Home / Browse projects / Thane, Maharashtra / SPM Dream City Phase 2

Registered Litigation declared Residential / Group Housing project

SPM Dream City Phase 2

By Swastik Lifespace

RG-MH-19394 · RERA P51700077651 · Last updated on MahaRERA portal: 16 Jun 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 1 case

Clear

  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2030Possession promisedno revision filed
3 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 59%
149 of 173Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 65 documents Report an error

SPM Dream City Phase 2 is a Residential / Group Housing project by Swastik Lifespace in Thane, Maharashtra, registered with MahaRERA as P51700077651 on 17 Oct 2024. Possession is promised by 31 Dec 2030. 24 of the 173 units on this registration are recorded sold or booked, and 3 of 22 construction stages are filed complete.

At a glance

Project

  • NameSPM Dream City Phase 2
  • TypeResidential / Group Housing
  • Location
    • Pipeline Road
    • Pale Gaon
    • Ambarnath (R)
    • Ambarnath
    • Thane
    • 421506
  • Pincode421506
  • RERA no.P51700077651
  • ReraGenie IDRG-MH-19394

Builder

  • NameSwastik Lifespace
  • Entity typePartnership
  • PartnerMahesh Vinaychand Kothari

Key dates

this monthRegisteredOct 2024PromisedDec 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on17 Oct 2024
  • Promised completion31 Dec 2030
  • Revised completionNone
  • Buildings2 building records
  • Documents filed65 files

Current status

14%24 of 173 units booked
19.2%Work done, per cost certificate

Figures as on 16 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing ENA17161260126
Wing CNA6640747

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 16 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 59%.

Wing E33%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure59%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises4%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Wing C0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 16 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed284

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots284
Closed/Covered156
Open Space128
BuildingClosed/CoveredOpen SpaceTotal
Wing E5647103
Wing C10081181

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,950 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityAmbernath Municipal Council
Permissible FSI8706.08
Proposed, not sanctioned8,706 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPLOT NO PAP 59 NEAR DNS BANK OPP MAHARASHTRA WEIGHT BRIDGE ANAND NAGAR AMBERNATH MAHARASHTRA 421506
Estimated costRs 41.72 cr
Cost incurredRs 8.01 cr
Work done19.19%
BuildingWingEstimatedIncurred
Wing CNARs 18.13 cr-
Wing ENARs 17.98 crRs 8.01 cr
-NARs 5.62 cr-

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVishal Dalal
EngineerDesignage Consulting Structural Engineers
Chartered AccountantMonisha Milind Kuperkar
Chartered AccountantMangesh Avinash Ghanekar
Chartered AccountantJoshi Kale & Associates
PartnerRole in project
Swastik Lifespace-

Litigation declared1

CaseCourtStatus
356/2022/2022Civil Judge Senior Division KalyanThe matter is for evidence of plaintiff

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 9 Oct 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 9 Oct 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 9 Oct 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 9 Oct 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2030

