Home / Browse projects / Pune, Maharashtra / SONIGARA RAJGRUHI
SONIGARA RAJGRUHI
By SHREE SONIGARA DEVELOPMENT CORPORATION
RG-MH-69116 · RERA P52100050175 · Last updated on MahaRERA portal: 11 Feb 2025
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
Nothing adverse is on this record. The buyer report still reads the filed documents themselves.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SONIGARA RAJGRUHI is a Residential / Group Housing project by SHREE SONIGARA DEVELOPMENT CORPORATION in Pune, Maharashtra, registered with MahaRERA as P52100050175 on 21 Mar 2023. The registration is recorded completed; possession was promised by 31 Dec 2025.
At a glance
Project
- NameSONIGARA RAJGRUHI
- TypeResidential / Group Housing
- Location
- NIGDI
- Pimpri Chinchawad (M Corp.)
- Haveli
- Pune
- 411044
- Pincode411044
- RERA no.P52100050175
- ReraGenie IDRG-MH-69116
Builder
- NameSHREE SONIGARA DEVELOPMENT CORPORATION
- Entity typePartnership
- PartnersKETUL BHAGCHAND SONIGARA, BHAVESH BHAGCHAND SONIGARA
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on21 Mar 2023
- Promised completion31 Dec 2025
- Revised completionNone
- Buildings1 building record
- Documents filed70 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SONIGARA RAJGRUHI | NA | 9 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 11 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
9 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.
SONIGARA RAJGRUHI: 82% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 11 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed17
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership7
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| ASHA SURESH PILLAY | Thane (M Corp.) | Thane |
| NAMRATA SURESH PILLAY | Thane (M Corp.) | Thane |
| SURUCHI SURESH PILLAY | Thane (M Corp.) | Thane |
| DINESH MUTHU PILLAY | Kharghar | Raigarh |
| KARTHIK DINESH PILLAY | Kharghar | Raigarh |
| RAMANI MUTHOO PILLAI ALIAS RAMANI SUNDARAMOORTHY | Navi Mumbai (M Corp.) | Thane |
| KUNAL SUNDARA MOORTHY | Navi Mumbai (M Corp.) | Thane |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | YASH JAIN |
| Engineer | AXIS CONSULTANTS |
| Chartered Accountant | VSAP & Company |
| Partner | Role in project |
|---|---|
| SHREE SONIGARA DEVELOPMENT CORPORATION | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 11 Mar 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 14 Feb 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 5 Nov 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 5 Nov 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 5 Nov 2024
Documents filed70
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q2 SSDC.pdf | 11 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q1 SSDC.pdf | 24 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 FY23-24 Rajghruhi.pdf | 5 Dec 2024 |
| Building plan approvalFile: Plan 1.pdf | 5 Nov 2024 |
| Building plan approvalFile: Plan 2.pdf | 5 Nov 2024 |
| Building plan approvalFile: Plan 3.pdf | 5 Nov 2024 |
| Building plan approvalFile: Sanction Plan 1.pdf | 5 Nov 2024 |
| Building plan approvalFile: Sanction Plan 2.pdf | 5 Nov 2024 |
| Building plan approvalFile: Sanction Plan 3.pdf | 5 Nov 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencment Certificate.pdf | 5 Nov 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: SSDC_Commencement Certificate.pdf | 5 Nov 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan 2.pdf | 5 Nov 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Sanction Plan 3.pdf | 5 Nov 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Sanction Plan 2.pdf | 5 Nov 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Sanction Plan 1.pdf | 5 Nov 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan 3.pdf | 5 Nov 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan 1.pdf | 5 Nov 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion Certificate.pdf | 5 Nov 2024 |
| Architect’s Certificate on Completion of Project (Form 4)File: Architect Certificate Form 4 sing.pdf | 29 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 _Architect Certificate.pdf | 28 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 FY 24-25 Q2 Sonigara Rajgruhi.PDF | 28 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Promoters disclosure unit wise June 24.pdf | 28 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Promoters disclosure unit wise_Sep 24.pdf | 28 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_ARCHITECTS_Q1.pdf | 17 Aug 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_FY 23-24 Q4 Sonigara Rajgruhi.pdf | 13 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 FY23-24 Q4 Sonigara Rajgruhi.pdf | 12 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 FY 23-24 Q4 Sonigara Rajgruhi.pdf | 8 Jun 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A FY 23-24 Eng Certificate.pdf | 8 Jun 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 FY 2022-23 Rajghruhi.pdf | 8 Jun 2024 |
