ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / SP HOUSE

Registered No litigation declared Mixed project

SP HOUSE

By SP ESTATES

RG-MH-05745 · RERA P52100077083 · Last updated on MahaRERA portal: 12 May 2026

Source: official MahaRERA filing

Red flags

  • Rs 4.00 crore secured on the land, in favour of State Bank of India

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Apr 2027Possession promisedno revision filed
4 of 11Construction stages donefurthest along: Staircases, 65%
9 of 12Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 67 documents Report an error

SP HOUSE is a Mixed project by SP ESTATES in Pune, Maharashtra, registered with MahaRERA as P52100077083 on 23 Jul 2024. Possession is promised by 30 Apr 2027. 3 of the 12 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameSP HOUSE
  • TypeMixed
  • Location
    • SEASONS ROAD
    • ANAND PARK
    • AUNDH
    • Pune (M Corp.)
    • Pune City
    • Pune
    • 411007
  • Pincode411007
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100077083
  • ReraGenie IDRG-MH-05745

Builder

  • NameSP ESTATES
  • Entity typePartnership
  • GSTIN27AFAFS4510C1ZH
  • PartnersSAHIL VIVEK PRADHAN, MANOJ B RAGHUWANSHI
  • Declared earlier projects4 →

Key dates

this monthRegisteredJul 2024PromisedApr 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on23 Jul 2024
  • Promised completion30 Apr 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed67 files

Current status

25%3 of 12 units booked
31.2%Work done, per cost certificate

Figures as on 12 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SP HOUSENA866612

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 12 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 65%.

SP HOUSE: 48% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure62%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks65%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 12 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNo75%
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)YesNot applicable
Storm Water DrainsYes75%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNo0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes50%
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed52

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots52
Closed/Covered52

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area385 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofState Bank of India
Secured amountRs 4.00 crore
CERSAI search filedYes
Declared on16 Mar 2026

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI1119.95
Proposed, not sanctioned1,120 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNO 171, GRACE BUILDING DHOLE PATIL ROA, BUND GARDEN RD, PUNE MAH 411001
Estimated costRs 4.52 cr
Cost incurredRs 1.41 cr
Work done31.23%
BuildingWingEstimatedIncurred
SP HOUSENARs 3.96 crRs 1.36 cr
-NARs 56.51 lakhRs 5.53 lakh

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectALOK KIRAD
ArchitectSANJEEV MEHTA
EngineerG A BHILLARE RCC
EngineerCONSOLIDATED CONSULTANTS MEP
EngineerSAHIL PRADHAN
Chartered AccountantNITESH M SHAH & CO CHARTERED ACCOUNTANTS
PartnerRole in project
SP ESTATES-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Jun 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 13 Mar 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 13 Mar 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 May 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Apr 2027