Documents filed65

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Signed Form 1 March 26_Swastik Lifespace.pdf16 Jun 2026
Withdrawal Update Form 2File: Signed Form 2 March 26_Swastik Lifespce.pdf16 Jun 2026
Withdrawal Update Form 3File: Signed Form 3 March 26_Swastik Lifespace.pdf16 Jun 2026
Withdrawal Update Form 1File: Signed Form 1.pdf11 Mar 2026
Withdrawal Update Form 1File: Signed Form 1.pdf11 Mar 2026
Withdrawal Update Form 1File: Signed Form 1_Dec 2025.pdf11 Mar 2026
Withdrawal Update Form 2File: Signed Form 2.pdf11 Mar 2026
Withdrawal Update Form 2File: Signed Form 2-Sept 25.pdf11 Mar 2026
Withdrawal Update Form 2File: Signed Form 2_Dec 2025.pdf11 Mar 2026
Withdrawal Update Form 3File: Signed Form 3.pdf11 Mar 2026
Withdrawal Update Form 3File: Signed Form 3.pdf11 Mar 2026
Withdrawal Update Form 3File: Signed Form 3_Dec 2025.pdf11 Mar 2026
Form 5 (FY 2024-2025)File: Form 5 FY 24-25 Swastik Lifespace_signed.pdf23 Jan 2026
Form 2File: Signed form 2.pdf11 Jun 2025
Form 3File: Signed form 3.pdf11 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold or Unsold Inventory Swastik Lifespace.pdf11 Jun 2025
Self-declaration of Quarterly ProgressFile: Self Declaration on QPR.pdf11 Jun 2025
Form 1File: Form 1.pdf11 Jun 2025
Form 1File: Signed Form 1 _March 2025.pdf11 Jun 2025
Form 2File: Signed Form 2_ March 2025.pdf11 Jun 2025
Form 3File: Signed Form 3_ Swastik Lifespace March 2025.pdf11 Jun 2025
Disclosure of Sold and Booked InventoryFile: Signed Disclosure of secured & unsecured.pdf11 Jun 2025
Self-declaration of Quarterly ProgressFile: Signed Self Declaration.pdf11 Jun 2025
Withdrawal Update Form 1File: Signed Form 1 _March 2025.pdf11 Jun 2025
Withdrawal Update Form 2File: Signed Form 2_ March 2025.pdf11 Jun 2025
Withdrawal Update Form 3File: Signed Form 3_ Swastik Lifespace March 2025.pdf11 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Swastik Lifesapce Form 1 Dec 2024.pdf28 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Swastik Lifesapce Form 3 Dec 2024.pdf28 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Swastik Lifespace Form 2 Dec 2024.pdf28 Apr 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Swastik Lifesapce - RERA - Format A.pdf28 Apr 2025
Other - TechnicalFile: Swastik Lifespace - RERA - Annexure A - Notary.pdf28 Apr 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Swastik Lifesapce - RERA - Format B - HDFC Bank.pdf28 Apr 2025
Disclosure for secured/unsecured finance availed for the projectFile: SL_Secured_Unsecured_Finance.pdf14 Feb 2025
Details of encumbrances concerned to FinanceFile: Swastik Lifespace - Encumbrances Certificate.pdf13 Jan 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Swastik - Declaration about Separate Bank Ac.pdf13 Jan 2025
Details of encumbrances concerned to LegalFile: Swastik Lifespace - Encumbrances Certificate.pdf13 Jan 2025
Proforma of Agreement for saleFile: Swastik Lifesapce _ 1Rera_Draft_-__Swastik_Lifespace__2024.pdf13 Jan 2025
Details of encumbrances concerned to FinanceFile: Non encumbrance - legal.pdf15 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf15 Oct 2024
Other - LegalFile: 04 Purchase Agreement_compressed.pdf15 Oct 2024
Details of encumbrances concerned to LegalFile: Non encumbrance - legal.pdf15 Oct 2024
Other - TechnicalFile: Declaration Cum Undertaking.pdf15 Oct 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B.pdf15 Oct 2024
Disclosure for secured/unsecured finance availed for the projectFile: Disclosure for secured unsecured Finance availed for project.pdf15 Oct 2024
Building plan approvalFile: 07 Layout and Building Plan Approved E and C Wing.pdf9 Oct 2024
Layout approvalFile: 07 Layout and Building Plan Approved E and C Wing.pdf9 Oct 2024
PAN CardFile: Pan Card.pdf9 Oct 2024
Copy of the legal title reportFile: Legal Title Report.pdf9 Oct 2024
Details of encumbrances concerned to FinanceFile: Final Financial Encumbrance Certificate.pdf9 Oct 2024
Copy of Layout Approval (in case of layout)File: 07 Layout and Building Plan Approved E and C Wing.pdf9 Oct 2024
Proforma of Allotment letterFile: Draft Allotment Letter.pdf9 Oct 2024
Declaration in FORM BFile: Form B Land Owner.pdf9 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf9 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf9 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: 08 Commencement Certificate CC E Wing and C Wing.pdf9 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: 07 Layout and Building Plan Approved E and C Wing.pdf9 Oct 2024
Declaration about Commencement CertificateFile: Declaration About Commencement Certificate.pdf9 Oct 2024
CERSAI detailsFile: CERSAI Declaration.pdf9 Oct 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Format-A.pdf9 Oct 2024
Deviation Report with respect to Allotment letterFile: Declaration about Deviation in allotment letter.pdf9 Oct 2024
Details of encumbrances concerned to LegalFile: Final Financial Encumbrance Certificate.pdf9 Oct 2024
Deviation Report with respect to model copy of AgreementFile: Declaration about Deviation in Agreement.pdf9 Oct 2024
Proforma of Agreement for saleFile: Draft AFS.pdf9 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest Mahesh Kothari.pdf9 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest Gulab Singh.pdf9 Oct 2024

How this compares with Thane

14%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SPM Dream City Phase 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Pale Gaon7,600+ in Thane

Builder: Swastik Lifespace

Swastik Lifespace has 1 registration on MahaRERA, including SPM Dream City Phase 2. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if SPM Dream City Phase 2 is delayed beyond 31 Dec 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SPM Dream City Phase 2?

The registered promoter entity is Swastik Lifespace, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SPM Dream City Phase 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SPM Dream City Phase 2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SPM Dream City Phase 2?

The professionals named in the filing: Architect: Vishal Dalal; Engineer: Designage Consulting Structural Engineers; Chartered Accountant: Monisha Milind Kuperkar; Chartered Accountant: Mangesh Avinash Ghanekar; Chartered Accountant: Joshi Kale & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SPM Dream City Phase 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SPM Dream City Phase 2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SPM Dream City Phase 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.