Home / Browse projects / Thane, Maharashtra / Empire Industrial Centrum Phase 5

Registered No litigation declared Residential / Group Housing project

Empire Industrial Centrum Phase 5

By EMPIRE INDUSTRIES LTD

RG-MH-88184 · RERA P51700047011 · Last updated on MahaRERA portal: 24 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Jun 2027Possession promisedno revision filed
5 of 22Construction stages doneacross 2 buildings; furthest along: Stilt Floor, 90%
128 of 168Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 109 documents Report an error

Empire Industrial Centrum Phase 5 is a Residential / Group Housing project by EMPIRE INDUSTRIES LTD in Thane, Maharashtra, registered with MahaRERA as P51700047011 on 26 Sep 2022. Possession is promised by 30 Jun 2027. 40 of the 168 units on this registration are recorded sold or booked, and 5 of 22 construction stages are filed complete.

At a glance

Project

  • NameEmpire Industrial Centrum Phase 5
  • TypeResidential / Group Housing
  • Location
    • MIDC AMBARNATH INDUSTRIAL AREA
    • AMBARNATH
    • Badlapur (M Cl)
    • Thane
    • 421506
  • Pincode421506
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700047011
  • ReraGenie IDRG-MH-88184

Builder

  • NameEMPIRE INDUSTRIES LTD
  • Entity typeCompany
  • Director Finance and Company SecretarySuhas Chandra Nanda
  • Other registrations1 more →
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredSep 2022PromisedJun 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on26 Sep 2022
  • Promised completion30 Jun 2027
  • Revised completionNone
  • Buildings2 building records
  • Documents filed109 files

Current status

24%40 of 168 units booked
61.3%Work done, per cost certificate

Figures as on 24 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
C WINGNA131296096
D WINGNA131272072

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 24 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Stilt Floor, at 90%.

C WING50%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor90%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises65%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks65%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.25%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
D WING18%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 24 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes25%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes20%
Storm Water DrainsYes5%
Landscaping & Tree PlantingYes5%
Street LightingYes0%
Community BuildingsYes15%
Treatment And Disposal Of Sewage And Sullage WaterYes80%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes35%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes20%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed58

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots58
Closed/Covered58
BuildingClosed/CoveredTotal
C WING3636
D WING2222

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area21,210 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on1 Jun 2025

Approvals and building plan

Sanctioning authorityMAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION
Permissible FSI8371.25
Proposed, not sanctioned8,371 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchAMABARNATH
Estimated costRs 38.72 cr
Cost incurredRs 23.72 cr
Work done61.28%
BuildingWingEstimatedIncurred
C WINGNARs 17.00 crRs 11.34 cr
D WINGNARs 17.00 crRs 11.34 cr
-NARs 4.72 crRs 1.04 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRADICAL VISION ARCHITECT
EngineerVipin Singh Singh
EngineerVipin Kumar Singh
EngineerGem Engserv Private Limited
Chartered AccountantJATIN MOTWANI & CO Jatin Motwani
Chartered AccountantP.R. Kotadiya and Associates
PartnerRole in project
EMPIRE INDUSTRIES LTD-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 2 Sep 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 Sep 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 2 Sep 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 2 Sep 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2027