| Disclosure of sold/ booked inventoryFile: Promoters disclosure unit wise_March 24.pdf | 7 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_Q1_JUNE 23.pdf | 16 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_Q2_SEP 23.pdf | 16 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_Q3_DEC 23.pdf | 16 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_Q4_MARCH 23.pdf | 15 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Eng Certificate 2023.pdf | 15 May 2024 |
| Disclosure of sold/ booked inventoryFile: Promoters disclosure unit wise_March 23.pdf | 15 May 2024 |
| Disclosure of sold/ booked inventoryFile: Promoters disclosure unit wise_June 23.pdf | 15 May 2024 |
| Disclosure of sold/ booked inventoryFile: Promoters disclosure unit wise_Sep 23.pdf | 15 May 2024 |
| Disclosure of sold/ booked inventoryFile: Promoters disclosure unit wise_Dec 23.pdf | 15 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3FY 22-23 Q 4 Sonigara Rajgruhi.pdf | 15 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3FY 23-24 Q1 Sonigara Rajgruhi.pdf | 15 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3FY 23-24 Q2 Sonigara Rajgruhi.pdf | 15 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3FY 23-24 Q3 Sonigara Rajgruhi.pdf | 15 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_ARCHITECTS_MARCH 23.pdf | 7 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_ARCHITECTS_JUNE 23.pdf | 7 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_ARCHITECTS_SEP 23.pdf | 7 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_ARCHITECTS_DEC 23.pdf | 7 May 2024 |
| Details of encumbrances concerned to FinanceFile: Rev - Encumbrance Certificate.pdf | 13 Mar 2023 |
| Details of encumbrances concerned to LegalFile: Rev - Encumbrance Certificate.pdf | 13 Mar 2023 |
| Copy of the legal title reportFile: SEARCH REPORT.pdf | 11 Mar 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Non Disclosure document.pdf | 11 Mar 2023 |
| CERSAI detailsFile: CERSAI RECEIPT.pdf | 2 Mar 2023 |
| Proforma of Agreement for saleFile: DRAFT AGREEMENT - BY LEGAL REALTY LLP - RAW FLAT.pdf | 2 Mar 2023 |
| Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf | 2 Mar 2023 |
| Deviation Report with respect to model copy of AgreementFile: DEVITATION REPORT - AGREEMENT.pdf | 2 Mar 2023 |
| Declaration in FORM BFile: FORM B - PROMOTER.pdf | 1 Mar 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf | 16 Feb 2023 |
| Layout approvalFile: PLAN - 1.pdf | 14 Feb 2023 |
| Building plan approvalFile: PLAN - 2.pdf | 14 Feb 2023 |
| PAN CardFile: FIRM PAN CARD.pdf | 14 Feb 2023 |
| Details of encumbrances concerned to FinanceFile: ENCUMBRANCE CERTIFICATE.pdf | 14 Feb 2023 |
| Details of encumbrances concerned to LegalFile: ENCUMBRANCE CERTIFICATE.pdf | 14 Feb 2023 |
| Copy of Layout Approval (in case of layout)File: PLAN - 1.pdf | 14 Feb 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: PLAN - 2.pdf | 14 Feb 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE.pdf | 14 Feb 2023 |
| Declaration about Commencement CertificateFile: DECLARATION OF CC.pdf | 14 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf | 14 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE - For RERA.pdf | 14 Feb 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: SEPARATE BANK ACCOUNT DETAILS.pdf | 14 Feb 2023 |
| Deviation Report with respect to Allotment letterFile: DEVIATION REPORT - ALLOTMENT.pdf | 14 Feb 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- All 70 filed documents as one ZIP, foldered, with a manifest
Keep SONIGARA RAJGRUHI on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near NIGDI13,700+ in Pune
VISION VANESSA
P4 GROUP
VISION PLUS
URBAN SPACESS VERACO REALTORS
ELEGANT RESIDENCY PHASE II
ARIHANT VASTUSHILP PROPCON PRIVATE LIMITED
CITY ONE PANACHE
SHREE SAI KEYSTONE
Shuban Enclave
Sahyadri Devcon
NITAARA TOWER
M/s ABC & Mittal Realty
Builder: SHREE SONIGARA DEVELOPMENT CORPORATION
SHREE SONIGARA DEVELOPMENT CORPORATION has 1 registration on MahaRERA, including SONIGARA RAJGRUHI. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if SONIGARA RAJGRUHI is delayed beyond 31 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SONIGARA RAJGRUHI?
The registered promoter entity is SHREE SONIGARA DEVELOPMENT CORPORATION, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SONIGARA RAJGRUHI?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SONIGARA RAJGRUHI?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SONIGARA RAJGRUHI?
The professionals named in the filing: Architect: YASH JAIN; Engineer: AXIS CONSULTANTS; Chartered Accountant: VSAP & Company. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SONIGARA RAJGRUHI?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback