Completed No litigation declared Residential / Group Housing project

SPRING FIELD

By M/S. SHYAM SAGAR DEVELOPERS

RG-MH-12246 · RERA P99000004250 · Last updated on MahaRERA portal: 10 Feb 2024

Source: official MahaRERA filing

Red flags

  • Completion date moved by 42 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Jun 2027Possession promisedregistration recorded completed
36 of 44Construction stages doneacross 4 buildings; furthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 53 documents Report an error

SPRING FIELD is a Residential / Group Housing project by M/S. SHYAM SAGAR DEVELOPERS in Palghar, Maharashtra, registered with MahaRERA as P99000004250 on 9 Aug 2017. The registration is recorded completed; possession was promised by 30 Jun 2027. The completion date has moved by 42 months from the original filing.

At a glance

Project

  • NameSPRING FIELD
  • TypeResidential / Group Housing
  • Location
    • .
    • varangade
    • Palghar
    • 401501
  • Pincode401501
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000004250
  • ReraGenie IDRG-MH-12246

Builder

  • NameM/S. SHYAM SAGAR DEVELOPERS
  • Entity typePartnership
  • PartnersRAHUL SURESH PANCHMATIYA, SAYED KHAISAR JHA KHAZI, ANIL CHANDULAL PATEL, BHARAT DUSHYANT PATEL, DUSHYANT CHANDULAL PATEL

Key dates

this monthRegisteredAug 2017First promiseDec 2023Revised toJun 2027Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on9 Aug 2017
  • Promised completion30 Jun 2027
  • Revised completionRevised to 30 Jun 2027 (originally 30 Dec 2023)
  • Buildings4 building records
  • Documents filed53 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BLDG NO 1NA40000
BLDG NO 2NA40000
BLDG NO 5NA40000
BLDG NO 6NA40000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 10 Feb 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

36 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Podiums (if any), at 0%.

BLDG NO 182%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BLDG NO 282%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BLDG NO 582%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BLDG NO 682%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 10 Feb 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area6,878 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
M/S A.K. DEVELOPERSGreater Mumbai (M Corp.) (Part) (802794)Mumbai Suburban

Approvals and building plan

Permissible FSI6136.0
Proposed, not sanctioned6,136 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHRI RAM TRADE CENTRE, SVP ROAD, CHAMUNDA CIRCLE, BORIVALI WEST, MUMBAI-400092

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSUDHIR R MAGDUM
EngineerR D Magdum
Chartered AccountantNilesh B Patel
PartnerRole in project
M/S. SHYAM SAGAR DEVELOPERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT99000019053Dec 2023 → Jun 2027

Reason as filed by the promoterWe are going to apply for occupancy and complete the project, due to COVID-19 we were not able to complete the project as per the promised timeline.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 2 Apr 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 27 Dec 2023

Documents filed53

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Disclosure of sold/ booked inventoryFile: ACE Scanner_2024_02_10.pdf10 Feb 2024
Declaration in FORM BFile: FORM B.pdf9 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENG.pdf9 Feb 2024
Details of encumbrances concerned to FinanceFile: NO ENC LEGAL.pdf8 Feb 2024
Details of encumbrances concerned to FinanceFile: NO ENCB FINANCE.pdf8 Feb 2024
Details of encumbrances concerned to LegalFile: NO ENC LEGAL.pdf8 Feb 2024
Details of encumbrances concerned to LegalFile: NO ENCB FINANCE.pdf8 Feb 2024
Declaration about Commencement CertificateFile: CC DECL.pdf8 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCH.pdf8 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENG.pdf8 Feb 2024
CERSAI detailsFile: CERSAI LETTER.pdf8 Feb 2024
Certificates of CA (Form 3)File: CA.pdf8 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEXURE A - AMIT.pdf8 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEXURE A - BHARAT.pdf8 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEXURE A - DUSHYANT.pdf8 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEXURE A - RAHUL.pdf8 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEXURE A - SURESH.pdf8 Feb 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: BANK LETTER.pdf8 Feb 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupancy Certificate and Archiect certificate.pdf27 Dec 2023
Architect’s Certificate on Completion of Project (Form 4)File: archiect certificate on completion.pdf26 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5.pdf2 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 22-23.pdf19 Jun 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - 2023.pdf27 May 2023
Certificates of CA (Form 3)File: Form 3 - 2023.pdf27 May 2023
Disclosure of sold/ booked inventoryFile: Disclouser of Inventory.pdf11 May 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form-1 (1)_Compress.pdf9 May 2023
Other - TechnicalFile: Form- 2A.pdf9 May 2023
Certificates of CA (Form 3)File: FORM 3 CA UPLOAD.pdf27 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form no 5 FY 2018 19.pdf20 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form no 5 FY 2019 20.pdf20 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form no 5 FY 2020 21.pdf20 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form no 5 FY 2021 22.pdf20 Mar 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: archiect certificate.pdf17 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer certificate form2.pdf17 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Quality assurance certificate 31-03-2020.pdf17 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Quality assurance certificate 31-03-2021.pdf17 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Quality assurance certificate 31-03-2022.pdf17 Feb 2023
Disclosure of sold/ booked inventoryFile: Final Disclosure of inventory for Rera_compressed.pdf17 Feb 2023
Certificates of CA (Form 5)File: rera shyam sagar.pdf29 Sep 2018
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf2 Apr 2018
Details of encumbrancesFile: No Encumbrances.pdf31 Jul 2017
Declaration in FORM BFile: Promoter Form B.pdf31 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Cert.pdf31 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Cert.pdf31 Jul 2017
Certificates of CA (Form 3)File: CA Cert.pdf31 Jul 2017
Layout approvalFile: Layout.pdf30 Jul 2017
Building plan approvalFile: CC.pdf30 Jul 2017
PAN CardFile: Pan card Shyam Sagar.pdf30 Jul 2017
Copy of the legal title reportFile: 01-Title Cert.pdf30 Jul 2017
Copy of the legal title reportFile: 02-Title Cert.pdf30 Jul 2017
Copy of Layout Approval (in case of layout)File: Layout.pdf30 Jul 2017
Building Plan Approval (IOD)File: CC.pdf30 Jul 2017
Proforma of Allotment letterFile: Alotment letter and Agreement for Sale.pdf30 Jul 2017

How this compares with Palghar

31%of Palghar projects moved their completion datethis one moved by 42 months
26%of Palghar registrations have lapsed or been cancelledthis one is completed

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SPRING FIELD on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near .3,200+ in Palghar

2 kmSPRING FIELDCompleted 128Lapsed / revoked 60Other 146Dot size: filed unitsN

Filed coordinates, straight-line distance. 334 registered projects within 2 km.

Builder: M/S. SHYAM SAGAR DEVELOPERS

M/S. SHYAM SAGAR DEVELOPERS has 1 registration on MahaRERA, including SPRING FIELD. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if SPRING FIELD is delayed beyond 30 Jun 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SPRING FIELD?

The registered promoter entity is M/S. SHYAM SAGAR DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SPRING FIELD?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SPRING FIELD?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SPRING FIELD?

The professionals named in the filing: Architect: SUDHIR R MAGDUM; Engineer: R D Magdum; Chartered Accountant: Nilesh B Patel. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SPRING FIELD?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SPRING FIELD. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SPRING FIELD to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.