Home / Browse projects / Thane, Maharashtra / Empire Industrial Centrum Phase 6
Empire Industrial Centrum Phase 6
RG-MH-95870 · RERA P51700048112 · Last updated on MahaRERA portal: 1 Jun 2025
Source: official MahaRERA filing
Red flags
- De-registered
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Empire Industrial Centrum Phase 6 is a Mixed project by EMPIRE INDUSTRIES LTD in Thane, Maharashtra, registered with MahaRERA as P51700048112 on 12 Dec 2022. Possession is promised by 31 Oct 2026.
At a glance
Project
- NameEmpire Industrial Centrum Phase 6
- TypeMixed
- Location
- MIDC AMBARNATH INDUSTRIAL AREA
- AMBARNATH
- Chavindra
- Thane
- 421506
- Pincode421506
- RERA no.P51700048112
- ReraGenie IDRG-MH-95870
Builder
- NameEMPIRE INDUSTRIES LTD
- Entity typeCompany
- DirectorSATISH MALHOTRA
- Other registrations1 more →
- No longer live1 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusDe-registered
- Registered on12 Dec 2022
- Promised completion31 Oct 2026
- Revised completionNone
- Buildings1 building record
- Documents filed59 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Empire Industrial Centrum Phase 6 | NA | 4 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 1 Jun 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 0%.
Empire Industrial Centrum Phase 6: 0% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 1 Jun 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 50% |
| Water Supply | Yes | 65% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 65% |
| Storm Water Drains | Yes | 25% |
| Landscaping & Tree Planting | Yes | 20% |
| Street Lighting | Yes | 10% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 50% |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 30% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 25% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed28
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | RADICAL VISION ARCHITECT |
| Engineer | Vipin Singh |
| Chartered Accountant | JATIN MOTWANI & CO |
| Partner | Role in project |
|---|---|
| EMPIRE INDUSTRIES LTD | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 6 Dec 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 9 Nov 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 9 Nov 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 8 Nov 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Oct 2026
Documents filed59
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: Form-1 phase-5 dt-31-03-2025.pdf | 1 Jun 2025 |
| Form 2File: Form-2 phase-5 dt-31-03-2025.pdf | 1 Jun 2025 |
| Form 3File: Form-3 phase-5 dt-31-03-2025.pdf | 1 Jun 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 phase-6 dt-31-03-2025.pdf | 22 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 phase-6 dt-31-03-2025_compressed.pdf | 22 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 phase-6 dt-31-03-2025.pdf | 22 Apr 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form-5 Phase-6 Dt-19-03-2025_compressed.pdf | 24 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 20241231_A1_RERA_FORM 1_compressed.pdf | 27 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: phase-6_compressed.pdf | 27 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 PHASE-6 DATE-31-12-2024.pdf | 27 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: PH6 sept_compressed.pdf | 27 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate - FORM 2Phase-6_comp.pdf | 27 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form-3 phase-6 30062024.pdf | 25 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: empire ph 6_compressed.pdf | 22 May 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: jatin motwani phase-6_compressed_compressed.pdf | 19 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: jatin motwani phase-6_compressed_compressed.pdf | 11 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: sept phase -6_compressed.pdf | 22 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: PH6-3(1)_11zon.pdf | 11 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: PH6-3(2)_11zon.pdf | 11 Aug 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 20230802_A1.pdf | 4 Aug 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A.pdf | 4 Aug 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: EC_A1_RERA_FORM 1_M23.pdf | 8 May 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: EC_A1_RERA_FORM 1_M23.pdf | 8 May 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - P6 - Mar23.pdf | 8 May 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - P6 - Mar23_upload.pdf | 8 May 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A - P6 - Mar23.pdf | 1 May 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Empire PH-6 Dec 22_compressed.pdf | 17 Mar 2023 |
| Copy of the legal title reportFile: Title report.pdf | 6 Dec 2022 |
| Copy of the legal title reportFile: Phase 6 - Plot Area Letter.pdf | 6 Dec 2022 |
| Proforma of Agreement for saleFile: Phase 6 - A1- Industrial- Agreement for Assignment.pdf | 6 Dec 2022 |
| Deviation Report with respect to Allotment letterFile: Phase 6 - Allotment deviation report_Revised.pdf | 6 Dec 2022 |
| Deviation Report with respect to model copy of AgreementFile: Phase 6 - Agreement deviation report_Revised.pdf | 6 Dec 2022 |
| Layout approvalFile: Phase 6 - Layout with Highlighted Plot Area - A1.pdf | 9 Nov 2022 |
| Building plan approvalFile: Phase 6 - Layout with Highlighted Plot Area - A1.pdf | 9 Nov 2022 |
| Layout approvalFile: PLANS (1)_1-3.pdf | 9 Nov 2022 |
| Layout approvalFile: PLANS (1)_4-7.pdf | 9 Nov 2022 |
| Layout approvalFile: PLANS (1)_8-end.pdf | 9 Nov 2022 |
| Building plan approvalFile: PLANS (1)_1-3.pdf | 9 Nov 2022 |
| Building plan approvalFile: PLANS (1)_4-7.pdf | 9 Nov 2022 |
| Building plan approvalFile: PLANS (1)_8-end.pdf | 9 Nov 2022 |
| Copy of Layout Approval (in case of layout)File: Phase 6 - Layout with Highlighted Plot Area - A1.pdf | 9 Nov 2022 |
| Copy of Layout Approval (in case of layout)File: PLANS (1)_1-3.pdf | 9 Nov 2022 |
| Copy of Layout Approval (in case of layout)File: PLANS (1)_4-7.pdf | 9 Nov 2022 |
| Copy of Layout Approval (in case of layout)File: PLANS (1)_8-end.pdf | 9 Nov 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Phase 6 - Layout with Highlighted Plot Area - A1.pdf | 9 Nov 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: PLANS (1)_1-3.pdf | 9 Nov 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: PLANS (1)_4-7.pdf | 9 Nov 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: PLANS (1)_8-end.pdf | 9 Nov 2022 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: EIC - Phase 6 - Bank Letter.pdf | 9 Nov 2022 |
| PAN CardFile: Company pan card.pdf | 8 Nov 2022 |
| Details of encumbrances concerned to FinanceFile: No Encumberance letter.pdf | 8 Nov 2022 |
| Details of encumbrances concerned to LegalFile: No Encumberance letter.pdf | 8 Nov 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: CC.pdf | 8 Nov 2022 |
| Declaration about Commencement CertificateFile: Declaration About Commencement Certificate.pdf | 8 Nov 2022 |
| Declaration in FORM BFile: Form B.pdf | 8 Nov 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Phase 6 - FORM 1_Architect Certificate A1.pdf | 8 Nov 2022 |
| CERSAI detailsFile: CERSAI Declaration.pdf | 8 Nov 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Phase 6 with Promoters Sign.pdf | 8 Nov 2022 |
| Proforma of Allotment letterFile: Clean draft of Allotment Letter- Empire (1).pdf | 8 Nov 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration, which the RERA portal never shows together
- All 59 filed documents as one ZIP, foldered, with a manifest
Keep Empire Industrial Centrum Phase 6 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near AMBARNATH7,600+ in Thane
Precious Infinity
RKR Construction
SPM Dream City Phase 2
Swastik Lifespace
Empire Industrial Centrum Phase 5
EMPIRE INDUSTRIES LTD
MID-TOWN
SIDDHIVINAYAK GROUP NX
Sai Prasad Apartment
Shobha Dhanaji Nalawade
Moosa Residency
M S Developers
See every Thane project, with the district possession charts
Builder: EMPIRE INDUSTRIES LTD
EMPIRE INDUSTRIES LTD has 2 registrations on MahaRERA, including Empire Industrial Centrum Phase 5 and Empire Industrial Centrum Phase 6. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What does it mean that Empire Industrial Centrum Phase 6 shows as de-registered on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if Empire Industrial Centrum Phase 6 is delayed beyond 31 Oct 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Empire Industrial Centrum Phase 6?
The registered promoter entity is EMPIRE INDUSTRIES LTD, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Empire Industrial Centrum Phase 6?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Empire Industrial Centrum Phase 6?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Empire Industrial Centrum Phase 6?
The professionals named in the filing: Architect: RADICAL VISION ARCHITECT; Engineer: Vipin Singh; Chartered Accountant: JATIN MOTWANI & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Empire Industrial Centrum Phase 6?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback