
Ved Vidhi Ventures
Ved Vidhi Ventures
See every Nagpur project, with the district possession charts
Builder: Luxora Infrastructure Private Limited
Luxora Infrastructure Private Limited has 23 registrations on MahaRERA, including Treeline 5 and Vista 3B. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.
Frequently asked questions
What does it mean that Springfield 3 shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if Springfield 3 is delayed beyond 30 Jun 2022?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Springfield 3?
The registered promoter entity is Luxora Infrastructure Private Limited, a company as per the filing. Its CIN U70100MH2007PTC166943 and GSTIN 27AABCL2854K2ZA can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Springfield 3?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Springfield 3?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
What should I check before booking in Springfield 3?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback