Completed No litigation declared Residential / Group Housing project

SPRING VALLEY

By R K ICON ASSOCIATES

RG-MH-15245 · RERA P52100028832 · Last updated on MahaRERA portal: 22 Jan 2025

Source: official MahaRERA filing

Red flags

  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 1 earlier projects delivered on promise

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Sep 2023Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 107 documents Report an error

SPRING VALLEY is a Residential / Group Housing project by R K ICON ASSOCIATES in Pune, Maharashtra, registered with MahaRERA as P52100028832 on 5 Apr 2021. The registration is recorded completed; possession was promised by 30 Sep 2023.

At a glance

Project

  • NameSPRING VALLEY
  • TypeResidential / Group Housing
  • Location
    • HADAPSAR MUNDWA ROAD
    • MAGARPATTA
    • Hadapsar
    • Haveli
    • Pune
    • 412201
  • Pincode412201
  • RERA no.P52100028832
  • ReraGenie IDRG-MH-15245

Builder

  • NameR K ICON ASSOCIATES
  • Entity typeOthers
  • Named personsVANESSA AND ASSOCIATES, ALI ALIAKBAR JAFARINAIMI, MUFADDAL MOHMEDI PATWA, MUSTUFA MOHMEDI PATWA, MURTAZA MOHMEDI PATWA
  • Declared earlier projects1 →

Key dates

this monthRegisteredApr 2021PromisedSep 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on5 Apr 2021
  • Promised completion30 Sep 2023
  • Revised completionNone
  • Buildings1 building record
  • Documents filed107 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ORCHIDNA140000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 22 Jan 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

ORCHID: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 22 Jan 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership3

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,000 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
LandownerVillageDistrict
ALI A JAFARINAIMIPune (CB)Pune
TULSIRAM MANDHAREPune (CB)Pune
SPRING VALLEY CO-OP HSG SOCIETYPune (CB)Pune

Approvals and building plan

Permissible FSI4620.76
Proposed, not sanctioned3,595 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchEAST STREET PUNE

Certifying professionals and partners

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

PartnerRole in project
R K ICON ASSOCIATES-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100017615Sep 2023 → Sep 2024

Reason as filed by the promoterAs per our first sanction plan we had units from 3rd to 9th floor, whose occupancy certificate is already received and uploaded on website. There is addition of 2 floors (10th and 11th floor) in the new revised plan dated 07.03.2022,we have almost completed the project till 11th floor,but we need the occupancy and completion certificate so we need to extend the Project completion date by one year.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 1 Apr 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 Sep 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Sep 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 26 Feb 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 22 Jan 2025

Documents filed107

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 107 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: Form 4.pdf22 Jan 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion Certificates New 220102024.pdf22 Jan 2025
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 sign.pdf30 Dec 2024
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society_Formation.pdf30 Dec 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion Certificates New.pdf30 Dec 2024
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 sign.pdf28 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 30062024.pdf28 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 30062024.pdf28 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: R K ICON FORM 1 CERTIFICATE.pdf19 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 Spring Valley 30062024 sign_compress.pdf19 Dec 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold unsold 30062024.pdf19 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5_ Spring Valley _FY 2023-2024.pdf6 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: R K ICON FORM 1 CERTIFICATE.pdf18 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 As on 31032024.pdf17 May 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold unsold.pdf17 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 Spring Valley 31032024-compress.pdf17 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 r k icon 31122023.pdf19 Jan 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold r k icon 31122023.pdf16 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 Spring Valley 31122023 both sign_compressed.pdf16 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 31122023.pdf12 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 R K ICON 30092203.pdf31 Oct 2023
Disclosure of sold/ booked inventoryFile: disclosure sold unsold 30092023.pdf31 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 Spring Valley 30092023 both sign_compressed (1).pdf31 Oct 2023
Declaration in FORM BFile: Form B _29092024.pdf5 Oct 2023
Layout approvalFile: 1.pdf26 Sep 2023
Building plan approvalFile: 2 PARKING.pdf26 Sep 2023
Building plan approvalFile: 5_8TH AND 10TH FLOOR.pdf26 Sep 2023
Building plan approvalFile: 6-11TH FLOOR.pdf26 Sep 2023
Copy of Layout Approval (in case of layout)File: 1.pdf26 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: 2 PARKING.pdf26 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: 5_8TH AND 10TH FLOOR.pdf26 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: 6-11TH FLOOR.pdf26 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 FY 22 23 FINAL.pdf21 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 signed.pdf8 Aug 2023
Proforma of Agreement for saleFile: MODEL FORM OF AGREEMENT TO SALE.pdf3 Aug 2023
PAN CardFile: r k icon pancard.pdf2 Aug 2023
Disclosure of sold/ booked inventoryFile: disclosure 300623.pdf31 Jul 2023
Proforma of Allotment letterFile: draft allotment letter rkicon_compressed.pdf31 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 SIGNED.pdf20 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: form 2a fy 2122.pdf20 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: form 2a fy 2223.pdf20 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Rk icon 30032023_both sing_compressed (1).pdf20 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 spring valley 30-06-23 both sign_compressed.pdf20 Jul 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: part Completion Certificate rk icon.pdf20 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 31032023.pdf28 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: R K Form 2 done_compressed.pdf28 Jun 2023
Disclosure of sold/ booked inventoryFile: R K Sold flats disclosure .pdf28 Jun 2023
Details of encumbrances concerned to FinanceFile: Encumbrance merged.pdf21 Mar 2023
Details of encumbrances concerned to LegalFile: Encumbrance merged.pdf21 Mar 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in other real estate organisations - ALI ALIAKBAR JAFARINAIMI.pdf21 Mar 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in other real estate organisations - MUFADDAL MOHMEDI PATWA.pdf21 Mar 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in other real estate organisations - MURTAZA MOHMEDI PATWA.pdf21 Mar 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in other real estate organisations - MUSTUFA MOHMEDI PATWA.pdf21 Mar 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in other real estate organisations - VANESSA AND ASSOCIATES.pdf21 Mar 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration About Separate Bank Account For Real Estate Projects.pdf21 Mar 2023
Deviation Report with respect to Allotment letterFile: Deviation Report with respect to Allotment letter.pdf21 Mar 2023
Deviation Report with respect to model copy of AgreementFile: Deviation Report with respect to model copy of Agreement.pdf21 Mar 2023
Disclosure of sold/ booked inventoryFile: DISCLOSURE SPRING VALLEY 31122022.pdf6 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 31122022 rk icon.pdf27 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 31122022.pdf27 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Spring Valley 31122022 signed_compressed.pdf27 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf23 Dec 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 300922 SIGNED1.pdf23 Dec 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: RK ICON FORM 5 21-22.pdf5 Oct 2022
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD DETAILS.pdf8 Sep 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Bhushan Rathod Form-2_compressed.pdf2 Sep 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Priyanka Chordiya And Associates Form-3-1.pdf2 Sep 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1 As on 31032022.pdf2 Jun 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1 As on 31032022.pdf2 Jun 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 as on 3102022-compressed.pdf2 Jun 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 as on 31032022.pdf2 Jun 2022
CERSAI detailsFile: no cersai certificate.pdf23 Feb 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form1 upload.pdf31 Jan 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 new upload.pdf31 Jan 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 new 31122021 rkicon signed.pdf31 Jan 2022
Declaration about Commencement CertificateFile: DECLARATION OF CC.pdf17 Nov 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 300921.pdf17 Nov 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2_compressed.pdf17 Nov 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2.pdf17 Nov 2021
Disclosure of sold/ booked inventoryFile: RKicon Disclosure as on 30092021 FINAL.pdf17 Nov 2021

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
SPRING VALLEY137-1-C HADAPSAR PUNE144CompletedMar 2010Mar 2010

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SPRING VALLEY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MAGARPATTA13,700+ in Pune

Builder: R K ICON ASSOCIATES

R K ICON ASSOCIATES has 1 registration on MahaRERA, including SPRING VALLEY. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if SPRING VALLEY is delayed beyond 30 Sep 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SPRING VALLEY?

The registered promoter entity is R K ICON ASSOCIATES, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SPRING VALLEY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SPRING VALLEY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

What should I check before booking in SPRING VALLEY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SPRING VALLEY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SPRING VALLEY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.