Documents filed109

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 109 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1-Empire-Phase 5-16-03-2025.pdf24 Apr 2026
Withdrawal Update Form 1File: Form 1-Empire-Phase 5-16-03-2025.pdf24 Apr 2026
Withdrawal Update Form 2File: Engineer Certificate.pdf24 Apr 2026
Withdrawal Update Form 2File: Engineer Certificate.pdf24 Apr 2026
Withdrawal Update Form 3File: Withdrawal Application Form3_Dec25.pdf24 Apr 2026
Withdrawal Update Form 3File: Withdrawal Application Form3_Dec25.pdf24 Apr 2026
Withdrawal Update Form 1File: Form 1.pdf28 Oct 2025
Withdrawal Update Form 1File: Form 1.pdf28 Oct 2025
Withdrawal Update Form 1File: Form 1.pdf28 Oct 2025
Withdrawal Update Form 2File: Form 2.pdf28 Oct 2025
Withdrawal Update Form 2File: Form 2.pdf28 Oct 2025
Withdrawal Update Form 2File: Form 2.pdf28 Oct 2025
Withdrawal Update Form 3File: cert form3 28102025.pdf28 Oct 2025
Withdrawal Update Form 3File: cert form3 28102025.pdf28 Oct 2025
Withdrawal Update Form 3File: cert form3 28102025.pdf28 Oct 2025
Form 1File: Form 1 Dec 23.pdf19 Aug 2025
Form 2File: Form 2 Dec 23.pdf19 Aug 2025
Form 3File: Form 3 Dec 23.pdf19 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold 31-Dec-2023.pdf19 Aug 2025
Form 1File: Form 1 Dec 24.pdf19 Aug 2025
Form 2File: Form 2 Dec 24.pdf19 Aug 2025
Form 3File: Form 3 Dec 24.pdf19 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold 31-Dec-2024.pdf19 Aug 2025
Form 1File: Form-1 phase-5 dt-31-03-2025.pdf19 Aug 2025
Form 2File: Form-2 phase-5 dt-31-03-2025.pdf19 Aug 2025
Form 3File: Form-3 phase-5 dt-31-03-2025.pdf19 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold 31-Mar-2025.pdf19 Aug 2025
Withdrawal Update Form 1File: 20250725_WING C D_Application Form1_compressed.pdf19 Aug 2025
Withdrawal Update Form 2File: img20250728_16240128.pdf19 Aug 2025
Withdrawal Update Form 3File: FORM 3_001.pdf19 Aug 2025
Withdrawal Update Form 1File: 20250725_WING C D_Application Form1_compressed.pdf4 Aug 2025
Withdrawal Update Form 2File: img20250728_16240128.pdf4 Aug 2025
Withdrawal Update Form 3File: FORM 3_001.pdf4 Aug 2025
Form 1File: C-WING_D-WING_merged.pdf28 Jul 2025
Form 2File: img20250723_14441955.pdf28 Jul 2025
Form 3File: img20250723_14470286.pdf28 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Disclosure March 2023.pdf28 Jul 2025
Form 1File: C-WING_D-WING_merged (1).pdf28 Jul 2025
Form 2File: img20250723_15411123.pdf28 Jul 2025
Form 3File: img20250723_15431859.pdf28 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Data March 24.pdf28 Jul 2025
Form 1File: C-WING_D-WING_merged (2).pdf28 Jul 2025
Form 2File: img20250723_15561161.pdf28 Jul 2025
Form 3File: img20250723_15542712.pdf28 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Data June 24.pdf28 Jul 2025
Withdrawal Update Form 1File: Form-1 phase-5 dt-31-03-2025.pdf19 Jun 2025
Withdrawal Update Form 2File: FROM-2 PHASE-5 DATE-31-12-2024.pdf19 Jun 2025
Withdrawal Update Form 3File: Form-3 phase-5 dt-31-03-2025.pdf19 Jun 2025
Withdrawal Update Form 1File: Form-1 phase-5 dt-31-03-2025.pdf1 Jun 2025
Withdrawal Update Form 1File: Form-1 phase-5 dt-31-03-2025.pdf1 Jun 2025
Withdrawal Update Form 2File: FROM-2 PHASE-5 DATE-31-12-2024.pdf1 Jun 2025
Withdrawal Update Form 2File: FROM-2 PHASE-5 DATE-31-12-2024.pdf1 Jun 2025
Withdrawal Update Form 3File: Form-3 phase-5 dt-31-03-2025.pdf1 Jun 2025
Withdrawal Update Form 3File: Form-3 phase-5 dt-31-03-2025.pdf1 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 phase-5 dt-31-03-2025.pdf22 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 phase-5 dt-31-03-2025_compressed.pdf22 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 phase-5 dt-31-03-2025.pdf22 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form-5 Phase-5 Dt-19-03-2025_compressed.pdf24 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 20241231_C WING_RERA_FORM 1_compressed.pdf27 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 20241231_D WING_RERA_FORM 1_compressed.pdf27 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: phase-5_compressed.pdf27 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FROM-2 PHASE-5 DATE-31-12-2024.pdf27 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: PH5 sept_compressed.pdf27 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate-Phase-5_comp.pdf27 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form-3 phase-5 3062024.pdf25 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: empire ph 5_compressed.pdf22 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: jatin motwani phase-5_compressed_compressed.pdf19 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: jatin motwani phase-5_compressed_compressed.pdf11 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: sept phase -5_compressed.pdf22 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: PH5-3(1)_11zon.pdf11 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: PH5-3(2)_11zon.pdf11 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 20230802_CWING_RERA_FORM 1_compressed.pdf4 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 20230802_DWING_RERA_FORM 1_compressed.pdf4 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A _C.pdf4 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A_D.pdf4 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: EC_CWING_RERA_FORM 1_M23.pdf8 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: EC_DWING_RERA_FORM 1_M23.pdf8 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - P5 - Mar23 -upload.pdf8 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A - P5 WC- Mar23.pdf1 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A - P5 WD- Mar23.pdf1 May 2023

How this compares with Thane

24%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Empire Industrial Centrum Phase 5 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near AMBARNATH7,600+ in Thane

2 kmEmpire Industrial CentruCompleted 72Lapsed / revoked 39Other 38Dot size: filed unitsN

Filed coordinates, straight-line distance. 149 registered projects within 2 km.

Builder: EMPIRE INDUSTRIES LTD

EMPIRE INDUSTRIES LTD has 2 registrations on MahaRERA, including Empire Industrial Centrum Phase 5 and Empire Industrial Centrum Phase 6. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Empire Industrial Centrum Phase 5 is delayed beyond 30 Jun 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Empire Industrial Centrum Phase 5?

The registered promoter entity is EMPIRE INDUSTRIES LTD, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Empire Industrial Centrum Phase 5?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Empire Industrial Centrum Phase 5?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Empire Industrial Centrum Phase 5?

The professionals named in the filing: Architect: RADICAL VISION ARCHITECT; Engineer: Vipin Singh Singh; Engineer: Vipin Kumar Singh; Engineer: Gem Engserv Private Limited; Chartered Accountant: JATIN MOTWANI & CO Jatin Motwani; Chartered Accountant: P.R. Kotadiya and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Empire Industrial Centrum Phase 5?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Empire Industrial Centrum Phase 5. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Empire Industrial Centrum Phase 5 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.