Documents filed67

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Q 4 Fy 25-26.pdf12 May 2026
Withdrawal Update Form 2File: Form 2 Q 4 fy 25-26.pdf12 May 2026
Withdrawal Update Form 3File: Form 3 Q-4 Fy 25-26.pdf12 May 2026
Layout approvalFile: 1-1.pdf13 Mar 2026
Building plan approvalFile: 1-1.pdf13 Mar 2026
Form 1File: Form 1- Q-1- FY 25-26.pdf27 Feb 2026
Form 2File: Form 2- Q-1-FY 25-26.pdf27 Feb 2026
Form 3File: form 3- Q -1- FY 25-26.pdf27 Feb 2026
Disclosure of Sold and Booked InventoryFile: Inventory Declaration Sold Unsold_Q1 FY 2025-26.pdf27 Feb 2026
Form 1File: RERA Form 1 Q-2 FY 25-26.pdf27 Feb 2026
Form 2File: RERA Form 2 Q-2 FY 25-26.pdf27 Feb 2026
Form 3File: RERA Form 3 Q-2 FY 25-26.pdf27 Feb 2026
Disclosure of Sold and Booked InventoryFile: Inventory Declaration Sold Unsold_Q2 FY 2025-26.pdf27 Feb 2026
Form 1File: RERA Form 1 Q-3 FY 25-26.pdf27 Feb 2026
Form 2File: RERA Form 2 Q-3 FY 25-26.pdf27 Feb 2026
Form 3File: RERA Form 3 Q-3 FY 25-26.pdf27 Feb 2026
Disclosure of Sold and Booked InventoryFile: Inventory Declaration Sold Unsold_Q3 FY 2025-26.pdf27 Feb 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 -Q 4 - FY 24-25.pdf20 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q-4.pdf20 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Annexure B.pdf20 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold unsold Inventory SPH Q4.pdf20 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory SPH.pdf21 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA SPE Architects Certificate.pdf16 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA SPE CA Certificate.pdf16 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA SPE Engineer Certificate.pdf16 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SPE RERA form 3.pdf17 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA SPE Architects Certificate.pdf10 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 03- SP House Sep -24.pdf10 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA SPE Engineer Certificate.pdf10 Dec 2024
Proforma of Agreement for saleFile: final ATS (1).pdf14 Jul 2024
Proforma of Allotment letterFile: allotment letter.pdf14 Jul 2024
Deviation Report with respect to Allotment letterFile: 1 Deviation Report with respect to Allotment letter (5) (2).pdf14 Jul 2024
Deviation Report with respect to model copy of AgreementFile: GetUserDocumentFileContent (2).pdf14 Jul 2024
CERSAI detailsFile: Cersai Report.pdf10 Jul 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: SP ESTATES-1.pdf10 Jul 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: SP ESTATES-2.pdf10 Jul 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: SP ESTATES12.pdf3 Jul 2024
Other - LegalFile: 1 APT1_REGISTERED POA.pdf30 Jun 2024
Other - LegalFile: 3 APT 2 - DEED OF GIFT REG_compressed.pdf30 Jun 2024
Other - LegalFile: 4 1 APT2 - POA REG.pdf30 Jun 2024
Other - LegalFile: 4 APT 2 - DEED OF SALE REG_compressed.pdf30 Jun 2024
Other - LegalFile: 5 APT 3 - DEED OF SALE REGISTERED_compressed.pdf30 Jun 2024
Other - LegalFile: 6 APT 3 - REGISTERED Power of Attorney.pdf30 Jun 2024
Other - LegalFile: 7 1POA-APT4-PMITKAR-SIGNED_compressed.pdf30 Jun 2024
Other - LegalFile: 7 Deed of Sale Flat no 4 MAYA_compressed.pdf30 Jun 2024
Other - LegalFile: 8 1 POA - APT 5 - GMITKAR - SIGNED_compressed.pdf30 Jun 2024
Other - LegalFile: 8 Deed of Sale Flat no 5 MAYA_compressed.pdf30 Jun 2024
Other - LegalFile: apt 1-1.pdf30 Jun 2024
Other - LegalFile: apt 1-2.pdf30 Jun 2024
Other - TechnicalFile: RERA Mail 1.pdf28 Jun 2024
Copy of the legal title reportFile: SP House RERA Title report Adv Abhay (1).pdf26 Jun 2024
CERSAI detailsFile: CERSAI_Search_Report_200311542391_For_Asset_Based_Search_26_06_2024_16_56_12_608 (2).pdf26 Jun 2024
Other - LegalFile: SP ESTATES123.pdf26 Jun 2024
Other - TechnicalFile: Order 50.pdf26 Jun 2024
Details of encumbrances concerned to FinanceFile: Financial and Legal.pdf18 Jun 2024
Details of encumbrances concerned to LegalFile: Financial and Legal.pdf18 Jun 2024
Declaration in FORM BFile: SPH FORM B UPDATED.pdf18 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 signed_001_compressed.pdf12 May 2024
Declaration about Commencement CertificateFile: DECL CC - FORMAT D.pdf8 May 2024
Layout approvalFile: SANCTIONED PLAN_compressed-2.pdf6 May 2024
Building plan approvalFile: SANCTIONED PLAN_compressed-2.pdf6 May 2024
PAN CardFile: SPE PAN Card .pdf6 May 2024
Details of encumbrances concerned to FinanceFile: LEGAL ENCUMB DECLARATION.pdf6 May 2024
Details of encumbrances concerned to LegalFile: LEGAL ENCUMB DECLARATION.pdf6 May 2024
Copy of Layout Approval (in case of layout)File: SANCTIONED PLAN_compressed-2.pdf6 May 2024
Building Plan Approval / NA Order for plotted developmentFile: SANCTIONED PLAN_compressed-2.pdf6 May 2024
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE.pdf6 May 2024

Promoter's earlier projects4

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 delivered on promise1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
OPTIMA 2S NO 37 SINHGAD ROAD WADGAON BK165OngoingDec 2025Dec 2025
ANANTA ONEBHAMBURDA SHIVAJINAGAR PUNE13CompletedApr 2023Apr 2023
SAGA APARTMENTSGREEN PARK PLOT NO 4 AUNDH PUNE9CompletedFeb 2022Jan 2022
SAFFRON KOTHRUDSR NO 54 HISSA 8 NEAR MAHATMA SOCIETY KOTHRUD48CompletedMay 2016Late, Sep 2020

How this compares with Pune

25%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SP HOUSE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near AUNDH13,700+ in Pune

2 kmSP HOUSECompleted 66Lapsed / revoked 23Other 88Dot size: filed unitsN

Filed coordinates, straight-line distance. 177 registered projects within 2 km.

Builder: SP ESTATES

SP ESTATES has 1 registration on MahaRERA, including SP HOUSE. Its filings disclose 4 earlier MahaRERA projects: declares 3 of 4 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if SP HOUSE is delayed beyond 30 Apr 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SP HOUSE?

The registered promoter entity is SP ESTATES, a partnership as per the filing. Its GSTIN 27AFAFS4510C1ZH can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SP HOUSE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SP HOUSE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SP HOUSE?

The professionals named in the filing: Architect: ALOK KIRAD; Architect: SANJEEV MEHTA; Engineer: G A BHILLARE RCC; Engineer: CONSOLIDATED CONSULTANTS MEP; Engineer: SAHIL PRADHAN; Chartered Accountant: NITESH M SHAH & CO CHARTERED ACCOUNTANTS. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SP HOUSE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SP HOUSE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SP HOUSE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.